A BILL TO BE ENTITLED
|
|
AN ACT
|
|
relating to the issuance of revenue bonds to fund capital projects |
|
at public institutions of higher education and the designation of |
|
certain appropriated funds allocated to those institutions. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Subchapter B, Chapter 55, Education Code, is |
|
amended by adding Section 55.111 to read as follows: |
|
Sec. 55.111. CERTAIN ALLOCATED FUNDS TO BE DESIGNATED AS |
|
CAPITAL IMPROVEMENT DEBT ASSISTANCE. For purposes of this |
|
subchapter, funds allocated from the appropriation of general |
|
revenue to an institution of higher education to supplement revenue |
|
funds of the institution described by Section 55.13(a) may be |
|
designated as "Capital Improvement Debt Assistance." |
|
SECTION 2. Subchapter B, Chapter 55, Education Code, is |
|
amended by adding Sections 55.1791, 55.1792, 55.1793, 55.1794, |
|
55.1795, 55.1796, 55.1797, 55.1798, 55.1799, and 55.17991 to read |
|
as follows: |
|
Sec. 55.1791. THE TEXAS A&M UNIVERSITY SYSTEM; ADDITIONAL |
|
BONDS. (a) In addition to the other authority granted by this |
|
subchapter, the board of regents of The Texas A&M University System |
|
may acquire, purchase, construct, improve, renovate, enlarge, or |
|
equip property and facilities, including roads and related |
|
infrastructure, for projects to be financed through the issuance of |
|
bonds in accordance with this subchapter and in accordance with a |
|
systemwide revenue financing program adopted by the board for the |
|
following institutions, not to exceed the following aggregate |
|
principal amounts for the projects specified, as follows: |
|
(1) The Texas A&M University System, $43,425,406 for |
|
construction of a STEM education center at the RELLIS campus; |
|
(2) Prairie View A&M University, $44,922,833 for |
|
construction of a teaching and academic student support services |
|
facility; |
|
(3) Tarleton State University, $90 million for |
|
construction of a College of Health Sciences and Human Services |
|
building on the Stephenville campus; |
|
(4) Texas A&M University, $56,153,542 for |
|
construction of a clinical veterinary teaching and research |
|
complex; |
|
(5) Texas A&M University--Commerce, $44,922,833 for |
|
infrastructure upgrades to address accessibility for persons with |
|
disabilities and health and safety issues; |
|
(6) Texas A&M University--Corpus Christi, $44,922,833 |
|
for construction of an arts and media building; |
|
(7) Texas A&M University at Galveston, $33,692,125 for |
|
construction of an engineering classroom and research building; |
|
(8) Texas A&M University--Kingsville, $44,922,833 for |
|
renovations to address deferred maintenance for campus buildings; |
|
(9) Texas A&M University--Central Texas, $44,922,833 |
|
for construction of a central utility plant and infrastructure |
|
upgrades; |
|
(10) West Texas A&M University, $44,922,833 for |
|
infrastructure upgrades to address health and safety issues and the |
|
renovation of an education building; |
|
(11) Texas A&M University--San Antonio, $44,922,833 |
|
for construction of a public health and education building; |
|
(12) Texas A&M International University, $44,922,833 |
|
for construction of a health science education and research center; |
|
(13) Texas A&M University--Texarkana, $44,922,833 for |
|
construction of a business, engineering, and technology building; |
|
and |
|
(14) The Texas A&M University System Health Science |
|
Center: |
|
(A) $59,897,111 for construction of the Texas |
|
Medical Center Building 3 in Houston, Texas; and |
|
(B) $29,948,556 for construction of a nursing |
|
education and research center in McAllen, Texas. |
|
(b) The board may pledge irrevocably to the payment of bonds |
|
authorized by this section all or any part of the revenue funds of |
|
an institution, branch, or entity of The Texas A&M University |
|
System, including student tuition charges. The amount of a pledge |
|
made under this subsection may not be reduced or abrogated while the |
|
bonds for which the pledge is made, or bonds issued to refund those |
|
bonds, are outstanding. |
|
(c) If sufficient funds are not available to the board to |
|
meet its obligations under this section, the board may transfer |
|
funds among institutions, branches, and entities of The Texas A&M |
|
University System to ensure the most equitable and efficient |
|
allocation of available resources for each institution, branch, or |
|
entity to carry out its duties and purposes. |
|
(d) In lieu of financing a project described by Subsection |
|
(a) for an institution of higher education or entity, the board may |
|
finance in the manner prescribed by that subsection an alternative |
|
project for deferred maintenance or infrastructure at the same |
|
institution or entity in an amount not to exceed the total of the |
|
amount authorized for the project and any unspent amount from |
