System updates will be applied on February 19, 2026 at 6:00 PM. These updates will include changes to the user interface. Work is expected to take approximately 30 minutes to complete, during which the site will be unavailable.
Floor Packet Page No. 139
Amend CSSB 1 as follows:
In Article VII, under the appropriations to the Department of
Transportation (page VII-25) insert the following appropriately
numbered rider:
Water Impact Study. Any funds utilized for highway
transportation projects must include as a component of the
environmental study a water impact study that includes an analysis
of the altercations of the local drainage patterns and the impact to
the local water supply.