The digital content on TLO has been updated to align with the accessibility standards required by WCAG 2.1.
Amend CSHB 1429 as follows:
(1) On page 1, strike lines 20 and 21 and substitute the
following:
SECTION 2. Section 7.052, Water Code, is amended by amending
Subsection (b) and adding Subsection (b-1) to read as follows:
(2) On page 2, line 2, strike "The" and substitute "Except as
provided by Subsection (b-1), the".
(3) On page 2, between lines 6 and 7, insert the following:
(b-1) If a penalty imposed under Subsection (b) in not paid
before the 91st day after the first day on which the violation
occurred, the person operating the concrete plant or rock crusher
is liable for a penalty of $10,000 for each additional day on which
the person operates a concrete plant or a rock crusher without a
permit.