System updates will be applied on February 19, 2026 at 6:00 PM. These updates will include changes to the user interface. Work is expected to take approximately 30 minutes to complete, during which the site will be unavailable.



	Amend SB 792 in SECTION 3.01 of the bill, by striking proposed 
Subsection (f), Section 223.210, Transportation Code (House 
Committee Printing, page 7, lines 4-7), and substituting:
	(f)  Subsection (b) does not apply to a comprehensive 
development agreement in connection with a project:
		(1)  on the ISTEA High Priority Corridor identified in 
Sections 1105(c)(18) and (20) of the Intermodal Surface 
Transportation Efficiency Act of 1991 (Pub. L. No. 102-240), as 
amended by Section 1211 of the Transportation Equity Act for the 
21st Century (Pub. L. No. 105-178, as amended by Title IX, Pub. L. 
No. 105-206), including land adjacent to the project needed to 
widen the project for a transportation use, if the project remains 
in a highway corridor designated by those laws; and
		(2)  located south of the San Antonio River.