A BILL TO BE ENTITLED
|
|
AN ACT
|
|
relating to a prohibition on the operation of concrete plants and |
|
crushing facilities at certain locations. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Section 382.05198(a), Health and Safety Code, is |
|
amended to read as follows: |
|
(a) The commission shall issue a standard permit for a |
|
permanent concrete plant that performs wet batching, dry batching, |
|
or central mixing and that meets the following requirements: |
|
(1) production records must be maintained on site |
|
while the plant is in operation until the second anniversary of the |
|
end of the period to which they relate; |
|
(2) each cement or fly ash storage silo and weigh |
|
hopper must be equipped with a fabric or cartridge filter or vented |
|
to a fabric or cartridge filter system; |
|
(3) each fabric or cartridge filter, fabric or |
|
cartridge filter system, and suction shroud must be maintained and |
|
operated properly with no tears or leaks; |
|
(4) excluding the suction shroud filter system, each |
|
filter system must be designed to meet a standard of at least 0.01 |
|
outlet grain loading as measured in grains per dry standard cubic |
|
foot; |
|
(5) each filter system and each mixer loading and |
|
batch truck loading emissions control device must meet a |
|
performance standard of no visible emissions exceeding 30 seconds |
|
in a five-minute period as determined using United States |
|
Environmental Protection Agency Test Method 22 as that method |
|
existed on September 1, 2003; |
|
(6) if a cement or fly ash silo is filled during |
|
nondaylight hours, the silo filter system exhaust must be |
|
sufficiently illuminated to enable a determination of compliance |
|
with the performance standard described by Subdivision (5); |
|
(7) the conveying system for the transfer of cement or |
|
fly ash to and from each storage silo must be totally enclosed, |
|
operate properly, and be maintained without any tears or leaks; |
|
(8) except during cement or fly ash tanker connection |
|
or disconnection, each conveying system for the transfer of cement |
|
or fly ash must meet the performance standard described by |
|
Subdivision (5); |
|
(9) a warning device must be installed on each bulk |
|
storage silo to alert the operator in sufficient time for the |
|
operator to stop loading operations before the silo is filled to a |
|
level that may adversely affect the pollution abatement equipment; |
|
(10) if filling a silo results in failure of the |
|
pollution abatement system or failure to meet the performance |
|
standard described by Subdivision (5), the failure must be |
|
documented and reported to the commission; |
|
(11) each road, parking lot, or other area at the plant |
|
site that is used by vehicles must be paved with a cohesive hard |
|
surface that is properly maintained, cleaned, and watered so as to |
|
minimize dust emissions; |
|
(12) each stockpile must be sprinkled with water or |
|
dust-suppressant chemicals or covered so as to minimize dust |
|
emissions; |
|
(13) material used in the batch that is spilled must be |
|
immediately cleaned up and contained or dampened so as to minimize |
|
dust emissions; |
|
(14) production of concrete at the plant must not |
|
exceed 300 cubic yards per hour; |
|
(15) a suction shroud or other pickup device must be |
|
installed at the batch drop point or, in the case of a central mix |
|
plant, at the drum feed and vented to a fabric or cartridge filter |
|
system with a minimum capacity of 5,000 cubic feet per minute of |
|
air; |
|
(16) the bag filter and capture system must be |
|
properly designed to accommodate the increased flow from the |
|
suction shroud and achieve a control efficiency of at least 99.5 |
|
percent; |
|
(17) the suction shroud baghouse exhaust must be |
|
located more than 100 feet from any property line; |
|
(18) stationary equipment, stockpiles, and vehicles |
|
used at the plant, except for incidental traffic and vehicles as |
|
they enter and exit the site, must be located or operated more than |
|
100 feet from any property line; and |
|
(19) the central baghouse must be located at least 880 |
|
[440] yards from any building used as a single or multifamily |
|
residence, school, or place of worship at the time the application |
|
to use the permit is filed with the commission if the plant is |
|
located in an area that is not subject to municipal zoning |
|
regulation. |
|
SECTION 2. Section 382.058(c), Health and Safety Code, is |
|
amended to read as follows: |
|
(c) For purposes of this section, only those persons |
|
actually residing in a permanent residence within 880 [440] yards |
|
of the proposed plant may request a hearing under Section 382.056 as |
|
a person who may be affected. |
|
SECTION 3. Sections 382.065(a) and (b), Health and Safety |
|
Code, are amended to read as follows: |
|
(a) The commission by rule shall prohibit the operation of a |
|
concrete crushing facility within 880 [440] yards of a building in |
|
use as a single or multifamily residence, school, or place of |
|
worship at the time the application for a permit to operate the |
|
facility at a site near the residence, school, or place of worship |
|
is filed with the commission. The measurement of distance for |
|
purposes of this subsection shall be taken from the point on the |
|
concrete crushing facility that is nearest to the residence, |
|
school, or place of worship toward the point on the residence, |
|
school, or place of worship that is nearest the concrete crushing |
|
facility. |
|
(b) Subsection (a) does not apply to a concrete crushing |
|
facility: |
|
(1) at a location for which commission authorization |
|
for the operation of a concrete crushing facility was in effect on |
|
September 1, 2001; |
|
(2) at a location that satisfies the distance |
|
requirements of Subsection (a) at the time the application for the |
|
initial authorization for the operation of that facility at that |
|
location is filed with the commission, provided that the |
|
authorization is granted and maintained, regardless of whether a |
|
single or multifamily residence, school, or place of worship is |
|
subsequently built or put to use within 880 [440] yards of the |
|
facility; or |
|
(3) that: |
|
(A) uses a concrete crusher: |
|
(i) in the manufacture of products that |
|
contain recycled materials; and |
|
(ii) that is located in an enclosed |
|
building; and |
|
(B) is located: |
|
(i) within 25 miles of an international |
|
border; and |
|
(ii) in a municipality with a population of |
|
not less than 6,100 but not more than 20,000. |
|
SECTION 4. The changes in law made by this Act apply only to |
|
an application for a permit to operate a concrete plant or crushing |
|
facility that is filed on or after the effective date of this Act. |
|
An application for a permit filed before the effective date of this |
|
Act is governed by the law in effect on the date of filing, and that |
|
law is continued in effect for that purpose. |
|
SECTION 5. This Act takes effect immediately if it receives |
|
a vote of two-thirds of all the members elected to each house, as |
|
provided by Section 39, Article III, Texas Constitution. If this |
|
Act does not receive the vote necessary for immediate effect, this |
|
Act takes effect September 1, 2023. |