|
projects authorized for the institution or entity under this |
|
chapter. The board shall notify the Texas Higher Education |
|
Coordinating Board of an alternative project financed as provided |
|
by this subsection. |
|
Sec. 55.1792. THE UNIVERSITY OF TEXAS SYSTEM; ADDITIONAL |
|
BONDS. (a) In addition to the other authority granted by this |
|
subchapter, the board of regents of The University of Texas System |
|
may acquire, purchase, construct, improve, renovate, enlarge, or |
|
equip property and facilities, including roads and related |
|
infrastructure, for projects to be financed through the issuance of |
|
bonds in accordance with this subchapter and in accordance with a |
|
systemwide revenue financing program adopted by the board for the |
|
following institutions, not to exceed the following aggregate |
|
principal amounts for the projects specified, as follows: |
|
(1) The University of Texas System, $56,153,542 for |
|
renovation of the Microelectronics Research Center at the |
|
J. J. Pickle Research Campus; |
|
(2) The University of Texas at Arlington, $52,409,972 |
|
for renovation of the Life Science Building; |
|
(3) The University of Texas at Austin, $56,153,542 for |
|
renovation of the Physics, Math, and Astronomy Building; |
|
(4) The University of Texas at Dallas, $52,409,972 for |
|
construction of a student success center; |
|
(5) The University of Texas at El Paso, $52,409,972 |
|
for construction of an advanced teaching and learning complex; |
|
(6) The University of Texas of the Permian Basin, |
|
$44,922,833 for renovation of the Mesa Building and campus |
|
transformation; |
|
(7) The University of Texas Rio Grande Valley, |
|
$44,922,833 for construction of a health affairs building; |
|
(8) The University of Texas at San Antonio, |
|
$52,409,972 for construction of an Innovation, Entrepreneurship, |
|
and Careers building; |
|
(9) The University of Texas at Tyler, $44,922,833 for |
|
construction of a sciences building; |
|
(10) The University of Texas Health Science Center at |
|
Houston, $59,897,111 for construction of a public health education |
|
and research building; |
|
(11) The University of Texas Health Science Center at |
|
San Antonio, $59,897,111 for construction of the Glenn Biggs |
|
Institute for Alzheimer's & Neurodegenerative Diseases Building; |
|
(12) The University of Texas Health Science Center at |
|
Tyler: |
|
(A) $48 million for construction of a health |
|
professions education center; and |
|
(B) $10 million for construction of a health |
|
professions education center located in Longview, Texas; |
|
(13) The University of Texas M. D. Anderson Cancer |
|
Center, $59,897,111 for construction of a life sciences research, |
|
innovation, and discovery initiative facility; |
|
(14) The University of Texas Medical Branch at |
|
Galveston, $59,897,111 for infrastructure and research space |
|
upgrades for research buildings; and |
|
(15) UT Southwestern Medical Center, $59,897,111 for |
|
construction of the north campus Phase VI Brain Institute shell |
|
space. |
|
(b) The board may pledge irrevocably to the payment of bonds |
|
authorized by this section all or any part of the revenue funds of |
|
an institution, branch, or entity of The University of Texas |
|
System, including student tuition charges. The amount of a pledge |
|
made under this subsection may not be reduced or abrogated while the |
|
bonds for which the pledge is made, or bonds issued to refund those |
|
bonds, are outstanding. |
|
(c) If sufficient funds are not available to the board to |
|
meet its obligations under this section, the board may transfer |
|
funds among institutions, branches, and entities of The University |
|
of Texas System to ensure the most equitable and efficient |
|
allocation of available resources for each institution, branch, or |
|
entity to carry out its duties and purposes. |
|
(d) In lieu of financing a project described by Subsection |
|
(a) for an institution of higher education or entity, the board may |
|
finance in the manner prescribed by that subsection an alternative |
|
project for deferred maintenance or infrastructure at the same |
|
institution or entity in an amount not to exceed the total of the |
|
amount authorized for the project and any unspent amount from |
|
projects authorized for the institution or entity under this |
|
chapter. The board shall notify the Texas Higher Education |
|
Coordinating Board of an alternative project financed as provided |
|
by this subsection. |
|
Sec. 55.1793. UNIVERSITY OF HOUSTON SYSTEM; ADDITIONAL |
|
BONDS. (a) In addition to the other authority granted by this |
|
subchapter, the board of regents of the University of Houston |
|
System may acquire, purchase, construct, improve, renovate, |
|
enlarge, or equip property and facilities, including roads and |
|
related infrastructure, for projects to be financed through the |
