System updates will be applied on February 19, 2026 at 6:00 PM. These updates will include changes to the user interface. Work is expected to take approximately 30 minutes to complete, during which the site will be unavailable.



	
Amend Floor Amendment No. 1 to CSSB 792 in SECTION 7.01 of the 
amendment, in proposed Section 228.0111, Transportation Code (page 
18, between lines 7 and 8), by inserting:
	(f-2) If the department and the local toll project entity are 
unable to mutually determine which entity will develop the market 
valuation of the toll project under Subsection (f), neither the 
department or the local toll project entity may develop, construct, 
or operate the project as a toll project.