A BILL TO BE ENTITLED
|
|
AN ACT
|
|
relating to information required to be provided to the public about |
|
planned excavations. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Section 251.151, Utilities Code, is amended by |
|
amending Subsection (a) and adding Subsections (d) and (e) to read |
|
as follows: |
|
(a) Except as provided by Sections 251.155 and 251.156, a |
|
person who intends to excavate shall, [notify a notification |
|
center] not earlier than the 14th day before the date the excavation |
|
is to begin or later than the 48th hour before the time the |
|
excavation is to begin, excluding Saturdays, Sundays, and legal |
|
holidays: |
|
(1) notify a notification center; and |
|
(2) place at least one temporary sign at or near the |
|
excavation site that displays the information required to be |
|
included in the notice under Section 251.152. |
|
(d) An excavator may place a sign described by Subsection |
|
(a) only: |
|
(1) on property the owner of which has consented to the |
|
placement; |
|
(2) on a public highway in a location that does not |
|
obstruct traffic; or |
|
(3) on a street lamp or utility sign, pole, or fixture. |
|
(e) An excavator may not remove a sign described by |
|
Subsection (a) until the excavation is complete. |
|
SECTION 2. Section 251.152, Utilities Code, is amended to |
|
read as follows: |
|
Sec. 251.152. INFORMATION INCLUDED IN NOTICE. The |
|
excavator shall include in the notice required under Section |
|
251.151: |
|
(1) the name of the person serving the notice; |
|
(2) the location of the proposed area of excavation, |
|
including: |
|
(A) the street address, if available, and the |
|
location of the excavation at the street address; or |
|
(B) if there is no street address, an accurate |
|
description of the excavation area using any available designations |
|
such as the closest street, road, or intersection; |
|
(3) the name, address, and telephone number of the |
|
excavator or the excavator's company; |
|
(4) the excavator's field telephone number, if one is |
|
available; |
|
(5) a telephone facsimile number, e-mail address, or |
|
another electronic number or address approved by the board to which |
|
an operator may send the notification required by Section |
|
251.157(d); |
|
(6) a telephone number or e-mail address a person can |
|
use to submit questions or complaints concerning the excavation; |
|
(7) the starting date and time and the anticipated |
|
completion date of excavation; and |
|
(8) [(7)] a statement as to whether explosives will be |
|
used. |
|
SECTION 3. Section 251.153, Utilities Code, is amended by |
|
adding Subsections (d) and (e) to read as follows: |
|
(d) Not later than 48 hours after the time a notification |
|
center receives a notice of intent to excavate from an excavator or |
|
from a different notification center, excluding Saturdays, |
|
Sundays, and legal holidays, the notification center shall provide |
|
to each owner of property in the vicinity of the proposed excavation |
|
operation the information provided to the notification center by |
|
the excavator under Section 251.152. |
|
(e) This subsection applies only to an excavation site in a |
|
county with a population of less than 100,000. Not later than 48 |
|
hours after the time a notification center receives a notice of |
|
intent to excavate from an excavator or from a different |
|
notification center, excluding Saturdays, Sundays, and legal |
|
holidays, the notification center shall provide to the county judge |
|
of the county in which the excavation site is located the |
|
information provided to the notification center by the excavator |
|
under Section 251.152. |
|
SECTION 4. This Act takes effect September 1, 2023. |