The digital content on TLO has been updated to align with the accessibility standards required by WCAG 2.1.
Amend Floor Amendment No. 57 to CSHB 300 (page 20, prefiled
amendment packet) by Leibowitz as follows:
(1) On page 1, strike lines 16 through 18 and substitute the
following:
(2) [(3)] the project was designated as a toll project
in a plan or program of a metropolitan planning organization on or
before September 1, 2005 which included the planned future
extension of the Dallas North Tollway into Grayson County;
(2) On page 1, line 19, strike "[(4)]" and substitute "(3)
[(4)]".
(3) On page 1, line 23, strike "(3)" and substitute "(4)"
[(4)]"
(3) On page 1, line 28, strike "[(6)]" and substitute and
substitute "(5) [(6)]".