|
|
|
|
AN ACT
|
|
relating to the filing with the state of electric logs by operators |
|
of oil-related or gas-related wells; providing a penalty. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Section 91.552, Natural Resources Code, is |
|
amended to read as follows: |
|
Sec. 91.552. ELECTRIC LOGS REQUIRED TO BE FILED; CRITERIA. |
|
(a) Except as otherwise provided by this subchapter, not later than |
|
the 90th day after the date a drilling operation is completed, the |
|
operator shall file with the commission a copy of each electric log, |
|
including each borehole section of the log at all depths, [a basic
|
|
electric log] run after September 1, 2013 [September 1, 1985], in |
|
conjunction with the drilling or deepening of the well that meets |
|
basic criteria established by the commission. Each electric log |
|
must be filed with the commission electronically in a manner |
|
acceptable to the commission if the commission has the |
|
technological capability to receive the electronic filing. |
|
(b) The commission by rule shall establish criteria for |
|
[basic] electric logs to be filed with the commission. |
|
(c) Not later than the deadline prescribed by Subsection (a) |
|
for the filing of each electric log, an operator shall file with the |
|
commission a copy of a cased hole log run after September 1, 2013, |
|
in conjunction with the drilling or deepening of a well in lieu of |
|
an electric log run after that date if: |
|
(1) a cased hole log was run; and |
|
(2) an electric log was not run. |
|
(d) Nothing in this subchapter requires an operator to run |
|
an electric log in conjunction with the drilling or deepening of a |
|
well. |
|
SECTION 2. Sections 91.553(b), (e), and (f), Natural |
|
Resources Code, are amended to read as follows: |
|
(b) Not later than the date by which an electric log is |
|
required to be filed with the commission under Section 91.552, the |
|
operator may file a written request with the commission asking that |
|
the electric log remain confidential and not be made available as |
|
public information. On filing this request, the electric log or |
|
copy of the electric log required to be filed with the commission |
|
may be retained by the operator, and the electric log may remain in |
|
the possession of the operator for the period of confidentiality |
|
[and any extensions of that period]. On filing of the request for |
|
confidentiality, the electric log becomes confidential and remains |
|
confidential for a period of: |
|
(1) three years [one year] after the date that the |
|
drilling operation was completed, if the well is an onshore well; or |
|
(2) five years after the date that the drilling |
|
operation was completed, if the well is a bay or offshore well. |
|
(e) An operator required to file an electric log under this |
|
section who has held the log during a period of confidentiality [or
|
|
any extensions of that period] shall file the log with the |
|
commission within 30 days after the conclusion of the period of |
|
confidentiality [or the period of the last extension]. |
|
(f) An operator who fails to timely file with the commission |
|
a written request under Subsection (b) that an electric log remain |
|
confidential and not be made available as public information [or a
|
|
written request under Subsection (c) or (d) for an extension of the
|
|
period of confidentiality] shall file the log with the commission |
|
immediately after the conclusion of the period for filing the |
|
request. |
|
SECTION 3. Section 91.556, Natural Resources Code, is |
|
amended to read as follows: |
|
Sec. 91.556. ENFORCEMENT [DENIAL OF ALLOWABLE]. If an |
|
operator fails to file an electric log as required by this |
|
subchapter, the commission may: |
|
(1) if the well is completed as a producing well, |
|
refuse to assign an allowable or a change in allowable for |
|
production from the well for which the electric log is required |
|
until the operator files the electric log with the commission; or |
|
(2) impose an administrative penalty on the operator |
|
in the manner provided by Sections 81.0531-81.0534 for each well |
|
for which the operator failed to file an electric log. |
|
SECTION 4. Section 552.113(c)(2), Government Code, is |
|
amended to read as follows: |
|
(2) "Electric [Basic electric] logs" has the same |
|
meaning as it has in Chapter 91, Natural Resources Code. |
|
SECTION 5. Sections 552.113(d), (e), and (f), Government |
|
Code, are amended to read as follows: |
|
(d) Confidential material, except [basic] electric logs, |
|
filed in the General Land Office on or after September 1, 1985, is |
|
public information and is available to the public under Section |
|
552.021 on and after the later of: |
|
(1) five years from the filing date of the |
|
confidential material; or |
|
(2) one year from the expiration, termination, or |
|
forfeiture of the lease in connection with which the confidential |
|
material was filed. |
|
(e) Electric [Basic electric] logs filed in the General Land |
|
Office on or after September 1, 1985, are either public information |
|
or confidential material to the same extent and for the same periods |
|
provided for the same logs by Chapter 91, Natural Resources Code. A |
|
person may request that an [a basic] electric log that has been |
|
filed in the General Land Office be made confidential by filing with |
|
the land office a copy of the written request for confidentiality |
|
made to the Railroad Commission of Texas for the same log. |
|
(f) The following are public information: |
|
(1) [basic] electric logs filed in the General Land |
|
Office before September 1, 1985; and |
|
(2) confidential material, except [basic] electric |
|
logs, filed in the General Land Office before September 1, 1985, |
|
provided, that Subsection (d) governs the disclosure of that |
|
confidential material filed in connection with a lease that is a |
|
valid and subsisting lease on September 1, 1995. |
|
SECTION 6. Sections 91.553(c) and (d), Natural Resources |
|
Code, are repealed. |
|
SECTION 7. The changes in law made by this Act apply only to |
|
a drilling operation that is completed on or after the effective |
|
date of this Act. A drilling operation that is completed before the |
|
effective date of this Act is subject to the law in effect on the |
|
date of completion, and that law is continued in effect for that |
|
purpose. |
|
SECTION 8. This Act takes effect September 1, 2013. |
|
|
|
______________________________ |
______________________________ |
|
President of the Senate |
Speaker of the House |
|
|
|
I certify that H.B. No. 878 was passed by the House on April |
|
18, 2013, by the following vote: Yeas 143, Nays 0, 2 present, not |
|
voting. |
|
|
|
______________________________ |
|
Chief Clerk of the House |
|
|
|
I certify that H.B. No. 878 was passed by the Senate on May |
|
15, 2013, by the following vote: Yeas 31, Nays 0. |
|
|
|
______________________________ |
|
Secretary of the Senate |
|
APPROVED: _____________________ |
|
Date |
|
|
|
_____________________ |
|
Governor |