System updates will be applied on February 19, 2026 at 6:00 PM. These updates will include changes to the user interface. Work is expected to take approximately 30 minutes to complete, during which the site will be unavailable.
Amend Floor Amendment No. 39 as follows:
(1) On page 2, line 16, strike "four" and substitute "two."
(2) On page 3, line 5, strike "5" and substitute "8."
(3) On page 2, line 15 between "program" and "The" insert the
following:
"The commission shall ensure participants are from different areas
of the state."
(3) On page 2, line 16 insert the following sections:
"(d) The commission shall collect data on the pilot program
on but not limited to the following:
(1) the monetary amount of the average monthly
electricity bill offset by solar electric systems.
(2) customer satisfaction with solar electric systems;
(3) the amount of annual load offset by solar electric
systems;
(4) net metering in the subdivision and which net
metering regime would produce the best results for homes in the
subdivision; and
(5) emissions which would have been created if the
electricity the customers used had been generated by a coal-fired
power plant.
(e) The commission shall report to the legislature on the
data collected in Subsection (d) one year after the start of the
program."