A BILL TO BE ENTITLED
|
|
AN ACT
|
|
relating to the legislature's goals for renewable electric |
|
generating capacity. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Section 36.053(d), Utilities Code, is amended to |
|
read as follows: |
|
(d) If the commission issues a certificate of convenience |
|
and necessity or if the commission, acting under the authority |
|
formerly provided by Section 39.203(e), ordered [orders] an |
|
electric utility or a transmission and distribution utility to |
|
construct or enlarge transmission or transmission-related |
|
facilities to facilitate meeting the goal for generating capacity |
|
from renewable energy technologies under former Section 39.904(a), |
|
the commission shall find that the facilities are used and useful to |
|
the utility in providing service for purposes of this section and |
|
are prudent and includable in the rate base, regardless of the |
|
extent of the utility's actual use of the facilities. |
|
SECTION 2. Section 37.0541, Utilities Code, is amended to |
|
read as follows: |
|
Sec. 37.0541. CONSOLIDATION OF CERTAIN PROCEEDINGS. The |
|
commission shall consolidate the proceeding on an application to |
|
obtain or amend a certificate of convenience and necessity for the |
|
construction of a transmission line with the proceeding on another |
|
application to obtain or amend a certificate of convenience and |
|
necessity for the construction of a transmission line if it is |
|
apparent from the applications or a motion to intervene in either |
|
proceeding that the transmission lines that are the subject of the |
|
separate proceedings share a common point of interconnection. |
|
[This section does not apply to a proceeding on an application for a |
|
certificate of convenience and necessity for a transmission line to |
|
serve a competitive renewable energy zone as part of a plan |
|
developed by the commission under Section 39.904(g)(2).] |
|
SECTION 3. Sections 37.056(c) and (d), Utilities Code, are |
|
amended to read as follows: |
|
(c) The commission shall grant each certificate on a |
|
nondiscriminatory basis after considering: |
|
(1) the adequacy of existing service; |
|
(2) the need for additional service; |
|
(3) the effect of granting the certificate on the |
|
recipient of the certificate and any electric utility serving the |
|
proximate area; and |
|
(4) other factors, such as: |
|
(A) community values; |
|
(B) recreational and park areas; |
|
(C) historical and aesthetic values; |
|
(D) environmental integrity; and |
|
(E) the probable improvement of service or |
|
lowering of cost to consumers in the area if the certificate is |
|
granted, including any potential economic or reliability benefits |
|
associated with dual fuel and fuel storage capabilities in areas |
|
outside the ERCOT power region[; and |
|
[(F) to the extent applicable, the effect of |
|
granting the certificate on the ability of this state to meet the |
|
goal established by Section 39.904(a) of this title]. |
|
(d) The commission by rule shall establish criteria, in |
|
addition to the criteria described by Subsection (c), for granting |
|
a certificate for a transmission project that serves the ERCOT |
|
power region and that is not necessary to meet state or federal |
|
reliability standards[, and that is not included in a plan |
|
developed under Section 39.904(g)]. The criteria must include a |
|
comparison of the estimated cost of the transmission project for |
|
consumers and the estimated congestion cost savings for consumers |
|
that may result from the transmission project, considering both |
|
current and future expected congestion levels and the transmission |
|
project's ability to reduce those congestion levels. The |
|
commission shall include with its decision on an application for a |
|
certificate to which this subsection applies findings on the |
|
criteria. |
|
SECTION 4. Section 39.002, Utilities Code, as amended by |
|
Chapters 908 (H.B. 4492) and 950 (S.B. 1580), Acts of the 87th |
|
Legislature, Regular Session, 2021, is reenacted and amended to |
|
read as follows: |
|
Sec. 39.002. APPLICABILITY. This chapter, other than |
|
Sections 39.151, 39.1516, 39.155, 39.157(e), 39.159, 39.160, |
|
39.203, [39.904,] 39.9051, 39.9052, and 39.914(e), and Subchapters |
|
M and N, does not apply to a municipally owned utility or an |
|
electric cooperative. Sections 39.157(e) and[,] 39.203[, and |
|
39.904, however,] apply only to a municipally owned utility or an |
|
electric cooperative that is offering customer choice. If there is |
|
a conflict between the specific provisions of this chapter and any |
|
other provisions of this title, except for Chapters 40 and 41, the |
|
provisions of this chapter control. |
|
SECTION 5. Section 39.203(e), Utilities Code, is amended to |
|
read as follows: |
|
(e) The commission may require an electric utility or a |
|
