This website will be unavailable from Friday, April 26, 2024 at 6:00 p.m. through Monday, April 29, 2024 at 7:00 a.m. due to data center maintenance.

 
 
  By: Van de Putte  S.B. No. 1281
         (In the Senate - Filed March 6, 2007; March 19, 2007, read
  first time and referred to Committee on Natural Resources;
  April 30, 2007, reported adversely, with favorable Committee
  Substitute by the following vote:  Yeas 11, Nays 0; April 30, 2007,
  sent to printer.)
 
  COMMITTEE SUBSTITUTE FOR S.B. No. 1281 By:  Estes
 
 
A BILL TO BE ENTITLED
 
AN ACT
 
  relating to certain permit requirements concerning solid waste
  facilities, including recycling facilities, that are located on the
  recharge or transition zone of a sole source aquifer.
         BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
         SECTION 1.  Subchapter C, Chapter 361, Health and Safety
  Code, is amended by adding Section 361.125 to read as follows:
         Sec. 361.125.  PERMIT REQUIREMENTS FOR MUNICIPAL SOLID WASTE
  FACILITY ON RECHARGE OR TRANSITION ZONE OF SOLE SOURCE AQUIFER.  
  (a)  In this section:
               (1)  "Recharge zone" and "transition zone" have the
  meanings assigned by 30 T.A.C. Section 213.3.
               (2)  "Sole source aquifer" means an aquifer that is the
  sole or principal source of drinking water for an area designated
  under Section 1424(e), Safe Drinking Water Act of 1974 (42 U.S.C.
  Section 300h-3(e)).
         (b)  The commission by rule shall:
               (1)  impose heightened standards for the issuance of a
  permit for a municipal solid waste facility, including a recycling
  facility, under this chapter if the facility is located on the
  recharge zone or transition zone of a sole source aquifer;
               (2)  require a municipal solid waste facility,
  including a recycling facility, that is located on the recharge
  zone of a sole source aquifer to install groundwater protection
  features, such as liners and monitoring wells, specified by the
  commission; and
               (3)  require a recycling facility that is located on
  the recharge zone or transition zone of a sole source aquifer to
  establish fire lanes between piles of combustible materials.
         SECTION 2.  This Act takes effect September 1, 2007.
 
  * * * * *