A BILL TO BE ENTITLED
|
|
AN ACT
|
|
relating to location requirements for the construction of certain |
|
wind-powered energy devices. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Title 6, Utilities Code, is amended by adding |
|
Chapter 302 to read as follows: |
|
CHAPTER 302. WIND TURBINE SITING |
|
Sec. 302.0001. SITING. (a) A person may not construct at a |
|
site a wind turbine for electric generation unless the site |
|
complies with the minimum setback requirements provided by this |
|
section. |
|
(b) The minimum setback for a wind turbine is 3,000 feet |
|
measured from the property line of each property that borders the |
|
property on which the site is located. |
|
(c) The setback distance described by Subsection (b) must be |
|
measured as a straight line from the vertical centerline of the |
|
proposed wind turbine to the nearest point on the property line. |
|
(d) This section does not create an offense. |
|
Sec. 302.0002. SITING WAIVER. (a) A person may begin |
|
construction of a wind turbine at a site that does not comply with |
|
the requirements of Section 302.0001 if the person obtains a |
|
signed, written waiver from the owner of the property that is the |
|
source of the noncompliance. |
|
(b) A waiver may not be made effective for a period of more |
|
than one year after the date the owner signs the waiver. A waiver |
|
may be retroactive for any period of time. |
|
Sec. 302.0003. INJUNCTION. (a) A county or district court |
|
by injunction may prevent, restrain, abate, or otherwise remedy a |
|
violation of this chapter. |
|
(b) A person affected or who may be affected by a violation |
|
or threatened violation of this chapter may bring suit under |
|
Subsection (a). |
|
SECTION 2. Chapter 240, Local Government Code, is amended |
|
by adding Subchapter F to read as follows: |
|
SUBCHAPTER F. WIND-POWERED ENERGY DEVICES |
|
Sec. 240.101. DEFINITIONS. In this subchapter: |
|
(1) "Military aviation facility" means a base, |
|
station, fort, or camp at which fixed-wing aviation operations or |
|
training is conducted by the United States Air Force, the United |
|
States Air Force Reserve, the United States Army, the United States |
|
Army Reserve, the United States Navy, the United States Navy |
|
Reserve, the United States Marine Corps, the United States Marine |
|
Corps Reserve, the United States Coast Guard, the United States |
|
Coast Guard Reserve, or the Texas National Guard. |
|
(2) "Wind-powered energy device" means an apparatus |
|
designed or adapted to: |
|
(A) convert the energy available in the wind into |
|
thermal, mechanical, or electrical energy; |
|
(B) store the energy converted under Paragraph |
|
(A), either in the form to which originally converted or another |
|
form; or |
|
(C) distribute the energy converted under |
|
Paragraph (A). |
|
Sec. 240.102. APPLICABILITY OF SUBCHAPTER. This subchapter |
|
applies only to a county: |
|
(1) that is located adjacent to an international |
|
border; and |
|
(2) in which a military aviation facility that trains |
|
military personnel to pilot aircraft and a national recreation area |
|
are located. |
|
Sec. 240.103. DESIGNATION OF CONSTRUCTION AREAS. (a) The |
|
commissioners court of a county by order may, in collaboration with |
|
the military aviation facility located in the county: |
|
(1) designate one or more appropriate locations for a |
|
person to install a wind-powered energy device in the |
|
unincorporated area of the county in accordance with this section; |
|
and |
|
(2) prohibit the installation of a wind-powered energy |
|
device in the county in an area other than a designated area. |
|
(b) An order under Subsection (a) may not apply to a |
|
wind-powered energy device installed before the effective date of |
|
the order. |
|
(c) Areas designated by a county under Subsection (a) must |
|
maintain compatibility with the activities of the military aviation |
|
facility. |
|
SECTION 3. Chapter 302, Utilities Code, as added by this |
|
Act, applies only to a wind turbine the construction of which begins |
|
on or after the effective date of this Act. Construction of a wind |
|
turbine that began before the effective date of this Act is governed |
|
by the law as it existed immediately before the effective date of |
|
this Act, and the former law is continued in effect for that |
|
purpose. |
|
SECTION 4. This Act takes effect September 1, 2021. |