This website will be unavailable from Thursday, May 30, 2024 at 6:00 p.m. through Monday, June 3, 2024 at 7:00 a.m. due to data center maintenance.



	
Amend CSSB 483 as follows:                                                   
	(1)  On page 2, line 33, between "to" and ", a" insert 
"ERCOT".       
	(2)  On page 2, line 33, between "to," and "a power region" 
insert "or 25 percent of the installed generation capacity in".
	(3)  On page 2, lines 40 through 42, strike ", reduced by the 
installed generation capacity of those facilities that are made 
subject to capacity auctions under Sections 39.153(a) and (d)".
	(4)  On page 2, line 65, between "(b)," and "and (g)" insert 
"(f),".         
	(5)  On page 3, line 5, between "to" and ", a" insert "ERCOT".          
	(6)  On page 3, line 5, between "to," and "a power region" 
insert "or 25 percent of the installed generation capacity in".
	(7)   On page 3, line 11, insert the following:                                
	(f)  The commission shall approve, modify, or reject a plan 
within 180 days after the date of a filing under Subsection (b).  
[The commission may not modify a plan to require divestiture by the 
electric utility or the power generation company.]
	(8)  On page 7, line 6, strike "and".                                          
	(9)  On page 7, line 7, between "Section 39.154," and 
"Utilities Code," insert "and Subsection (d), Section 39.156,".