A BILL TO BE ENTITLED
|
|
AN ACT
|
|
relating to cost recovery for costs arising from the |
|
interconnection of certain electric generation facilities with the |
|
ERCOT transmission system. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Section 35.004, Utilities Code, is amended by |
|
amending Subsection (d) and adding Subsection (d-1) to read as |
|
follows: |
|
(d) The commission shall price wholesale transmission |
|
services within ERCOT based on the postage stamp method of pricing |
|
under which a transmission-owning utility's rate is based on the |
|
ERCOT utilities' combined annual costs of transmission, other than |
|
costs that exceed the allowance described in Subsection (d-1), |
|
divided by the total demand placed on the combined transmission |
|
systems of all such transmission-owning utilities within a power |
|
region. An electric utility subject to the freeze period imposed by |
|
Section 39.052 may treat transmission costs in excess of |
|
transmission revenues during the freeze period as an expense for |
|
purposes of determining annual costs in the annual report filed |
|
under Section 39.257. Notwithstanding Section 36.201, the |
|
commission may approve wholesale rates that may be periodically |
|
adjusted to ensure timely recovery of transmission investment. |
|
Notwithstanding Section 36.054(a), if the commission determines |
|
that conditions warrant the action, the commission may authorize |
|
the inclusion of construction work in progress in the rate base for |
|
transmission investment required by the commission under Section |
|
39.203(e). |
|
(d-1) The commission by rule shall establish a reasonable |
|
allowance for capital costs incurred to interconnect generation |
|
resources and electric energy storage resources described by |
|
Section 35.152(a) with the ERCOT transmission system, which must |
|
include the costs of the direct interconnection of the generator to |
|
the system and upgrades directly caused by the interconnection. |
|
Any costs that exceed the allowance must be borne directly by the |
|
generation resource or electric energy storage resource receiving |
|
interconnection service through the facilities. |
|
SECTION 2. This Act takes effect September 1, 2021. |