A BILL TO BE ENTITLED
|
|
AN ACT
|
|
relating to the cost of interconnecting certain electric generation |
|
and energy storage facilities with the ERCOT transmission system. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Section 35.004, Utilities Code, is amended by |
|
amending Subsection (d) and adding Subsections (d-1) and (d-2) to |
|
read as follows: |
|
(d) The commission shall price wholesale transmission |
|
services within ERCOT based on the postage stamp method of pricing |
|
under which a transmission-owning utility's rate is based on the |
|
ERCOT utilities' combined annual costs of transmission, other than |
|
costs described by Subsection (d-2), divided by the total demand |
|
placed on the combined transmission systems of all such |
|
transmission-owning utilities within a power region. An electric |
|
utility subject to the freeze period imposed by Section 39.052 may |
|
treat transmission costs in excess of transmission revenues during |
|
the freeze period as an expense for purposes of determining annual |
|
costs in the annual report filed under Section 39.257. |
|
Notwithstanding Section 36.201, the commission may approve |
|
wholesale rates that may be periodically adjusted to ensure timely |
|
recovery of transmission investment. Notwithstanding Section |
|
36.054(a), if the commission determines that conditions warrant the |
|
action, the commission may authorize the inclusion of construction |
|
work in progress in the rate base for transmission investment |
|
required by the commission under Section 39.203(e). |
|
(d-1) The commission by rule shall establish an allowance to |
|
be applied on a per megawatt basis for capital costs incurred to |
|
interconnect generation resources and electric energy storage |
|
resources described by Section 35.152(a) with the ERCOT |
|
transmission system, including costs of utility interconnection |
|
facilities and all necessary system upgrades. The allowance must: |
|
(1) take into account average historical |
|
interconnection costs and system upgrade costs, other than |
|
transmission costs associated with Section 39.904(g); and |
|
(2) be designed to lower costs to consumers and |
|
encourage owners of generation resources and electric energy |
|
storage resources to locate the resources closer to load. |
|
(d-2) Capital costs in excess of the allowance provided by |
|
Subsection (d-1) incurred to interconnect generation resources and |
|
electric energy storage resources described by Section 35.152(a) |
|
with the ERCOT transmission system, including costs of utility |
|
interconnection facilities and all necessary system upgrades, must |
|
be directly assigned to the generation resource or electric energy |
|
storage resource receiving interconnection service through the |
|
facilities. |
|
SECTION 2. This Act takes effect September 1, 2023. |