83R6628 SLB-D
 
  By: Burnam H.B. No. 3597
 
 
 
A BILL TO BE ENTITLED
 
AN ACT
  relating to the authority of the Railroad Commission of Texas to
  issue a permit to drill an oil or gas well in an easement held by the
  Texas Department of Transportation.
         BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
         SECTION 1.  Subchapter B, Chapter 91, Natural Resources
  Code, is amended by adding Section 91.021 to read as follows:
         Sec. 91.021.  PERMIT TO DRILL WELL IN TRANSPORTATION
  EASEMENT. (a)  In this section, "department" means the Texas
  Department of Transportation.
         (b)  Not later than the fifth day after the date the
  commission receives an application for a permit to drill an oil or
  gas well, the commission shall notify the department of the receipt
  of the application.
         (c)  Not later than the 30th day after the date the
  department receives the notice described by Subsection (b), the
  department shall notify the commission whether the proposed
  location of the well is in an easement held by the department.
         (d)  If the department notifies the commission that the
  proposed location of the well is in an easement held by the
  department, the commission may not issue the permit unless the
  commission includes in the permit conditions that prohibit drilling
  or other operations on the surface of land during the period in
  which the land is used by this state as a highway, road, street, or
  alley. This subsection does not prohibit the issuance of a permit
  for the drilling of a horizontal well the horizontal drain hole of
  which is proposed to be located under land used by this state as a
  highway, road, street, or alley if drilling or other operations
  will not be conducted on the surface of that land.
         SECTION 2.  Section 91.021, Natural Resources Code, as added
  by this Act, applies only to a permit application filed with the
  Railroad Commission of Texas on or after the effective date of this
  Act. A permit application filed with the commission before the
  effective date of this Act is governed by the law in effect when the
  application was filed, and the former law is continued in effect for
  that purpose.
         SECTION 3.  This Act takes effect September 1, 2013.