A BILL TO BE ENTITLED
|
|
AN ACT
|
|
relating to requiring certain service stations to be capable of |
|
operating with alternative electrical power and to have an |
|
alternative electrical generator. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Subtitle C, Title 5, Business & Commerce Code, is |
|
amended by adding Chapter 106 to read as follows: |
|
CHAPTER 106. ALTERNATIVE ELECTRICAL POWER REQUIREMENTS FOR CERTAIN |
|
SERVICE STATIONS |
|
Sec. 106.001. DEFINITIONS. In this chapter: |
|
(1) "Alternative electrical generator" means an |
|
electrical generator that provides electric power when electric |
|
power from a utility service is interrupted. |
|
(2) "Service station" has the meaning assigned by |
|
Section 105.001. |
|
Sec. 106.002. APPLICABILITY OF CHAPTER. (a) This chapter |
|
applies only to a self-service, full-service, or combination of |
|
self-service and full-service service station that is located |
|
within 100 miles of the Gulf of Mexico or of a bay or inlet of the |
|
gulf. |
|
(b) This chapter applies to a service station described by |
|
Subsection (a) regardless of whether the service station is located |
|
on the grounds of, or is owned by, another business entity that does |
|
not engage in the business of selling motor vehicle fuel to the |
|
public. |
|
(c) This chapter does not apply to: |
|
(1) an automobile dealer; |
|
(2) a person who operates a fleet of motor vehicles; or |
|
(3) a person who sells motor fuel exclusively to a |
|
fleet of motor vehicles. |
|
Sec. 106.003. ALTERNATIVE ELECTRICAL POWER CAPACITY FOR |
|
SERVICE STATIONS. (a) A service station shall be prewired with an |
|
appropriate transfer switch and be capable of operating all fuel |
|
pumps, dispensing equipment, life-safety systems, and |
|
payment-acceptance equipment using an alternative electrical |
|
generator. |
|
(b) Installation of appropriate wiring and transfer |
|
switches must be performed by an electrical contractor. |
|
(c) If a local government requires a certificate of |
|
occupancy for completion of construction of a service station, the |
|
local government may not issue a certificate of occupancy to the |
|
service station unless the local government determines that the |
|
service station has the equipment and operational capabilities |
|
required by Subsection (a). |
|
Sec. 106.004. ALTERNATIVE ELECTRICAL GENERATOR REQUIRED. A |
|
service station shall be equipped with at least one alternative |
|
electrical generator for use at the station. |
|
Sec. 106.005. REQUIRED DOCUMENTS FOR SERVICE STATIONS. (a) |
|
A service station must keep a copy of the documentation of the |
|
installation of appropriate wiring for the operation of an |
|
alternative electrical generator, including a transfer switch, |
|
on-site or at its corporate headquarters. |
|
(b) A service station must keep a written statement |
|
attesting to the periodic testing and ensured operational capacity |
|
of the equipment. |
|
(c) The documents required by this section must be made |
|
available, on request, to the governor's division of emergency |
|
management or the Department of Agriculture. |
|
SECTION 2. This Act takes effect June 1, 2010. |