Amend the CSSB 1267 in SECTION 1 of the bill, added Section
223.210, Transportation Code (committee printing, page 1, between
lines 48 and 49), by inserting the following:
(C-2) Notwithstanding the TxDOT/NTTA Regional Protocol
entered into between the Texas Department of Transportation and the
North Texas Tollway Authority (the authority) and approved on
August 10, 2006, by the tollway authority and on August 24, 2006, by
the department Subsection (b) does not apply to a comprehensive
development agreement;
(1) entered into in connection with State Highway 121
if before the commission or the department enters into a contract
for the financing, construction, or operation of the project with a
private participant, an authority under Chapter 366, was granted
the ability to finance, construct, or operate as applicable, the
portion of the toll project located within the boundaries of the
authority, and the authority was granted a period of 60 days from
March 26, 2007 to submit a commitment to the metropolitan planning
organization which is determined to be equal to or greater than any
other commitment submitted prior to March 26, 2007; and
(a) If the financial value of the commitment is
determined to be equal to or greater value than any other commitment
submitted prior to March 26, 2007, then the commission shall allow
the authority to develop the project; or
(2) entered into in connection with State Highway 161 if
before the commission or the department enters into a contract with
a private participant for the financing, construction, or
operation, an authority under Chapter 366, was granted the ability
to finance, construct, or operate as applicable, the portion of the
toll project located within the boundaries of the authority, and
the authority was granted a period of 90 days to submit a commitment
to the metropolitan planning organization.
(a) If the authority makes a commitment to proceed
then TxDOT shall allow the authority to proceed and the authority
must enter into contracts to finance, construct, or operate the
project within 180 days.