87R9632 JXC-F
 
  By: Huberty H.B. No. 4478
 
 
 
A BILL TO BE ENTITLED
 
AN ACT
  relating to planning and financial responsibility requirements for
  certain aggregate production operations; providing for the
  imposition of an administrative penalty.
         BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
         SECTION 1.  The heading to Chapter 28A, Water Code, is
  amended to read as follows:
  CHAPTER 28A. [REGISTRATION AND INSPECTION OF CERTAIN] AGGREGATE
  PRODUCTION OPERATIONS
         SECTION 2.  Chapter 28A, Water Code, is amended by adding
  Subchapter D to read as follows:
  SUBCHAPTER D. PLANNING AND FINANCIAL RESPONSIBILITY
         Sec. 28A.151.  DEFINITION. In this subchapter, "water body"
  means a navigable watercourse, river, stream, or lake.
         Sec. 28A.152.  APPLICABILITY. This subchapter applies only
  to an aggregate production operation the site of which is located
  not more than 1,500 feet from the San Jacinto River.
         Sec. 28A.153.  RESTORATION PLAN. (a)  In this section,
  "restore" means to change the physical, chemical, or biological
  qualities of a receiving water body in order to return the water
  body to its background condition, including on- and off-site
  stabilization to reduce or eliminate an unauthorized discharge or a
  substantial threat of an unauthorized discharge.
         (b)  The initial application filed by the responsible party
  for the registration of an aggregate production operation must
  include a proposed plan for how the responsible party will restore a
  receiving water body affected by an unauthorized discharge from the
  operation. The responsible party shall update the plan as needed
  with each renewal of the registration of the operation.
         (c)  The restoration plan must:
               (1)  identify receiving water bodies at risk of an
  unauthorized discharge from the aggregate production operation;
               (2)  describe the process to be used in documenting the
  existing physical, chemical, and biological background conditions
  of each of the adjacent receiving water bodies;
               (3)  provide a schedule for completing the
  determination of background conditions of each of the receiving
  water bodies and for updating background conditions in the future,
  as appropriate;
               (4)  identify the goals and objectives of potential
  restoration actions;
               (5)  provide a reasonable range of restoration
  alternatives and the preferred restoration alternative that may be
  implemented to return affected receiving water bodies to background
  conditions in the event of an unauthorized discharge;
               (6)  describe the process for monitoring the
  effectiveness of the preferred restoration action, including
  performance criteria, that will be used to determine the success of
  the restoration or need for interim site stabilization;
               (7)  identify a process for public involvement in the
  selection of the restoration alternative to be implemented to
  restore the receiving water bodies to background conditions; and
               (8)  provide a detailed estimate of the maximum
  probable cost, based on the cost to a third party conducting the
  action without a financial interest or ownership in the operation,
  of completing a restoration action, given the size, location, and
  description of the operation and the nature of the receiving water
  bodies.
         (d)  The responsible party must submit to the commission
  certification of the restoration plan, within the appropriate area
  or discipline, issued by a licensed engineer or licensed
  geoscientist. Components of the restoration plan may be
  independently certified, as appropriate.
         Sec. 28A.154.  RECLAMATION PLAN. (a)  In this section,
  "reclaim" means to use land treatment processes designed to
  minimize degradation of water quality, damage to fish or wildlife
  habitat, erosion, and other adverse effects from aggregate
  production operations and includes backfilling, soil stabilization
  and compacting, grading, erosion control measures, appropriate
  revegetation, or other measures, as appropriate.
         (b)  The initial application filed by the responsible party
  for the registration of an aggregate production operation must
  include a proposed plan for how the responsible party will reclaim
  the area disturbed by the operation. The responsible party shall
  update the plan as needed with each renewal of the registration of
  the operation.
         (c)  The reclamation plan must:
               (1)  provide a description of the proposed use of the
  disturbed area following reclamation;
               (2)  develop site-specific standards for reclamation
  appropriate to the proposed use that address the following:
                     (A)  removal or final stabilization of all raw
  material, intermediate material, final product, waste product,
  byproduct, and ancillary material;
                     (B)  removal of waste or closure of all waste
  disposal areas;
                     (C)  removal of structures, where appropriate;
                     (D)  removal and reclamation of all temporary
  roads and railroads;
                     (E)  backfilling, regrading, and recontouring;
                     (F)  slope stability for remaining highwalls and
  detention ponds;
                     (G)  revegetation of the reclaimed area, giving
  consideration to species diversity and the use of native species;
                     (H)  establishment of wildlife habitat;
