System updates will be applied on February 19, 2026 at 6:00 PM. These updates will include changes to the user interface. Work is expected to take approximately 30 minutes to complete, during which the site will be unavailable.
Amend CSHB 912 (house committee printing) as follows:
(1) On page 4, line 1, after the underlined semicolon, strike "or".
(2) On page 4, line 3, between "pixel" and the underlined period, insert the following:
;
(13) in connection with oil pipeline safety and rig protection;
(14) in connection with port authority surveillance and security;
(15) in connection with cattle ranching or agriculture and wildlife management;
(16) in connection with oil and gas exploration;
(17) for the purpose of water supply safety;
(18) for the purpose of surveying land;
(19) for the purpose of agriculture and farming safety; or
(20) in connection with an air show or related event