|
|
|
A BILL TO BE ENTITLED
|
|
AN ACT
|
|
relating to the construction of a meteorological tower near a |
|
federally owned or operated radar installation or military |
|
installation; providing an administrative penalty. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Title 6, Utilities Code, is amended by adding |
|
Chapter 303 to read as follows: |
|
CHAPTER 303. METEOROLOGICAL TOWERS |
|
Sec. 303.0001. DEFINITION. In this chapter, "commission" |
|
means the Public Utility Commission of Texas. |
|
Sec. 303.0002. NOTIFICATION REQUIRED FOR CERTAIN |
|
METEOROLOGICAL TOWERS. (a) This section applies only to a |
|
meteorological tower that: |
|
(1) is located: |
|
(A) on dry land in this state; and |
|
(B) within 50 nautical miles of the boundaries of |
|
a federally owned or operated radar installation or military |
|
installation in this state; |
|
(2) extends 200 feet or higher above ground level; and |
|
(3) is constructed for the purpose of conducting a |
|
wind study to determine if an area is suitable for wind-powered |
|
electric generation. |
|
(b) A person constructing a meteorological tower described |
|
by Subsection (a) shall provide written notice to the commission of |
|
the construction not later than the date that construction begins |
|
on the tower. |
|
(c) The notice required under Subsection (b) must include: |
|
(1) the name of the person constructing the |
|
meteorological tower; |
|
(2) the location of the tower; and |
|
(3) the name and location of each federally owned or |
|
operated radar installation or military installation in this state |
|
whose boundaries are within 50 nautical miles of the tower. |
|
(d) Not later than 30 days after the date the commission |
|
receives notice of the construction of a meteorological tower under |
|
Subsection (b), the commission shall provide a copy of the notice |
|
to: |
|
(1) a federally owned or operated radar installation |
|
or military installation in this state whose boundaries are within |
|
50 nautical miles of the tower; |
|
(2) the county judge of each county in this state that |
|
contains a radar or military installation described by Subdivision |
|
(1); and |
|
(3) the county judge of each county in this state that |
|
borders a county described by Subdivision (2). |
|
(e) The commission and attorney general may enforce the |
|
provisions of this section and rules adopted under this section in |
|
the manner authorized for the judicial or administrative |
|
enforcement of a provision of Title 2 by Subchapter B, Chapter 15, |
|
including by imposing administrative penalties. |
|
SECTION 2. This Act applies only to a person who begins |
|
construction of a meteorological tower on or after the effective |
|
date of this Act. A person who begins construction of a |
|
meteorological tower before the effective date of this Act is |
|
governed by the law in effect on the date construction began, and |
|
that law is continued in effect for that purpose. |
|
SECTION 3. This Act takes effect September 1, 2023. |