|
|
|
A BILL TO BE ENTITLED
|
|
AN ACT
|
|
relating to the interconnection of the ERCOT power grid to grids |
|
outside the ERCOT power region. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Subtitle B, Title 2, Utilities Code, is amended |
|
by adding Chapter 39A to read as follows: |
|
CHAPTER 39A. INTERCONNECTION OF FACILITIES IN ERCOT TO GRIDS |
|
OUTSIDE ERCOT POWER REGION |
|
Sec. 39A.0101. UTILITY AND COOPERATIVE AUTHORITY. |
|
Notwithstanding any other law, a transmission and distribution |
|
utility, municipally owned utility, or electric cooperative that |
|
transmits or distributes power purchased at wholesale in the ERCOT |
|
power region may construct, own, and operate facilities as |
|
necessary to: |
|
(1) access transmission service from outside of the |
|
ERCOT power region; and |
|
(2) purchase power at wholesale from outside of the |
|
ERCOT power region. |
|
Sec. 39A.0102. COMMISSION AUTHORITY. (a) The commission |
|
may request any federal approval necessary for the interconnection |
|
of a facility described by Section 39A.0101. |
|
(b) Unless otherwise provided by federal law, the |
|
commission shall require the independent organization certified |
|
for the ERCOT power region under Section 39.151 to approve the |
|
interconnection of a facility described by Section 39A.0101 unless |
|
the commission or the independent organization determines that the |
|
interconnection poses a significant and imminent risk to public |
|
health and safety. |
|
(c) The commission may provide technical and administrative |
|
assistance to a transmission and distribution utility, municipally |
|
owned utility, or electric cooperative seeking to construct, own, |
|
or operate a facility described by Section 39A.0101. |
|
Sec. 39A.0103. SYNCHRONOUS AND NON-SYNCHRONOUS |
|
INTERCONNECTIONS. (a) This chapter applies to synchronous and |
|
non-synchronous interconnections. |
|
(b) Unless otherwise provided by federal law, the |
|
commission shall approve an application for a certificate of |
|
convenience and necessity submitted under Section 39A.0104 by a |
|
transmission and distribution utility, municipally owned utility, |
|
or electric cooperative for a facility that would synchronously |
|
interconnect to a facility outside the ERCOT power region if the |
|
application complies with all applicable provisions of Chapter 37 |
|
and this chapter. |
|
(c) Not later than September 1, 2025, the commission shall |
|
identify transmission facilities in ERCOT that may be synchronously |
|
interconnected with transmission facilities outside of ERCOT for |
|
the purpose of allowing federal regulation of transmission service |
|
and wholesale power sales in ERCOT. Notwithstanding any other law, |
|
the commission shall require a transmission and distribution |
|
utility, municipally owned utility, or electric cooperative that |
|
owns a transmission facility identified by the commission to make |
|
requests, obtain approvals, enter into contracts, and construct |
|
facilities as necessary to synchronously interconnect the facility |
|
with a transmission facility outside of ERCOT. This subsection |
|
expires August 31, 2029. |
|
SECTION 2. Sections 37.051(c-1), (c-2), and (c-3), |
|
Utilities Code, are redesignated as Section 39A.0104, Utilities |
|
Code, and amended to read as follows: |
|
Sec. 39A.0104. CERTIFICATES OF CONVENIENCE AND NECESSITY. |
|
(a) A transmission and distribution utility, [(c-1) |
|
Notwithstanding any other provision of this title except Section |
|
11.009, and except as provided by Subsection (c-2), a person, |
|
including an electric utility or] municipally owned utility, or |
|
electric cooperative may not interconnect a facility described by |
|
Section 39A.0101 [to the ERCOT transmission grid that enables |
|
additional power to be imported into or exported out of the ERCOT |
|
power grid] unless the utility or cooperative [person] obtains a |
|
certificate from the commission in the manner provided by Chapter |
|
37 and this chapter stating that the interconnection does not pose a |
|
significant and imminent risk to public health and safety [public |
|
convenience and necessity requires or will require the |
|
interconnection]. |
|
(b) In the case of a conflict between Chapter 37 and this |
|
chapter, this chapter prevails. |
|
(c) Sections 37.056(c)(1) and (2) and (d) do not apply to an |
|
application for a certificate described by Subsection (a). |
|
(d) Unless otherwise provided by federal law, the |
|
commission shall approve an application for a certificate described |
|
by Subsection (a) unless the commission determines that granting |
|
the application poses a significant and imminent risk to public |
|
health and safety. |
|
(e) The transmission and distribution utility, municipally |
|
owned utility, or electric cooperative [person] must apply to the |
|
commission for a [the] certificate described by Subsection (a) not |
|
later than the 180th day before the date the utility or cooperative |
|
[person] seeks any order from the Federal Energy Regulatory |
|
Commission related to the interconnection. |
|
(f) [The commission shall apply Section 37.056 in |
|
considering an application under this subsection. In addition, the |
|
commission must determine that the application is consistent with |
|
the public interest before granting the certificate. The commission |
|
may adopt rules necessary to implement this subsection. This |
|
subsection does not apply to a facility that is in service on |
|
December 31, 2014. |
|
[(c-2)] The commission, not later than the 185th day after |
|
the date the application is filed, shall approve an application |
|
[filed under Subsection (c-1)] for a facility that is to be |
|
constructed under an interconnection agreement appended to an offer |
|
of settlement approved in a final order of the Federal Energy |
|
Regulatory Commission that was issued in Docket No. TX11-01-001 on |
|
or before December 31, 2014, directing physical connection between |
|
the ERCOT and SERC regions under Sections 210, 211, and 212 of the |
|
Federal Power Act (16 U.S.C. Sections 824i, 824j, and 824k). In |
|
approving the application, the commission may prescribe reasonable |
|
conditions to protect the public interest that are consistent with |
|
the final order of the Federal Energy Regulatory Commission. |
|
(g) [(c-3)] Nothing in this section [Subsection (c-1) or |
|
(c-2)] is intended to restrict the authority of the commission or |
|
the independent organization certified under Section 39.151 for the |
|
ERCOT power region to adopt rules or protocols of general |
|
applicability. |
|
SECTION 3. This Act takes effect September 1, 2023. |