|
issuance of bonds in accordance with this subchapter and in |
|
accordance with a systemwide revenue financing program adopted by |
|
the board for the following institutions, not to exceed the |
|
following aggregate principal amounts for the projects specified, |
|
as follows: |
|
(1) the University of Houston System: |
|
(A) $52,409,972 for construction of the Katy |
|
Academic Building 2; and |
|
(B) $59,897,111 for construction of a medical |
|
research facility; |
|
(2) the University of Houston: |
|
(A) $40 million for construction of the Hobby |
|
School of Public Affairs Building; and |
|
(B) $52,409,972 for construction of the IDEA Lab; |
|
(3) the University of Houston--Clear Lake, |
|
$44,922,833 for renovation of the Bayou Building, the Delta |
|
Building, and the Student Services and Classroom Building; |
|
(4) the University of Houston--Downtown, $44,922,833 |
|
for renovation of existing buildings and other campus |
|
infrastructure upgrades and for the construction of the Police |
|
Department and Criminal Justice Academy Building; and |
|
(5) the University of Houston--Victoria, $44,922,833 |
|
for renovation of existing buildings and other campus |
|
infrastructure upgrades. |
|
(b) The board may pledge irrevocably to the payment of bonds |
|
authorized by this section all or any part of the revenue funds of |
|
an institution, branch, or entity of the University of Houston |
|
System, including student tuition charges. The amount of a pledge |
|
made under this subsection may not be reduced or abrogated while the |
|
bonds for which the pledge is made, or bonds issued to refund those |
|
bonds, are outstanding. |
|
(c) If sufficient funds are not available to the board to |
|
meet its obligations under this section, the board may transfer |
|
funds among institutions, branches, and entities of the University |
|
of Houston System to ensure the most equitable and efficient |
|
allocation of available resources for each institution, branch, or |
|
entity to carry out its duties and purposes. |
|
(d) In lieu of financing a project described by Subsection |
|
(a) for an institution of higher education or entity, the board may |
|
finance in the manner prescribed by that subsection an alternative |
|
project for deferred maintenance or infrastructure at the same |
|
institution or entity in an amount not to exceed the total of the |
|
amount authorized for the project and any unspent amount from |
|
projects authorized for the institution or entity under this |
|
chapter. The board shall notify the Texas Higher Education |
|
Coordinating Board of an alternative project financed as provided |
|
by this subsection. |
|
Sec. 55.1794. TEXAS STATE UNIVERSITY SYSTEM; ADDITIONAL |
|
BONDS. (a) In addition to the other authority granted by this |
|
subchapter, the board of regents of the Texas State University |
|
System may acquire, purchase, construct, improve, renovate, |
|
enlarge, or equip property and facilities, including roads and |
|
related infrastructure, for projects to be financed through the |
|
issuance of bonds in accordance with this subchapter and in |
|
accordance with a systemwide revenue financing program adopted by |
|
the board for the following institutions, not to exceed the |
|
following aggregate principal amounts for the projects specified, |
|
as follows: |
|
(1) Texas State University System, $11,230,708 for |
|
construction of a field research station and dam repair; |
|
(2) Lamar State College--Orange, $37,435,695 for the |
|
replacement of an academic building to house general academic |
|
instruction and information technology services; |
|
(3) Lamar State College--Port Arthur, $37,435,695 for |
|
construction of an allied health and sciences building; |
|
(4) Lamar Institute of Technology, $37,435,695 for |
|
construction of a facility for workforce and allied health |
|
programs; |
|
(5) Lamar University, $44,922,833 for renovation of a |
|
library; |
|
(6) Sul Ross State University, $26,392,165 for |
|
renovation of fine arts facilities; |
|
(7) Sul Ross State University Rio Grande College, |
|
$33,119,359 for construction of a multipurpose education and |
|
services building; |
|
(8) Sam Houston State University: |
|
(A) $44,922,833 for construction of an allied |
|
health building located in Conroe, Texas; and |
|
(B) $44,922,833 for construction of an active |
|
learning center located in Huntsville, Texas; and |
|
(9) Texas State University: |
|
(A) $52,409,972 for construction of a STEM |
|
classroom building located in San Marcos, Texas; and |
|
(B) $52,409,972 for construction of a health |
|
professions building located in Round Rock, Texas. |
|
(b) The board may pledge irrevocably to the payment of bonds |
|
authorized by this section all or any part of the revenue funds of |
|
an institution, branch, or entity of the Texas State University |
|
