System updates will be applied on February 19, 2026 at 6:00 PM. These updates will include changes to the user interface. Work is expected to take approximately 30 minutes to complete, during which the site will be unavailable.
Amend CSSB 820 (Senate Committee Printing) as follows:
(1) In SECTION 5 of the bill, at the end of proposed Section 43.370(b), Parks and Wildlife Code (page 3, between lines 57 and 58), insert the following:
(c) The deer breeder may waive the 10-day waiting period required under Subsection (b)(2).
(2) In SECTION 6 of the bill, at the end of proposed Section 43.6055(b), Parks and Wildlife Code (page 4, between lines 3 and 4), insert the following:
(c) The permit holder may waive the 10-day waiting period required under Subsection (b)(2).
(3) In SECTION 7 of the bill, at the end of proposed Section 43.6255(b), Parks and Wildlife Code (page 4, between lines 18 and 19), insert the following:
(c) The permit holder may waive the 10-day waiting period required under Subsection (b)(2).