A BILL TO BE ENTITLED
|
|
AN ACT
|
|
relating to boundaries of the Anthem Municipal Utility District; |
|
affecting the authority to issue bonds. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Subchapter A, Chapter 7979, Special District |
|
Local Laws Code, is amended by adding Section 7979.004 to read as |
|
follows: |
|
Sec. 7979.004. DISTRICT TERRITORY. (a) The district is |
|
composed of the territory described by Section 3 of the Act enacting |
|
this section. |
|
(b) The boundaries and field notes contained in Section 3 of |
|
the Act enacting this section form a closure. A mistake made in the |
|
field notes or in copying the field notes in the legislative process |
|
does not affect the district's: |
|
(1) organization, existence, or validity; |
|
(2) right to issue any type of bond for the purposes |
|
for which the district is created or to pay the principal of and |
|
interest on a bond; |
|
(3) right to impose a tax; or |
|
(4) legality or operation. |
|
SECTION 2. Section 7979.101, Special District Local Laws |
|
Code, is amended by adding Subsection (d) to read as follows: |
|
(d) Section 49.303(d), Water Code, does not apply to the |
|
district. The district may rely on a previously held election for |
|
the approval to issue bonds payable in whole or in part from taxes |
|
after the exclusion of territory described by the Act enacting this |
|
section. |
|
SECTION 3. The Anthem Municipal Utility District includes |
|
all the territory contained in the following area: |
|
BEING 422.996 ACRES OF LAND LOCATED IN THE ANDREW DUNN LEAGUE, |
|
ABSTRACT NO. 4, THE JOHN COOPER SURVEY NO. 13, ABSTRACT NO. 100 AND |
|
THE JESSE DAY SURVEY, ABSTRACT 152 IN HAYS COUNTY, TEXAS AND BEING A |
|
PORTION OF THE SAME LAND CONVEYED TO MOUNTAIN CITY-150, L.P., |
|
CALLED TRACT 1, A 599.25 ACRE TRACT AND TRACT 2 A CALLED 73.693 ACRE |
|
TRACT AS DESCRIBED IN VOLUME 5272, PAGE 475 AND A CALLED 857 SQUARE |
|
FOOT TRACT 3 AND A 0.308 ACRE TRACT 4 AS DESCRIBED IN VOLUME 5272, |
|
PAGE 490 OF THE OFFICIAL PUBLIC RECORDS OF HAYS COUNTY, TEXAS; SAID |
|
422.996 ACRES OF LAND BEING MORE PARTICULARLY DESCRIBED BY METES |
|
AND BOUNDS AS FOLLOWS: |
|
BEGINNING at a 1/2-inch iron rod located on the northwesterly right |
|
of way line of RM 150, an 80 foot wide public right of way, for the |
|
southwest corner of said 73.693 acre Tract 2, same being the |
|
northwest corner of a called 17.95 acre tract described in a deed to |
|
Robert and Linda Rosebrock recorded in Volume 1126, Page 236 of the |
|
Hays County Deed Records; |
|
THENCE, with the northwest right of way line of said RM 150 the |
|
following courses and distances: |
|
(1) N45°54'47"W, 312.73 feet with the westerly line of said |
|
73.693 acre tract to a Texas Department of Transportation Type 1 |
|
Concrete Monument; |
|
(2) N44°00'03"W, 1476.41 feet tract to a Texas Department of |
|
Transportation Type 1 Concrete Monument found at the beginning of a |
|
curve to the left; |
|
(3) with the arc of said curve to the left, passing the most |
|
southerly southwest corner of said 599.25 acre tract, a found |
|
3/8-inch iron rod at an arc distance of 39.42 feet, passing the |
|
southerly corner of a 875 square foot and 0.308 acre tract described |
|
in a deed to Mountain City - 150, L.P. in Volume 5272, Page 490 and |
|
continuing for an arc distance of 568.29 feet, having a radius of |
|
1185.90 feet, a central angle of 27°27'23" and a chord bearing and |
|
distance of N57°43'45"W, 562.87 feet to a 1/2-inch iron rod with cap |
|
stamped "AST" set for corner on said northwesterly right of way |
|
line, same being on the southerly line of a called 581.00 acre tract |
|
described in a deed to M I W L S, LP and being a re-entrant corner |
|
and most westerly south corner of the herein described tract; |
|
THENCE, leaving the northwesterly right of way line of RM 150 and |
|
with the common line of said 581.00 acre tract and said 599.25 acre |
|
tract the following courses and distances: |
|
(1) N88°36'39"E, 1422.09 feet to a 1/2-inch iron pipe found |
|
for an angle point in said line; |
|
(2) N88°38'02"E, 25.14 feet to a Mag Nail in concrete for an |
|
interior ell corner of the herein described tract; |
|
(3) N01°42'12"W, 2818.15 feet to a found 8-inch diameter |
|
Cedar Fence Post for an interior ell corner of the herein described |
|
tract; |
|
(4) S87°57'12"W, 2442.13 feet to a found 8-inch diameter |
