Amend CSHB 730 as follows: (1) On page 48, strike lines 15-20 and substitute the following: "(1) the reasonable cost of repairs necessary to cure any construction defect [including any reasonable and". (2) On page 49, strike line 4 and substitute the following: "any, after the construction defect is repaired if the construction defect is a [to the extent the reduction is due to] structural failure; and".