A BILL TO BE ENTITLED
|
|
AN ACT
|
|
relating to a requirement that an applicant for a permit to |
|
construct an electric generating facility demonstrate that a |
|
sufficient amount of water is available for use in connection with |
|
the operation of the facility. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Section 382.0518, Health and Safety Code, is |
|
amended by adding Subsection (j) to read as follows: |
|
(j) Notwithstanding Subsection (b), the commission may not |
|
grant a permit to construct an electric generating facility unless |
|
the applicant for the permit submits to the commission and the |
|
appropriate regional water planning group a study that demonstrates |
|
that a sufficient amount of water is available in the applicable |
|
regional water planning area for use in connection with the |
|
operation of the facility. |
|
SECTION 2. The change in law made by this Act applies only |
|
to an application for a permit or permit amendment that is submitted |
|
to the Texas Commission on Environmental Quality on or after the |
|
effective date of this Act. An application for a permit or permit |
|
amendment that was submitted to the Texas Commission on |
|
Environmental Quality before the effective date of this Act is |
|
governed by the law in effect at the time the application was filed, |
|
and the former law is continued in effect for that purpose. |
|
SECTION 3. This Act takes effect September 1, 2009. |