transmission and distribution utility to construct or enlarge |
|
facilities to ensure safe and reliable service for the state's |
|
electric markets and to reduce transmission constraints within |
|
ERCOT in a cost-effective manner where the constraints are such |
|
that they are not being resolved through Chapter 37 or the ERCOT |
|
transmission planning process. [The commission shall require an |
|
electric utility or a transmission and distribution utility to |
|
construct or enlarge transmission or transmission-related |
|
facilities for the purpose of meeting the goal for generating |
|
capacity from renewable energy technologies under Section |
|
39.904(a).] In any proceeding brought under Chapter 37, an |
|
electric utility or transmission and distribution utility ordered |
|
to construct or enlarge facilities under this subchapter need not |
|
prove that the construction ordered is necessary for the service, |
|
accommodation, convenience, or safety of the public and need not |
|
address the factors listed in Sections 37.056(c)(1)-(3) and (4)(E). |
|
Notwithstanding any other law, including Section 37.057, in any |
|
proceeding brought under Chapter 37 by an electric utility or a |
|
transmission and distribution utility related to an application for |
|
a certificate of public convenience and necessity to construct or |
|
enlarge transmission or transmission-related facilities under this |
|
subsection, the commission shall issue a final order before the |
|
181st day after the date the application is filed with the |
|
commission. If the commission does not issue a final order before |
|
that date, the application is approved. |
|
SECTION 6. Section 39.402(a), Utilities Code, is amended to |
|
read as follows: |
|
(a) Until the date on which an electric utility subject to |
|
this subchapter is authorized by the commission to implement |
|
customer choice, the rates of the utility shall be regulated under |
|
traditional cost of service regulation and the utility is subject |
|
to all applicable regulatory authority prescribed by this subtitle |
|
and Subtitle A, including Chapters 14, 32, 33, 36, and 37. Until |
|
the date on which an electric utility subject to this subchapter |
|
implements customer choice, the provisions of this chapter, other |
|
than this subchapter, Sections 39.1516[, 39.904,] and 39.905, and |
|
the provisions relating to the duty to obtain a permit from the |
|
Texas Commission on Environmental Quality for an electric |
|
generating facility and to reduce emissions from an electric |
|
generating facility, shall not apply to that utility. That portion |
|
of any commission order entered before September 1, 2001, to comply |
|
with this subchapter shall be null and void. |
|
SECTION 7. Section 39.452(d), Utilities Code, is amended to |
|
read as follows: |
|
(d) Until the date on which an electric utility subject to |
|
this subchapter implements customer choice: |
|
(1) the provisions of this chapter do not apply to that |
|
electric utility, other than this subchapter, Sections 39.1516[, |
|
39.904,] and 39.905, the provisions relating to the duty to obtain a |
|
permit from the Texas Commission on Environmental Quality for an |
|
electric generating facility and to reduce emissions from an |
|
electric generating facility, and the provisions of Subchapter G |
|
that pertain to the recovery and securitization of hurricane |
|
reconstruction costs authorized by Sections 39.458-39.463; and |
|
(2) the electric utility is not subject to a rate |
|
freeze and, subject to the limitation provided by Subsection (b), |
|
may file for rate changes under Chapter 36 and for approval of one |
|
or more of the rate rider mechanisms authorized by Sections 39.454 |
|
and 39.455. |
|
SECTION 8. Section 39.502(b), Utilities Code, is amended to |
|
read as follows: |
|
(b) Until the date on which an electric utility subject to |
|
this subchapter implements customer choice, the provisions of this |
|
chapter, other than this subchapter and Sections 39.1516[, 39.904,] |
|
and 39.905, do not apply to that utility. |
|
SECTION 9. Section 39.552(b), Utilities Code, is amended to |
|
read as follows: |
|
(b) Until the date on which an electric utility subject to |
|
this subchapter implements customer choice, the provisions of this |
|
chapter, other than this subchapter and Sections 39.1516[, 39.904,] |
|
and 39.905, do not apply to that utility. |
|
SECTION 10. Subchapter Z, Chapter 39, Utilities Code, is |
|
amended by adding Sections 39.9111 and 39.9112 to read as follows: |
|
Sec. 39.9111. RULES RELATED TO RENEWABLE POWER FACILITIES. |
|
The commission may adopt rules requiring renewable power facilities |
|
to have reactive power control capabilities or any other feasible |
|
technology designed to reduce the facilities' effects on system |
|
reliability. |
|
Sec. 39.9112. REPORT ON TRANSMISSION AND GENERATION |
|
CAPACITY. The commission and the independent organization |
