AN ACT
|
|
relating to certificates of convenience and necessity for the |
|
construction of transmission facilities. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Subchapter B, Chapter 37, Utilities Code, is |
|
amended by adding Section 37.0541 to read as follows: |
|
Sec. 37.0541. CONSOLIDATION OF CERTAIN PROCEEDINGS. The |
|
commission shall consolidate the proceeding on an application to |
|
obtain or amend a certificate of convenience and necessity for the |
|
construction of a transmission line with the proceeding on another |
|
application to obtain or amend a certificate of convenience and |
|
necessity for the construction of a transmission line if it is |
|
apparent from the applications or a motion to intervene in either |
|
proceeding that the transmission lines that are the subject of the |
|
separate proceedings share a common point of interconnection. This |
|
section does not apply to a proceeding on an application for a |
|
certificate of convenience and necessity for a transmission line to |
|
serve a competitive renewable energy zone as part of a plan |
|
developed by the commission under Section 39.904(g)(2). |
|
SECTION 2. Section 37.051, Utilities Code, is amended by |
|
amending Subsection (a) and adding Subsections (d), (e), and (f) to |
|
read as follows: |
|
(a) An electric utility or other person may not directly or |
|
indirectly provide service to the public under a franchise or |
|
permit unless the utility or other person first obtains from the |
|
commission a certificate that states that the public convenience |
|
and necessity requires or will require the installation, operation, |
|
or extension of the service. |
|
(d) A certificate may be granted to an electric utility or |
|
other person under this section for a facility used as part of the |
|
transmission system serving the ERCOT power region solely for the |
|
transmission of electricity. |
|
(e) The commission may consider an application filed by a |
|
person not currently certificated as an electric utility for a |
|
certificate of convenience and necessity to construct transmission |
|
capacity that serves the ERCOT power region. Before granting a |
|
certificate under this section, the commission must find, after |
|
notice and hearing, that: |
|
(1) the applicant has the technical ability, financial |
|
ability, and sufficient resources in this state to own, operate, |
|
and maintain reliable transmission facilities; |
|
(2) the applicant has the resources and ability to |
|
comply with commission rules, requirements of the independent |
|
organization certified under Section 39.151 for the ERCOT power |
|
region, and requirements of the National Electric Reliability |
|
Council applicable to the provisions of transmission service; and |
|
(3) for an application filed by a person that is not an |
|
electric utility, granting the application will not adversely |
|
affect wholesale transmission rates, as compared to the rates |
|
projected to be charged if an existing electric utility were to |
|
build the transmission facility. |
|
(f) The commission shall consider the requirements of |
|
Subsection (e) to have been met by an electric utility or other |
|
person that: |
|
(1) is selected by the commission as a transmission |
|
provider under a plan adopted by the commission under Section |
|
39.904 not later than September 1, 2009; and |
|
(2) before the certificate is issued, provides to the |
|
commission a detailed plan regarding the offices, personnel, and |
|
other resources the electric utility or other person will have in |
|
this state to ensure provision of continuous and adequate |
|
transmission service. |
|
SECTION 3. Section 37.053(a), Utilities Code, is amended to |
|
read as follows: |
|
(a) An electric utility or other person that wants to obtain |
|
or amend a certificate must submit an application to the |
|
commission. |
|
SECTION 4. Sections 37.055, 37.057, and 37.151, Utilities |
|
Code, are amended to read as follows: |
|
Sec. 37.055. REQUEST FOR PRELIMINARY ORDER. (a) An |
|
electric utility or other person that wants to exercise a right or |
|
privilege under a franchise or permit that the utility or other |
|
person anticipates obtaining but has not been granted may apply to |
|
the commission for a preliminary order under this section. |
|
(b) The commission may issue a preliminary order declaring |
|
that the commission, on application and under commission rules, |
|
will grant the requested certificate on terms the commission |
|
designates, after the electric utility or other person obtains the |
|
franchise or permit. |
|
(c) The commission shall grant the certificate on |
|
presentation of evidence satisfactory to the commission that the |
|
electric utility or other person has obtained the franchise or |
|
permit. |
|
Sec. 37.057. DEADLINE FOR APPLICATION FOR NEW TRANSMISSION |
|
FACILITY. The commission may grant a certificate for a new |
|
transmission facility to a qualified applicant that meets the |
|
requirements of this subchapter. The commission must approve or |
|
deny an application for a certificate for a new transmission |
|
facility not later than the first anniversary of the date the |
|
application is filed. If the commission does not approve or deny |
|
the application on or before that date, a party may seek a writ of |
|
mandamus in a district court of Travis County to compel the |
|
commission to decide on the application. |
|
Sec. 37.151. PROVISION OF SERVICE. Except as provided by |
|
this section, Section 37.152, and Section 37.153, a certificate |
|
holder, other than one granted a certificate under Section |
|
37.051(d), shall: |
|
(1) serve every consumer in the utility's certificated |
|
area; and |
|
(2) provide continuous and adequate service in that |
|
area. |
|
SECTION 5. This Act takes effect immediately if it receives |
|
a vote of two-thirds of all the members elected to each house, as |
|
provided by Section 39, Article III, Texas Constitution. If this |
|
Act does not receive the vote necessary for immediate effect, this |
|
Act takes effect September 1, 2009. |
|
|
|
______________________________ |
______________________________ |
|
President of the Senate |
Speaker of the House |
|
|
|
I certify that H.B. No. 3309 was passed by the House on April |
|
24, 2009, by the following vote: Yeas 138, Nays 0, 1 present, not |
|
voting; that the House refused to concur in Senate amendments to |
|
H.B. No. 3309 on May 29, 2009, and requested the appointment of a |
|
conference committee to consider the differences between the two |
|
houses; and that the House adopted the conference committee report |
|
on H.B. No. 3309 on May 31, 2009, by the following vote: Yeas 143, |
|
Nays 0, 2 present, not voting. |
|
|
|
______________________________ |
|
Chief Clerk of the House |
|
|
I certify that H.B. No. 3309 was passed by the Senate, with |
|
amendments, on May 27, 2009, by the following vote: Yeas 31, Nays |
|
0; at the request of the House, the Senate appointed a conference |
|
committee to consider the differences between the two houses; and |
|
that the Senate adopted the conference committee report on H.B. No. |
|
3309 on May 31, 2009, by the following vote: Yeas 31, Nays 0. |
|
|
|
______________________________ |
|
Secretary of the Senate |
|
APPROVED: __________________ |
|
Date |
|
|
|
__________________ |
|
Governor |