|
|
|
|
AN ACT
|
|
relating to withdrawals of water from the Edwards Aquifer to supply |
|
a military installation. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. The heading to Section 1.33, Chapter 626, Acts of |
|
the 73rd Legislature, Regular Session, 1993, is amended to read as |
|
follows: |
|
Sec. 1.33. WELL METERING AND PERMITTING EXEMPTIONS |
|
[EXEMPTION]. |
|
SECTION 2. Section 1.33, Chapter 626, Acts of the 73rd |
|
Legislature, Regular Session, 1993, is amended by adding |
|
Subsections (e), (f), and (g) to read as follows: |
|
(e) In addition to permitted withdrawals from the aquifer, a |
|
municipally owned utility owned by the City of San Antonio, without |
|
a permit, may withdraw groundwater from the aquifer if: |
|
(1) the utility uses the groundwater to supply a |
|
military installation with water for human consumption, |
|
irrigation, operations, mission support, or infrastructure |
|
maintenance; |
|
(2) the utility and the military installation enter |
|
into a contract requiring the installation to reduce its |
|
groundwater withdrawals from the aquifer by the same amount of |
|
withdrawn water the installation receives from the utility; and |
|
(3) the utility complies with rules adopted by the |
|
authority that allow the authority to monitor groundwater |
|
withdrawals from the aquifer by the utility and determine amounts |
|
of groundwater exempted from permitting in accordance with this |
|
subsection, including rules requiring the reporting of amounts |
|
supplied by the utility to the military installation and amounts by |
|
which the military installation reduces the installation's |
|
groundwater withdrawals from the aquifer. |
|
(f) Subsection (e) of this section does not alter the |
|
obligations of a military installation under a biological opinion |
|
issued by a federal agency. |
|
(g) The amount of water provided by a municipally owned |
|
utility to a military installation under Subsection (e) of this |
|
section may not exceed the maximum amount of water that the military |
|
installation is authorized to withdraw from the aquifer under a |
|
biological opinion issued by a federal agency. |
|
SECTION 3. This Act takes effect September 1, 2021. |
|
|
|
|
|
|
|
|
______________________________ |
______________________________ |
|
President of the Senate |
Speaker of the House |
|
|
I hereby certify that S.B. No. 1441 passed the Senate on |
|
April 19, 2021, by the following vote: Yeas 31, Nays 0; and that |
|
the Senate concurred in House amendment on May 27, 2021, by the |
|
following vote: Yeas 31, Nays 0. |
|
|
|
|
______________________________ |
|
Secretary of the Senate |
|
|
I hereby certify that S.B. No. 1441 passed the House, with |
|
amendment, on May 18, 2021, by the following vote: Yeas 136, |
|
Nays 1, two present not voting. |
|
|
|
|
______________________________ |
|
Chief Clerk of the House |
|
|
|
|
|
Approved: |
|
|
|
______________________________ |
|
Date |
|
|
|
|
|
______________________________ |
|
Governor |