System updates will be applied on February 19, 2026 at 6:00 PM. These updates will include changes to the user interface. Work is expected to take approximately 30 minutes to complete, during which the site will be unavailable.


Amend CSHB 1201 (house committee printing) as follows:
(1)  On page 8, line 12, strike "and".
(2)  On page 8, strike lines 13-15, and substitute the following:
(2)  the commission determines, after an engineering and traffic investigation conducted after traffic conditions on that part of the highway system have stabilized but not earlier than the first anniversary of the date that part of the highway system opens to traffic, that the established speed limit is reasonable and safe for that part of the highway system; and
(3)  construction of that part of the highway system is completed on or after June 1, 2011.