A BILL TO BE ENTITLED
|
|
AN ACT
|
|
relating to regulation of electric generation capacity ownership in |
|
the electric power market. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Sections 39.152(a) and (d), Utilities Code, are |
|
amended to read as follows: |
|
(a) The commission shall certify a power region if: |
|
(1) a sufficient number of interconnected utilities in |
|
the power region fall under the operational control of an |
|
independent organization as described by Section 39.151; |
|
(2) the power region has a generally applicable tariff |
|
that guarantees open and nondiscriminatory access for all users to |
|
transmission and distribution facilities in the power region as |
|
provided by Section 39.203; and |
|
(3) no person owns, controls, or owns and controls in |
|
any combination more than 20 percent of the installed generation |
|
capacity located in or capable of delivering electricity to a power |
|
region, as determined according to Section 39.154. |
|
(d) For a power region outside of ERCOT, a power generation |
|
company that is affiliated with an electric utility may elect to |
|
demonstrate that it meets the requirements of Subsection (a)(3) by |
|
showing that it does not own, control, or own and control in any |
|
combination more than 20 percent of the installed capacity in a |
|
geographic market that includes the power region, using the |
|
guidelines, standards, and methods adopted by the Federal Energy |
|
Regulatory Commission. |
|
SECTION 2. Section 39.153, Utilities Code, is amended by |
|
adding Subsection (a-1) and amending Subsections (e) and (f) to |
|
read as follows: |
|
(a-1) Not later than September 30, 2010, each electric |
|
utility subject to this section shall sell at auction or otherwise |
|
divest any additional entitlements to the utility's jurisdictional |
|
installed generation capacity necessary to ensure that the electric |
|
utility does not control more than 20 percent of the installed |
|
generation capacity: |
|
(1) in ERCOT; |
|
(2) in an ERCOT zonal boundary; or |
|
(3) in a functional market recognized by the |
|
commission. |
|
(e) The commission shall adopt rules by December 31, 2000, |
|
that define the initial scope of the capacity entitlements to be |
|
auctioned and not later than December 31, 2009, shall adopt |
|
additional rules that define the scope of the auctions necessary to |
|
comply with Subsection (a-1). Entitlements may be auctioned in |
|
blocks of less than 15 percent. The rules shall state the minimum |
|
amount of capacity that can be sold at auction as an entitlement. |
|
At a minimum, the rules shall provide that the entitlements: |
|
(1) may be sold and purchased in periods of not less |
|
than one month nor more than four years; |
|
(2) may be resold to any lawful purchaser, except for a |
|
retail electric provider affiliated with the electric utility that |
|
originally auctioned the entitlement; |
|
(3) include no possessory interest in the unit from |
|
which the power is produced; |
|
(4) include no obligations of a possessory owner of an |
|
interest in the unit from which the power is produced; and |
|
(5) give the purchaser the right to designate the |
|
dispatch of the entitlement, subject to planned outages, outages |
|
beyond the control of the utility operating the unit, and other |
|
considerations subject to the oversight of the applicable |
|
independent organization. |
|
(f) The commission shall adopt rules by December 31, 2000, |
|
that prescribe the procedure for the auction of the entitlements as |
|
required by Subsection (a). If necessary, the commission may adopt |
|
additional rules that prescribe the procedure for the auction of |
|
the entitlements as required by Subsection (a-1). The rules shall |
|
include: |
|
(1) a process for conducting the auction or auctions, |
|
including who shall conduct it, how often it shall be conducted, and |
|
how winning bidders shall be determined; |
|
(2) a process for the electric utility to designate |
|
which generation units or combination of units are offered for |
|
auction; |
|
(3) a provision for the utility to establish an |
|
opening bid price based on the electric utility's expected cost, |
|
with the commission prescribing the means for determining the |
|
opening bid price, which may not include return on equity; and |
|
(4) a provision that allows a bidder to specify the |
|
magnitude and term of the entitlement, subject to the conditions |
|
established in Subsection (e). |
|
SECTION 3. Sections 39.154(a) and (c), Utilities Code, are |
|
amended to read as follows: |
|
(a) Beginning on the date of introduction of customer |
|
choice, a power generation company may not own, [and] control, or |
|
own and control in any combination more than 20 percent of the |
|
installed generation capacity located in, or capable of delivering |
|
electricity to, a power region, zone, or functional market |
|
recognized by the commission in the power region. |
|
(c) In determining the percentage shares of installed |
|
generation capacity under this section, the commission shall |
|
combine capacity owned or [and] controlled by a power generation |
|
company and any entity that is affiliated with that power |
|
generation company within the power region, zone, or functional |
|
market recognized by the commission in the power region, reduced by |
|
the installed generation capacity of those facilities that are made |
|
subject to capacity auctions under Sections 39.153(a) and (d). |
|
SECTION 4. Section 39.155(a), Utilities Code, is amended to |
|
read as follows: |
|
(a) Each person, municipally owned utility, electric |
|
cooperative, and river authority that owns or controls generation |
|
facilities and offers electricity for sale in this state shall |
|
report to the commission its installed generation capacity, the |
|
total amount of capacity available for sale to others, the total |
|
amount of capacity under contract to others, the total amount of |
|
capacity dedicated to its own use, its annual wholesale power sales |
|
in the state, its annual retail power sales in the state, and any |
|
other information necessary for the commission to assess market |
|
power or the development of a competitive retail market in the |
|
state. The commission shall by rule prescribe the nature and detail |
