System updates will be applied on February 19, 2026 at 6:00 PM. These updates will include changes to the user interface. Work is expected to take approximately 30 minutes to complete, during which the site will be unavailable.
Amend Floor Amendment No. 1 to CSSB 792 in SECTION 7.01 of the
amendment, in proposed Section 228.0111, Transportation Code (page
17, between lines 16 and 17), by inserting:
(e-1) If the local toll project entity and the department are
unable to mutually agree on the terms and conditions for the
development, construction, and operation of the toll project as
required by Subsection (e), neither the local toll project entity
or the department may develop the project as a toll project.