|
Cedar Fence Post for an exterior ell corner of the herein described |
|
tract, same being the southeast corner of said 752.05 acre tract; |
|
THENCE, with the westerly line of said 599.25 acre tract, same being |
|
the easterly line of said 752.05 acre tract the following courses |
|
and distances: |
|
(1) N01°27'27"E, 1085.94 feet to a 1/2-inch iron rod with cap |
|
stamped "AST" found; |
|
THENCE, leaving said westerly line and crossing said 599.25 acre |
|
tract the following courses and distances; |
|
(2) N42°57'57"E, 440.38 feet to a 1/2-inch iron rod with cap |
|
stamped "AST" found for corner; |
|
(3) N20°52'40"E, 1067.39 feet to a 1/2-inch iron rod with cap |
|
stamped "AST" found for corner; |
|
(4) N37°09'29"E, 492.15 feet to a 1/2-inch iron rod with cap |
|
stamped "AST" found for corner; |
|
(5) S85°09'20"E, 319.53 feet to a 1/2-inch iron rod with cap |
|
stamped "AST" found for corner; |
|
(6) N84°25'47"E, 294.59 feet to a 1/2-inch iron rod with cap |
|
stamped "AST" found for corner to the beginning of a curve to the |
|
left; |
|
(7) with the arc of a non-tangent curve to the left, 511.24 |
|
feet, having a radius of 871.82 feet, a central angle of 33°35'56" |
|
and a chord bearing and distance of N68°19'13"E, 503.95 feet to a |
|
1/2-inch iron rod with cap stamped "AST" found for corner and a |
|
point of compound curvature; |
|
(8) with a compound curve to the left, 763.84 feet, having a |
|
radius of 1431.82 feet, a central angle of 30°33'56" and a chord |
|
bearing and distance of N32°21'48"E, 754.81 feet to a 1/2-inch iron |
|
rod with cap stamped "AST" found for corner; |
|
(9) N08°59'58"E, 277.34 feet to a 1/2-inch iron rod with cap |
|
stamped "AST" found for corner; |
|
(10) N09°56'17"E, 409.55 feet to a 1/2-inch iron rod with cap |
|
stamped "AST" found for corner; |
|
(11) with the arc of a non-tangent curve to the left, 835.46 |
|
feet, having a radius of 2082.16 feet, a central angle of 22°59'23" |
|
and a chord bearing and distance of N48°50'55"E, 829.87 feet to a |
|
1/2-inch iron rod with cap stamped "AST" found for corner; |
|
(12) N37°50'06"E, 277.44 feet to a 1/2-inch iron rod with cap |
|
stamped "AST" found for corner; |
|
(13) N45°32'16"E, 192.35 feet to a 1/2-inch iron rod with cap |
|
stamped "AST" found for corner on the southwesterly line of a called |
|
1974.77 acre tract described in a deed as Tract 6, and recorded in |
|
Volume 3533, Page 150 of said deed records and being on the |
|
northeasterly line of said 599.25 acre tract; |
|
THENCE, with said southwesterly line, same being the northeasterly |
|
line of said 599.25 acre tract, S47°09'20"E, 189.32 feet to a 5-inch |
|
diameter Cedar fence post found with 3 mag nails and shiner at the |
|
north corner of Tract 4, Indian Creek Ranch Subdivision as recorded |
|
in Volume 6, Page 59 of the Hays County Plat Records; |
|
THENCE, leaving the southwesterly line of said 1974.77 acre tract, |
|
and with easterly line of said 599.25 acre tract the following |
|
courses and distances |
|
(1) With the westerly line of said Indian Creek Ranch Tract |
|
4, S06°08'47"W, 1374.75 feet to a 1/2-inch iron pipe found at the |
|
southwest corner of said tract 4, same being the northwest corner of |
|
Tract 2 of said Indian Creek Ranch and angle point in said easterly |
|
line; |
|
(2) With the westerly line of said Tract 2, S06°09'17"W, |
|
3133.57 feet to a 6-inch diameter fence post at the southwest corner |
|
of said Tract 2 and an angle point in said easterly line; |
|
(3) With the southerly line of said Tract 2, N89°16'58"E, |
|
1309.43 feet to a 1/2-inch iron pipe found at the southeast corner |
|
of said Tract 2, same being on the westerly line of Tract 1 of said |
|
Indian Creek Ranch and an angle point in said easterly line; |
|
(4) With the westerly line of said Tract 1, S00°29'12"E, |
|
431.49 feet to a 1/2-inch iron pipe found for an angle point in said |
|
line; |
|
(5) S29°40'46"W, 298.05 feet to a 1/2-inch iron pipe for |
|
angle point in said line; |
|
(6) S34°36'44"W, 477.34 feet to an iron rod found with cap |
|
stamped RPLS 4542 at the southwest corner of said Tract 1, same |
|
being on the northerly line of a tract conveyed to the Hays |
|
Consolidated Independent School District (deed recital unkown); |
|
(7) S87°30'03"W, 5.50 feet to an iron rod with cap stamped |
|
"McMillan" for the northwest corner of said School District Tract; |
