R E S O L U T I O N
|
|
|
BE IT RESOLVED by the House of Representatives of the State of |
|
Texas, 87th Legislature, Regular Session 2021, That House Rule 13, |
|
Section 9(a), be suspended in part as provided by House Rule 13, |
|
Section 9(f), to enable the conference committee appointed to |
|
resolve the differences on Senate Bill 1281 (a reliability |
|
assessment of the ERCOT power grid and certificates of public |
|
convenience and necessity for certain transmission projects) to |
|
consider and take action on the following matter: |
|
House Rule 13, Sections 9(a)(1) and (3) are suspended to |
|
permit the committee to change, alter, or amend text which is not in |
|
disagreement and add text on a matter which is not in disagreement |
|
in proposed SECTION 1 of the bill by adding Sections |
|
37.052(c)(1)(A) and (B), Utilities Code, to read as follows: |
|
(1) the transmission line does not exceed: |
|
(A) three miles in length, if the line connects |
|
to a load-serving substation or metering point; or |
|
(B) two miles in length, if the line connects to a |
|
generation substation or metering point; |
|
Explanation: The change is necessary to distinguish that an |
|
electric transmission line to which Subsection 37.056(c), |
|
Utilities Code, as added by this bill, applies must measure three |
|
miles or less for a load-serving electric transmission line and two |
|
miles or less for an electric transmission line that connects to |
|
power generation. |