|
House Bill 2555 |
House Author: Metcalf et al. |
|
Effective: 6-13-23 |
Senate Sponsor: Schwertner et al. |
House Bill 2555 amends the Utilities Code to authorize an electric utility to file with the Public Utility Commission of Texas (PUC) a plan to enhance the resiliency of the utility's transmission and distribution system through at least one of a number of approved methods that covers a period of at least three years. The bill provides for a review by the PUC of associated resiliency‑related investments and, if the costs are determined to be reasonable, for possible recovery of those investments.