System, including student tuition charges. The amount of a pledge |
|
made under this subsection may not be reduced or abrogated while the |
|
bonds for which the pledge is made, or bonds issued to refund those |
|
bonds, are outstanding. |
|
(c) If sufficient funds are not available to the board to |
|
meet its obligations under this section, the board may transfer |
|
funds among institutions, branches, and entities of the Texas State |
|
University System to ensure the most equitable and efficient |
|
allocation of available resources for each institution, branch, or |
|
entity to carry out its duties and purposes. |
|
(d) In lieu of financing a project described by Subsection |
|
(a) for an institution of higher education or entity, the board may |
|
finance in the manner prescribed by that subsection an alternative |
|
project for deferred maintenance or infrastructure at the same |
|
institution or entity in an amount not to exceed the total of the |
|
amount authorized for the project and any unspent amount from |
|
projects authorized for the institution or entity under this |
|
chapter. The board shall notify the Texas Higher Education |
|
Coordinating Board of an alternative project financed as provided |
|
by this subsection. |
|
Sec. 55.1795. UNIVERSITY OF NORTH TEXAS SYSTEM; ADDITIONAL |
|
BONDS. (a) In addition to the other authority granted by this |
|
subchapter, the board of regents of the University of North Texas |
|
System may acquire, purchase, construct, improve, renovate, |
|
enlarge, or equip property and facilities, including roads and |
|
related infrastructure, for projects to be financed through the |
|
issuance of bonds in accordance with this subchapter and in |
|
accordance with a systemwide revenue financing program adopted by |
|
the board for the following institutions, not to exceed the |
|
following aggregate principal amounts for the projects specified, |
|
as follows: |
|
(1) the University of North Texas: |
|
(A) $52,409,472 for construction of a science and |
|
technology research building; and |
|
(B) $52,409,472 for construction of a commerce, |
|
analytics, technology, and engineering building in Frisco, Texas; |
|
(2) the University of North Texas at Dallas, |
|
$100,000,000 for construction of a science building; and |
|
(3) the University of North Texas Health Science |
|
Center at Fort Worth, $59,987,111 for campus space optimization and |
|
realignment. |
|
(b) The board may pledge irrevocably to the payment of bonds |
|
authorized by this section all or any part of the revenue funds of |
|
an institution, branch, or entity of the University of North Texas |
|
System, including student tuition charges. The amount of a pledge |
|
made under this subsection may not be reduced or abrogated while the |
|
bonds for which the pledge is made, or bonds issued to refund those |
|
bonds, are outstanding. |
|
(c) If sufficient funds are not available to the board to |
|
meet its obligations under this section, the board may transfer |
|
funds among institutions, branches, and entities of the University |
|
of North Texas System to ensure the most equitable and efficient |
|
allocation of available resources for each institution, branch, or |
|
entity to carry out its duties and purposes. |
|
(d) In lieu of financing a project described by Subsection |
|
(a) for an institution of higher education or entity, the board may |
|
finance in the manner prescribed by that subsection an alternative |
|
project for deferred maintenance or infrastructure at the same |
|
institution or entity in an amount not to exceed the total of the |
|
amount authorized for the project and any unspent amount from |
|
projects authorized for the institution or entity under this |
|
chapter. The board shall notify the Texas Higher Education |
|
Coordinating Board of an alternative project financed as provided |
|
by this subsection. |
|
Sec. 55.1796. TEXAS WOMAN'S UNIVERSITY; ADDITIONAL BONDS. |
|
(a) In addition to the other authority granted by this subchapter, |
|
the board of regents of Texas Woman's University may acquire, |
|
purchase, construct, improve, renovate, enlarge, or equip property |
|
and facilities, including roads and related infrastructure, for a |
|
health sciences center, to be financed through the issuance of |
|
bonds in accordance with this subchapter, not to exceed the |
|
aggregate principal amount of $100 million. |
|
(b) The board may pledge irrevocably to the payment of bonds |
|
authorized by this section all or any part of the revenue funds of |
|
Texas Woman's University, including student tuition charges. The |
|
amount of a pledge made under this subsection may not be reduced or |
|
abrogated while the bonds for which the pledge is made, or bonds |
|
issued to refund those bonds, are outstanding. |
|
(c) In lieu of financing a project described by Subsection |
|