|
(8) S11°36'28"W, 614.17 feet to an iron rod with cap stamped |
|
"McMillan" for an angle point in said line; |
|
(9) S10°09'51"W, 395.16 feet to an iron rod with cap stamped |
|
"McMillan" for an angle point in said line; |
|
(10) S10°11'50"W, 101.83 feet to an iron rod with cap stamped |
|
"McMillan" for an angle point in said line; |
|
(11) S10°09'55"W, 625.50 feet to an iron rod with cap stamped |
|
"McMillan" for an angle point in said line; |
|
(12) S12°41'22"W, 447.62 feet to a Nail in a 6-inch fence |
|
corner post for an angle point in said line; |
|
(13) S42°49'53"W, 93.56 feet to a 30-inch Live Oak tree for |
|
an angle point in said line; |
|
(14) S00°59'19"W, 13.67 feet to an iron rod with cap stamped |
|
RPLS 4542 at the southwest corner of said School District tract and |
|
the southeast corner of said 599.25 acre tract and being a point on |
|
the northerly line of said 73.693 acre Tract 2; |
|
THENCE, with the northerly line of said 73.693 acre tract, |
|
N88°39'49"E, passing a 1/2-inch iron rod at 243.73 feet and |
|
continuing for a total distance of 325.41 feet to a 1/2-inch iron |
|
rod on the southerly line of said School District tract and being |
|
the northwest corner of Lot 6, Century Acres, a subdivision of |
|
record in Volume 6, Page 53 of the Hays County Plat Records; |
|
THENCE, with said easterly line of said 73.693 acre tract and with |
|
the westerly line of said Lot 6 and 7 of said Century Acres and the |
|
easterly line of said Lot 2B and 2C Resubdivision of Lot 2B of the |
|
Resubdivision of Lot 2 Century Acres of record in Document |
|
No. 17040812 of the Hays County Official Public Records, |
|
S13°28'59"E, 1658.91 feet to a 1/2-inch iron pipe found for the |
|
southeast corner of said 73.693 acre tract, same being the |
|
southwest corner of said Lot 2B and the common northerly corner of |
|
Lots 8 and 9 of Meadow Woods Section Two, a subdivision of record in |
|
Volume 3, Page 188 of said Plat Records, same being the northeast |
|
corner of said 17.95 acre tract; |
|
THENCE, with the northerly line of said 17.95 acre tract, same being |
|
the southerly line of said 599.25 acre tract, S88°38'38"W, passing |
|
an iron rod with cap stamped "McMillan" at 103.02 feet and |
|
continuing for a total distance of 1505.09 feet to the POINT OF |
|
BEGINNING and containing, 422.996 acres of land, more or less. |
|
SECTION 4. The Anthem Municipal Utility District retains |
|
all the rights, powers, privileges, authority, duties, and |
|
functions that it had before the effective date of this Act. |
|
SECTION 5. (a) The legislature validates and confirms all |
|
governmental acts, elections, and proceedings of the Anthem |
|
Municipal Utility District that were taken before the effective |
|
date of this Act. |
|
(b) This section does not apply to any matter that on the |
|
effective date of this Act: |
|
(1) is involved in litigation if the litigation |
|
ultimately results in the matter being held invalid by a final court |
|
judgment; or |
|
(2) has been held invalid by a final court judgment. |
|
SECTION 6. (a) The legal notice of the intention to |
|
introduce this Act, setting forth the general substance of this |
|
Act, has been published as provided by law, and the notice and a |
|
copy of this Act have been furnished to all persons, agencies, |
|
officials, or entities to which they are required to be furnished |
|
under Section 59, Article XVI, Texas Constitution, and Chapter 313, |
|
Government Code. |
|
(b) The governor, one of the required recipients, has |
|
submitted the notice and Act to the Texas Commission on |
|
Environmental Quality. |
|
(c) The Texas Commission on Environmental Quality has filed |
|
its recommendations relating to this Act with the governor, the |
|
lieutenant governor, and the speaker of the house of |
|
representatives within the required time. |
|
(d) All requirements of the constitution and laws of this |
|
state and the rules and procedures of the legislature with respect |
|
to the notice, introduction, and passage of this Act are fulfilled |
|
and accomplished. |
|
SECTION 7. This Act takes effect immediately if it receives |
|
a vote of two-thirds of all the members elected to each house, as |
|
provided by Section 39, Article III, Texas Constitution. If this |
|
Act does not receive the vote necessary for immediate effect, this |
|
Act takes effect September 1, 2021. |