|
certified under Section 39.151 for the ERCOT power region shall |
|
study the need for increased transmission and generation capacity |
|
throughout this state and report to the legislature the results of |
|
the study and any recommendations for legislation. The report must |
|
be filed with the legislature not later than December 31 of each |
|
even-numbered year. |
|
SECTION 11. Section 39.916(a), Utilities Code, is amended |
|
by amending Subdivision (1) and adding Subdivision (4) to read as |
|
follows: |
|
(1) "Distributed renewable generation" means electric |
|
generation with a capacity of not more than 2,000 kilowatts |
|
provided by a renewable energy technology[, as defined by Section |
|
39.904,] that is installed on a retail electric customer's side of |
|
the meter. |
|
(4) "Renewable energy technology" means any |
|
technology that relies exclusively on an energy source that is |
|
naturally regenerated over a short time and is derived from the sun |
|
directly or indirectly or from moving water or other natural |
|
movements or mechanisms of the environment. The term includes a |
|
technology that relies on energy derived from the sun directly; on |
|
wind, geothermal, hydroelectric, wave, or tidal energy; or on |
|
biomass or biomass-based waste products, including landfill gas. |
|
The term does not include a technology that relies on an energy |
|
resource derived from a fossil fuel, a waste product from a fossil |
|
fuel, or a waste product from an inorganic source. |
|
SECTION 12. Section 40.001(a), Utilities Code, is amended |
|
to read as follows: |
|
(a) Notwithstanding any other provision of law, except |
|
Sections 39.155, 39.157(e), and 39.203, [and 39.904,] this chapter |
|
governs the transition to and the establishment of a fully |
|
competitive electric power industry for municipally owned |
|
utilities. With respect to the regulation of municipally owned |
|
utilities, this chapter controls over any other provision of this |
|
title, except for sections in which the term "municipally owned |
|
utility" is specifically used. |
|
SECTION 13. Section 40.004, Utilities Code, is amended to |
|
read as follows: |
|
Sec. 40.004. JURISDICTION OF COMMISSION. Except as |
|
specifically otherwise provided in this chapter, the commission has |
|
jurisdiction over municipally owned utilities only for the |
|
following purposes: |
|
(1) to regulate wholesale transmission rates and |
|
service, including terms of access, to the extent provided by |
|
Subchapter A, Chapter 35; |
|
(2) to regulate certification of retail service areas |
|
to the extent provided by Chapter 37; |
|
(3) to regulate rates on appeal under Subchapters D |
|
and E, Chapter 33, subject to Section 40.051(c); |
|
(4) to establish a code of conduct as provided by |
|
Section 39.157(e) applicable to anticompetitive activities and to |
|
affiliate activities limited to structurally unbundled affiliates |
|
of municipally owned utilities, subject to Section 40.054; |
|
(5) to establish terms and conditions for open access |
|
to transmission and distribution facilities for municipally owned |
|
utilities providing customer choice, as provided by Section 39.203; |
|
(6) to administer [the renewable energy credits |
|
program under Section 39.904(b) and] the natural gas energy credits |
|
program under Section 39.9044(b); |
|
(7) to require reports of municipally owned utility |
|
operations only to the extent necessary to: |
|
(A) enable the commission to determine the |
|
aggregate load and energy requirements of the state and the |
|
resources available to serve that load; or |
|
(B) enable the commission to determine |
|
information relating to market power as provided by Section 39.155; |
|
and |
|
(8) to evaluate and monitor the cybersecurity |
|
preparedness of a municipally owned utility described by Section |
|
39.1516(a)(3) or (4). |
|
SECTION 14. Section 41.001, Utilities Code, is amended to |
|
read as follows: |
|
Sec. 41.001. APPLICABLE LAW. Notwithstanding any other |
|
provision of law, except Sections 39.155, 39.157(e), and 39.203, |
|
[and 39.904,] this chapter governs the transition to and the |
|
establishment of a fully competitive electric power industry for |
|
electric cooperatives. Regarding the regulation of electric |
|
cooperatives, this chapter shall control over any other provision |
|
of this title, except for sections in which the term "electric |
|
cooperative" is specifically used. |
|
SECTION 15. Sections 39.904 and 39.916(g), Utilities Code, |
|
are repealed. |
|
SECTION 16. It is the intent of the 88th Legislature, |
|
Regular Session, 2023, that the amendments made by this Act be |
|
harmonized with another Act of the 88th Legislature, Regular |
|
Session, 2023, relating to nonsubstantive additions to and |
|
corrections in enacted codes. |
|
SECTION 17. This Act takes effect September 1, 2023. |