A BILL TO BE ENTITLED
|
|
AN ACT
|
|
|
relating to the use and management of surface water resources. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Section 11.002, Water Code, is amended by |
|
amending Subdivision (1) and adding Subdivision (7) to read as |
|
follows: |
|
(1) "Commission" means the Texas [Natural Resource
|
|
Conservation] Commission on Environmental Quality. |
|
(7) "Developed water" means: |
|
(A) groundwater that is in a watercourse or |
|
stream, that would not be in the watercourse or stream but for the |
|
efforts of the developer, and that is intended for subsequent |
|
diversion and use by the developer; |
|
(B) surface water obtained through an approved |
|
interbasin transfer of water that is in a watercourse or stream, |
|
that would not be in the watercourse or stream but for the efforts |
|
of the developer, and that is intended for subsequent diversion and |
|
use by the developer; |
|
(C) waters imported from another state; and |
|
(D) waters originating in the bays or arms of the |
|
Gulf of Mexico. |
|
SECTION 2. Subsection (e), Section 11.023, Water Code, is |
|
amended to read as follows: |
|
(e) The amount of water appropriated for each purpose |
|
mentioned in this section shall be specifically appropriated, |
|
stored, or diverted for that purpose, subject to the preferences |
|
prescribed in Section 11.024 of this code. The commission may |
|
authorize appropriation of a single amount or volume of water for |
|
more than one purpose of use. In the event that a single amount or |
|
volume of water is appropriated for more than one purpose of use, |
|
the total amount of water actually diverted for all of the |
|
authorized purposes may not exceed the total amount of water |
|
appropriated. |
|
SECTION 3. Subsection (b), Section 11.042, Water Code, is |
|
amended to read as follows: |
|
(b) A person who wishes to discharge and then subsequently |
|
divert and reuse the person's existing return flows derived from |
|
developed water [privately owned groundwater] must obtain prior |
|
authorization from the commission for the diversion and the reuse |
|
of these return flows. The authorization may allow for the |
|
diversion and reuse by the discharger of existing return flows, |
|
less carriage losses, and shall be subject to special conditions if |
|
necessary to protect an existing water right that was granted based |
|
on the use or availability of these return flows. Special |
|
conditions may also be provided to help maintain instream uses and |
|
freshwater inflows to bays and estuaries. A person wishing to |
|
divert and reuse future increases of return flows derived from |
|
developed water [privately owned groundwater] must obtain |
|
authorization to reuse increases in return flows before the |
|
increase. |
|
SECTION 4. Subsection (c), Section 11.126, Water Code, is |
|
amended to read as follows: |
|
(c) If the application proposes construction of a dam |
|
greater than six feet in height measured from the channel invert |
|
elevation to the top of the dam either for diversion or storage, the |
|
executive director may also require filing a copy of all plans and |
|
specifications and a copy of the engineer's field notes of any |
|
survey of the lake or reservoir. No work on the project shall |
|
proceed until approval of the plans is obtained from the executive |
|
director. |
|
SECTION 5. This Act takes effect September 1, 2009. |
|
|
|
* * * * * |