Amend HB 1723 on page 1 by striking lines 6 through 12 and
substituting the following:
Sec. 1954.260. DURATION OF ASBESTOS SURVEY. An asbestos
survey performed for a public building as required by this chapter
and any other law is valid if the survey was performed in compliance
with the laws in effect at the time the survey was completed and the
survey identifies any asbestos-containing building material, the
location of that material, and any other asbestos condition in the
building. Any renovation, construction, or other activity for
which an asbestos survey is required shall be conducted without the
requirement of obtaining a new asbestos survey.