Amend CSSB 937 (senate committee report) in SECTION 1 of the bill, in added Section 38.072, Utilities Code (page 1, between lines 31 and 32), by inserting the following subsection and redesignating subsequent subsections accordingly:
(c)  The rules adopted by the commission under Subsection (b) must allow an electric utility to exercise the electric utility's discretion to prioritize power restoration for a facility after an extended power outage in accordance with the facility's needs and with the characteristics of the geographic area in which power must be restored.