System updates will be applied on February 19, 2026 at 6:00 PM. These updates will include changes to the user interface. Work is expected to take approximately 30 minutes to complete, during which the site will be unavailable.
Amend Floor Amendment No. 1 to CSSB 1688 to strike the
proposed Section 432.051(a)(2) and substitute the following:
(2) within the area between a line that is two miles to
the east of the center line of a toll project that passes through
the extraterritorial jurisdiction or corporate limits of the
principal municipality and, to the west, the principal
municipality's eastern full-purpose boundaries in a distance not to
exceed five miles; and