|
of the reporting requirements and shall administer those reporting |
|
requirements in a manner that ensures the confidentiality of |
|
competitively sensitive information. |
|
SECTION 5. Sections 39.156(a), (b), and (g), Utilities |
|
Code, are amended to read as follows: |
|
(a) In this section, "market power mitigation plan" or |
|
"plan" means a written proposal by an electric utility or a power |
|
generation company for reducing its ownership or [and] control of |
|
installed generation capacity as required by Section 39.154. |
|
(b) An electric utility or power generation company owning, |
|
controlling, or owning and controlling in any combination more than |
|
20 percent of the generation capacity located in, or capable of |
|
delivering electricity to, a power region, zone, or functional |
|
market recognized by the commission in the power region shall file a |
|
market power mitigation plan with the commission not later than the |
|
90th day after the date the electric utility's or power generation |
|
company's generation capacity exceeds the 20 percent limitation |
|
under this subsection [December 1, 2000]. |
|
(g) In reaching its determination under Subsection (f), the |
|
commission shall consider: |
|
(1) the degree to which the electric utility's or power |
|
generation company's stranded costs, if any, are minimized; |
|
(2) whether on disposition of the generation assets |
|
the reasonable value is likely to be received; |
|
(3) the effect of the plan on the electric utility's or |
|
power generation company's federal income taxes; |
|
(4) the effect of the plan on current and potential |
|
competitors in the generation market; [and] |
|
(5) whether the plan is consistent with the public |
|
interest; |
|
(6) the ownership of generation resources in a zone; |
|
(7) the control of generation through the use of |
|
contracts between affiliated retail electric providers and |
|
independent power producers; and |
|
(8) the emissions credits owned or controlled by an |
|
electric utility or power generation company in a nonattainment |
|
area for national ambient air quality standards. |
|
SECTION 6. Section 39.407(a), Utilities Code, is amended to |
|
read as follows: |
|
(a) If an electric utility chooses on or after January 1, |
|
2007, to participate in customer choice, the commission may not |
|
authorize customer choice until the applicable power region has |
|
been certified as a qualifying power region under Section |
|
39.152(a). Except as otherwise provided by this subsection, the |
|
commission shall certify that the requirements of Section |
|
39.152(a)(3) are met for electric utilities subject to this |
|
subchapter only upon a finding that the total capacity owned, |
|
controlled, or owned and controlled in any combination by each such |
|
electric utility and its affiliates does not exceed 20 percent of |
|
the total installed generation capacity within the constrained |
|
geographic region served by each such electric utility plus the |
|
total available transmission capacity capable of delivering firm |
|
power and energy to that constrained geographic region. Not later |
|
than May 1, 2002, each electric utility subject to this subchapter |
|
shall submit to the electric utility restructuring legislative |
|
oversight committee an analysis of the needed transmission |
|
facilities necessary to make the electric utility's service area |
|
transmission capability comparable to areas within the ERCOT power |
|
region. On or after September 1, 2003, each electric utility |
|
subject to this subchapter shall file the utility's plans to |
|
develop the utility's transmission interconnections with the |
|
utility's power region or other adjacent power regions. The |
|
commission shall review the plan and not later than the 180th day |
|
after the date the plan is filed, determine the additional |
|
transmission facilities necessary to provide access to power and |
|
energy that is comparable to the access provided in areas within the |
|
ERCOT power region; provided, however, that if a hearing is |
|
requested by any party to the proceeding, the 180-day deadline will |
|
be extended one day for each day of hearings. The commission shall, |
|
as a part of the commission's approval of the plan, approve a rate |
|
rider mechanism for the recovery of the incremental costs of those |
|
facilities after the facilities are completed and in-service. A |
|
finding of need under this subsection shall meet the requirements |
|
of Sections 37.056(c)(1), (2), and (4)(E). The commission may |
|
certify that the requirements of Section 39.152(a)(3) are met for |
|
electric utilities subject to this subchapter if the commission |
|
finds that: |
|
(1) each such utility has sufficient transmission |
|
facilities to provide customers access to power and energy from |
|
capacity controlled by suppliers not affiliated with the incumbent |
|
utility that is comparable to the access to power and energy from |
|
capacity controlled by suppliers not affiliated with the incumbent |
|
utilities in areas of the ERCOT power region; and |
|
(2) the total capacity owned, controlled, or owned and |
|
controlled in any combination by each such electric utility and its |
|
affiliates does not exceed 20 percent of the total installed |
|
generation capacity within the power region. |
|
SECTION 7. Section 39.453(b), Utilities Code, is amended to |
|
read as follows: |
|
(b) The commission shall certify that the requirement of |
|
Section 39.152(a)(3) is met for an electric utility subject to this |
|
subchapter only if the commission finds that the total capacity |
|
owned, controlled, or owned and controlled in any combination by |
|
the electric utility and the utility's affiliates does not exceed |
|
20 percent of the total installed generation capacity within the |
|
power region of that utility. |
|
SECTION 8. Sections 39.153(b) and 39.154(e), Utilities |
|
Code, are repealed. |
|
SECTION 9. This Act takes effect immediately if it receives |
|
a vote of two-thirds of all the members elected to each house, as |
|
provided by Section 39, Article III, Texas Constitution. If this |
|
Act does not receive the vote necessary for immediate effect, this |
|
Act takes effect September 1, 2009. |