                     (I)  establishment of drainage patterns;
                     (J)  establishment of permanent control
  structures, such as retention ponds, where necessary to address
  erosion, siltation, and runoff from post-aggregate production and
  reclaimed areas; and
                     (K)  removal of all equipment; and
               (3)  provide a description of how reclamation will be
  conducted, such as in phases, and a timetable for the completion of
  reclamation activities.
         (d)  The reclamation plan must include a detailed estimate of
  the maximum probable cost required to complete and implement the
  plan, including inflation costs. The maximum probable cost must be
  based on the cost to a third party conducting the reclamation
  without a financial interest or ownership in the aggregate
  production operation.
         (e)  The responsible party must submit to the commission
  certification of the reclamation plan, within the appropriate area
  or discipline, issued by a licensed engineer or licensed
  geoscientist. Components of the reclamation plan may be
  independently certified, as appropriate.
         Sec. 28A.155.  FINANCIAL RESPONSIBILITY. (a) The
  commission by rule shall require the responsible party for an
  aggregate production operation to establish and maintain, until the
  commission determines that the responsible party has successfully
  complied with all restoration and reclamation requirements of this
  subchapter and the restoration and reclamation plans, evidence of
  financial responsibility for:
               (1)  restoration of a water body affected by an
  unauthorized discharge from the operation; and
               (2)  reclamation of the area disturbed by the
  operation.
         (b)  The amount of financial assurance must be at least the
  amount determined by the executive director of the commission as
  sufficient to meet the requirements of the:
               (1)  restoration plan filed for the aggregate
  production operation under Section 28A.153; and
               (2)  reclamation plan filed for the aggregate
  production operation under Section 28A.154.
         Sec. 28A.156.  PENALTY. The commission may assess a penalty
  of not less than $5,000 and not more than $20,000 for each year in
  which an aggregate production operation operates without
  maintaining the evidence of financial responsibility required by
  Section 28A.155. The total penalty under this section may not
  exceed $40,000 for an aggregate production operation that is
  operated in three or more years without maintaining the evidence of
  financial responsibility.
         Sec. 28A.157.  RECOVERY OF COSTS FOR UNAUTHORIZED
  DISCHARGES. If the commission incurs any costs in undertaking a
  corrective or enforcement action with respect to an unauthorized
  discharge from an aggregate production operation to which this
  subchapter applies, including a reclamation or restoration action,
  the responsible party is liable to the state for all reasonable
  costs of the corrective or enforcement action, including court
  costs and reasonable attorney's fees, and for any punitive damages
  that may be assessed by the court.
         Sec. 28A.158.  AGGREGATE PRODUCTION OPERATION RECLAMATION
  AND RESTORATION FUND ACCOUNT. (a) Penalties and other money
  received by the commission as a result of an enforcement action
  taken under this subchapter, and any gift or grant the commission
  receives for the purposes of this subchapter, shall be deposited in
  the aggregate production operation reclamation and restoration
  fund account in the general revenue fund. Money in the account may
  be appropriated only to the commission for the reclamation and
  restoration of the beds, bottoms, and banks of water bodies
  affected by the unlawful discharges subject to this subchapter.
         (b)  At least 60 days before spending money from the
  reclamation and restoration fund account, the commission shall
  publish notice of its proposed plan and conduct a hearing for the
  purpose of soliciting public comment, oral or written. The
  commission shall fully consider all written and oral submissions on
  the proposed plan.
         (c)  At least 30 days before the date of the public hearing,
  the notice must be published in the Texas Register and in a
  newspaper of general circulation in the county where the violation
  resulting in the payment of the penalties or other money occurred.
         (d)  Interest and other income earned on money in the account
  shall be credited to the account. The account is exempt from the
  application of Section 403.095, Government Code.
         SECTION 3.  (a)  This section applies only to an aggregate
  production operation, as defined by Section 28A.001, Water Code,
  that is registered under Chapter 28A, Water Code, before the
  effective date of this Act.
         (b)  The responsible party for an aggregate production
  operation to which Subchapter D, Chapter 28A, Water Code, as added
  by this Act, applies shall:
               (1)  file the restoration and reclamation plans
  required by that subchapter with the Texas Commission on
  Environmental Quality with the first renewal of the registration of
  the operation that occurs after the effective date of this Act; and
               (2)  establish the evidence of financial
  responsibility required by that subchapter not later than the date
  of the first renewal of the registration of the operation that
  occurs after the effective date of this Act.
         SECTION 4.  This Act takes effect September 1, 2021.