|
|
A BILL TO BE ENTITLED
|
|
AN ACT
|
|
relating to the regulation by the Railroad Commission of Texas of |
|
closed-loop geothermal injection wells. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Subchapter C, Chapter 27, Water Code, is amended |
|
by adding Section 27.037 to read as follows: |
|
Sec. 27.037. JURISDICTION OVER CLOSED-LOOP GEOTHERMAL |
|
INJECTION WELLS. (a) In this section, "closed-loop geothermal |
|
injection well" means a closed system geothermal well used to |
|
circulate water, other fluids, or gases through the earth as a heat |
|
source or heat sink to generate power or heat or cool a structure. |
|
(b) The railroad commission has jurisdiction over |
|
closed-loop geothermal injection wells and may issue permits for |
|
closed-loop geothermal injection wells, including individual |
|
permits, general permits, or permits by rule. |
|
(c) A person may not begin drilling a closed-loop geothermal |
|
injection well unless that person holds a valid permit issued by the |
|
railroad commission under this section. |
|
(d) For purposes of railroad commission regulation, a |
|
closed-loop geothermal injection well is designated as a Class V |
|
well under the underground injection control program administered |
|
by the railroad commission. |
|
(e) The railroad commission shall adopt rules as necessary |
|
to administer this section and regulate closed-loop geothermal |
|
injection wells. |
|
SECTION 2. (a) In this section: |
|
(1) "Closed-loop geothermal injection well" has the |
|
meaning assigned by Section 27.037, Water Code, as added by this |
|
Act. |
|
(2) "Commission" means the Texas Commission on |
|
Environmental Quality. |
|
(3) "Railroad commission" means the Railroad |
|
Commission of Texas. |
|
(b) On the effective date of this Act: |
|
(1) all functions and activities performed by the |
|
commission that relate to the regulation of closed-loop geothermal |
|
injection wells under Chapter 27, Water Code, are transferred to |
|
the railroad commission; |
|
(2) a rule, standard, or form adopted by the |
|
commission that is related to the regulation of closed-loop |
|
geothermal injection wells under Chapter 27, Water Code, is a rule, |
|
standard, or form of the railroad commission and remains in effect |
|
until altered by the railroad commission; |
|
(3) a proceeding involving the commission that is |
|
related to the regulation of closed-loop geothermal injection wells |
|
under Chapter 27, Water Code, is transferred without change in |
|
status to the railroad commission, and the railroad commission |
|
assumes, without change in status, the position of the commission |
|
in any proceeding relating to the regulation of closed-loop |
|
geothermal injection wells to which the commission is a party; |
|
(4) all money, contracts, leases, rights, and |
|
obligations of the commission related to closed-loop geothermal |
|
injection wells under Chapter 27, Water Code, are transferred to |
|
the railroad commission; |
|
(5) all property, including records, in the custody of |
|
the commission related to the regulation of closed-loop geothermal |
|
injection wells under Chapter 27, Water Code, is transferred to the |
|
railroad commission; and |
|
(6) all money appropriated to the commission for |
|
purposes related to the regulation of closed-loop geothermal |
|
injection wells under Chapter 27, Water Code, is transferred to the |
|
railroad commission. |
|
(c) Section 27.037, Water Code, as added by this Act, does |
|
not affect the validity of a permit for a closed-loop geothermal |
|
injection well issued before the effective date of this Act. |
|
(d) Not later than the 90th day after the effective date of |
|
this Act: |
|
(1) the railroad commission shall issue a substitute |
|
permit under the name and authority of the railroad commission to |
|
each person who on the effective date of this Act holds a valid |
|
permit issued by the commission for a closed-loop geothermal |
|
injection well; and |
|
(2) the commission shall transmit to the railroad |
|
commission all pending applications for closed-loop geothermal |
|
injection wells submitted to the commission before the effective |
|
date of this Act. |
|
SECTION 3. This Act takes effect September 1, 2023. |