(a) for Texas Woman's University, the board may finance in the |
|
manner prescribed by that subsection an alternative project for |
|
deferred maintenance or infrastructure at the university in an |
|
amount not to exceed the total of the amount authorized for the |
|
project and any unspent amount from projects authorized for the |
|
university under this chapter. The board shall notify the Texas |
|
Higher Education Coordinating Board of an alternative project |
|
financed as provided by this subsection. |
|
Sec. 55.1797. STEPHEN F. AUSTIN STATE UNIVERSITY; |
|
ADDITIONAL BONDS. (a) In addition to the other authority granted |
|
by this subchapter, the board of regents of Stephen F. Austin State |
|
University may acquire, purchase, construct, improve, renovate, |
|
enlarge, or equip property and facilities, including roads and |
|
related infrastructure, for construction of an interdisciplinary |
|
and applied sciences building, to be financed through the issuance |
|
of bonds in accordance with this subchapter, not to exceed the |
|
aggregate principal amount of $44,922,833. |
|
(b) The board may pledge irrevocably to the payment of bonds |
|
authorized by this section all or any part of the revenue funds of |
|
Stephen F. Austin State University, including student tuition |
|
charges. The amount of a pledge made under this subsection may not |
|
be reduced or abrogated while the bonds for which the pledge is |
|
made, or bonds issued to refund those bonds, are outstanding. |
|
(c) In lieu of financing a project described by Subsection |
|
(a) for Stephen F. Austin State University, the board may finance in |
|
the manner prescribed by that subsection an alternative project for |
|
deferred maintenance or infrastructure at the university in an |
|
amount not to exceed the total of the amount authorized for the |
|
project and any unspent amount from projects authorized for the |
|
university under this chapter. The board shall notify the Texas |
|
Higher Education Coordinating Board of an alternative project |
|
financed as provided by this subsection. |
|
Sec. 55.1798. TEXAS TECH UNIVERSITY SYSTEM; ADDITIONAL |
|
BONDS. (a) In addition to the other authority granted by this |
|
subchapter, the board of regents of the Texas Tech University |
|
System may acquire, purchase, construct, improve, renovate, |
|
enlarge, or equip property and facilities, including roads and |
|
related infrastructure, for projects to be financed through the |
|
issuance of bonds in accordance with this subchapter and in |
|
accordance with a systemwide revenue financing program adopted by |
|
the board for the following institutions, not to exceed the |
|
following aggregate principal amounts for the projects specified, |
|
as follows: |
|
(1) Angelo State University, $36 million for a central |
|
plant maintenance and renovation; |
|
(2) Texas Tech University, $52,409,972 for |
|
renovations to address deferred maintenance for campus buildings; |
|
(3) Midwestern State University, $44,922,833 for |
|
renovations to an existing building and other campus infrastructure |
|
upgrades; |
|
(4) Texas Tech University Health Sciences Center: |
|
(A) $59,897,111 for maintenance and renovation |
|
of an existing facility; and |
|
(B) $18,717,847 for construction and equipment |
|
of the physician assistant facility in Midland, Texas; and |
|
(5) Texas Tech University Health Sciences Center at El |
|
Paso, $59,897,111 for construction of a dental school building. |
|
(b) The board may pledge irrevocably to the payment of bonds |
|
authorized by this section all or any part of the revenue funds of |
|
an institution, branch, or entity of the Texas Tech University |
|
System, including student tuition charges. The amount of a pledge |
|
made under this subsection may not be reduced or abrogated while the |
|
bonds for which the pledge is made, or bonds issued to refund those |
|
bonds, are outstanding. |
|
(c) If sufficient funds are not available to the board to |
|
meet its obligations under this section, the board may transfer |
|
funds among institutions, branches, and entities of the Texas Tech |
|
University System to ensure the most equitable and efficient |
|
allocation of available resources for each institution, branch, or |
|
entity to carry out its duties and purposes. |
|
(d) In lieu of financing a project described by Subsection |
|
(a) for an institution of higher education or entity, the board may |
|
finance in the manner prescribed by that subsection an alternative |
|
project for deferred maintenance or infrastructure at the same |
|
institution or entity in an amount not to exceed the total of the |
|
amount authorized for the project and any unspent amount from |
|
projects authorized for the institution or entity under this |
|
chapter. The board shall notify the Texas Higher Education |
|
Coordinating Board of an alternative project financed as provided |
|
