Floor Packet Page No. 55 Amend CSHB 3 as follows: (1) On page 32, line 2, strike "and"; (2) On page 32, line 3, strike the period and substitute "; and"; (3) On page 32, between lines 3 and 4, insert: "(13) labor costs, costs of materials, and any other costs expended in the development, construction, operation, or maintenance of a pipeline to transfer water between basins"