by this subsection. |
|
Sec. 55.1799. TEXAS SOUTHERN UNIVERSITY; ADDITIONAL BONDS. |
|
(a) In addition to the other authority granted by this subchapter, |
|
the board of regents of Texas Southern University may acquire, |
|
purchase, construct, improve, renovate, enlarge, or equip property |
|
and facilities, including roads and related infrastructure, for |
|
projects to be financed through the issuance of bonds in accordance |
|
with this subchapter, not to exceed the following aggregate |
|
principal amounts for the projects specified, as follows: |
|
(1) $22,800,000 for renovation of the Nabrit Building; |
|
(2) $2,400,000 for upgrades to signage and wayfinding; |
|
(3) $40 million for facility maintenance and |
|
renovation; and |
|
(4) $30 million for construction of a health and |
|
wellness center. |
|
(b) The board may pledge irrevocably to the payment of bonds |
|
authorized by this section all or any part of the revenue funds of |
|
Texas Southern University, including student tuition charges. The |
|
amount of a pledge made under this subsection may not be reduced or |
|
abrogated while the bonds for which the pledge is made, or bonds |
|
issued to refund those bonds, are outstanding. |
|
(c) In lieu of financing a project described by Subsection |
|
(a) for Texas Southern University, the board may finance in the |
|
manner prescribed by that subsection an alternative project for |
|
deferred maintenance or infrastructure at the university in an |
|
amount not to exceed the total of the amount authorized for the |
|
project and any unspent amount from projects authorized for the |
|
university under this chapter. The board shall notify the Texas |
|
Higher Education Coordinating Board of an alternative project |
|
financed as provided by this subsection. |
|
Sec. 55.17991. TEXAS STATE TECHNICAL COLLEGE SYSTEM. (a) |
|
In addition to the other authority granted by this subchapter, the |
|
board of regents of the Texas State Technical College System may |
|
acquire, purchase, construct, improve, renovate, enlarge, or equip |
|
property and facilities, including roads and related |
|
infrastructure, for projects to be financed through the issuance of |
|
bonds in accordance with this subchapter for the following entity |
|
and institutions, not to exceed the following aggregate principal |
|
amounts for the projects specified, as follows: |
|
(1) Texas State Technical College System, $24,932,173 |
|
for the East Williamson County Higher Education Center expansion; |
|
(2) Texas State Technical College--Fort Bend, |
|
$31,296,241 for Fort Bend County campus expansion; |
|
(3) Texas State Technical College--Harlingen, |
|
$28,301,385 for Harlingen campus expansion; |
|
(4) Texas State Technical College--Marshall, |
|
$11,230,708 for Marshall campus expansion; |
|
(5) Texas State Technical College--North Texas, |
|
$10,107,638 for North Texas campus expansion; |
|
(6) Texas State Technical College--West Texas, |
|
$10,107,638 for West Texas campus expansion; and |
|
(7) Texas State Technical College--Waco, $37,435,695 |
|
for Waco campus expansion. |
|
(b) The board may pledge irrevocably to the payment of bonds |
|
authorized by this section all or any part of the revenue funds of |
|
an institution, branch, or entity of the Texas State Technical |
|
College System, including student tuition charges. The amount of a |
|
pledge made under this subsection may not be reduced or abrogated |
|
while the bonds for which the pledge is made, or bonds issued to |
|
refund those bonds, are outstanding. |
|
(c) If sufficient funds are not available to the board to |
|
meet its obligations under this section, the board may transfer |
|
funds among institutions, branches, and entities of the Texas State |
|
Technical College System to ensure the most equitable and efficient |
|
allocation of available resources for each institution, branch, or |
|
entity to carry out its duties and purposes. |
|
(d) In lieu of financing a project described by Subsection |
|
(a) for an institution of higher education or entity, the board may |
|
finance in the manner prescribed by that subsection an alternative |
|
project for deferred maintenance or infrastructure at the same |
|
institution or entity in an amount not to exceed the total of the |
|
amount authorized for the project and any unspent amount from |
|
projects authorized for the institution or entity under this |
|
chapter. The board shall notify the Texas Higher Education |
|
Coordinating Board of an alternative project financed as provided |
|
by this subsection. |
|
SECTION 3. This Act does not affect any authority or |
|
restriction regarding the activities that a public institution of |
|
higher education may conduct in connection with a facility financed |
|
by bonds authorized by this Act. |
|
SECTION 4. This Act takes effect on the 91st day after the |
|
last day of the legislative session. |