  By: Nichols, Whitmire S.B. No. 211
 
 
A BILL TO BE ENTITLED
 
AN ACT
  relating to the continuation and functions of the Texas Facilities
  Commission; authorizing fees.
         BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
         SECTION 1.  Section 30.022, Education Code, is amended by
  amending Subsection (h) and adding Subsection (h-1) to read as
  follows:
         (h)  Except as provided by Subsection (h-1), the [The] board
  has [exclusive] jurisdiction over the physical assets of the school
  and shall administer and spend appropriations made for the benefit
  of the school.
         (h-1)  The Texas Facilities Commission shall provide
  facilities maintenance services for the physical facilities of the
  school, including facilities construction, cabling, facility
  reconfiguration, and any other services as provided by a memorandum
  of understanding between the board and the Texas Facilities
  Commission.
         SECTION 2.  Section 30.052, Education Code, is amended by
  amending Subsection (h) and adding Subsection (h-1) to read as
  follows:
         (h)  Except as provided by Subsection (h-1), the [The] board
  has [exclusive] jurisdiction over the physical assets of the school
  and shall administer and spend appropriations to carry out the
  purposes of the school as provided by Section 30.051.
         (h-1)  The Texas Facilities Commission shall provide
  facilities maintenance services for the physical facilities of the
  school, including facilities construction, cabling, facility
  reconfiguration, and any other services as provided by a memorandum
  of understanding between the board and the Texas Facilities
  Commission.
         SECTION 3.  Section 443.007, Government Code, is amended by
  adding Subsection (a-1) to read as follows:
         (a-1)  If the board updates or modifies its long-range master
  plan for the preservation, maintenance, restoration, and
  modification of the Capitol and the Capitol grounds, the board must
  conform its plan to the Capitol Complex master plan prepared by the
  Texas Facilities Commission under Section 2166.105.
         SECTION 4.  Section 2152.002, Government Code, is amended to
  read as follows:
         Sec. 2152.002.  SUNSET PROVISION. The Texas Facilities 
  [Building and Procurement] Commission is subject to Chapter 325
  (Texas Sunset Act).  Unless continued in existence as provided by
  that chapter, the commission is abolished and this subtitle, except
  for Chapter 2170 and Section 2157.121, expires September 1, 2021 
  [2013].
         SECTION 5.  Subchapter B, Chapter 2152, Government Code, is
  amended by adding Section 2152.066 to read as follows:
         Sec. 2152.066.  NEGOTIATED RULEMAKING AND ALTERNATIVE
  DISPUTE RESOLUTION POLICY. (a)  The commission shall develop and
  implement a policy to encourage the use of:
               (1)  negotiated rulemaking procedures under Chapter
  2008 for the adoption of commission rules; and
               (2)  appropriate alternative dispute resolution
  procedures under Chapter 2009 to assist in the resolution of
  internal and external disputes under the commission's
  jurisdiction.
         (b)  The commission's procedures relating to alternative
  dispute resolution must conform, to the extent possible, to any
  model guidelines issued by the State Office of Administrative
  Hearings for the use of alternative dispute resolution by state
  agencies.
         (c)  The commission shall:
               (1)  coordinate the implementation of the policy
  adopted under Subsection (a);
               (2)  provide training as needed to implement the
  procedures for negotiated rulemaking or alternative dispute
  resolution; and
               (3)  collect data concerning the effectiveness of those
  procedures.
         SECTION 6.  Subsection (b), Section 2165.007, Government
  Code, is amended to read as follows:
         (b)  Notwithstanding any other law, the commission shall
  provide facilities management services in relation to all state
  agency facilities in Travis County or a county adjacent to Travis
  County.  The commission's duty does not apply to:
               (1)  a facility owned or operated by an institution of
  higher education;
               (2)  military facilities;
               (3)  facilities owned or operated by the Texas
  Department of Criminal Justice;
               (4)  facilities owned or operated by the Texas Juvenile
  Justice Department [Youth Commission];
               (5)  facilities owned or operated by the Texas
  Department of Transportation;
               (6)  the Capitol, including the Capitol Extension, the
  General Land Office building, the Bob Bullock Texas State History
  Museum, any museum located on the Capitol grounds, the Governor's
  Mansion, and any property maintained by the Texas Historical
  Commission under Sections 442.0072 and 442.0073;
               (7)  a facility determined by the commission to be
  completely residential;
               (8)  a regional or field office of a state agency;
               (9)  a facility located within or on state park
  property;
               (10)  the property known as the Finance Commission
  Building described by deed recorded in Volume 5080, Page 1099, of
  the Deed Records of Travis County, Texas; [or]
               (11)  the property known as the Credit Union Department
  Building described by deed recorded in Volume 6126, Page 27, of the
  Deed Records of Travis County, Texas;
               (12)  facilities owned or operated by the Texas School
  for the Blind and Visually Impaired; or
               (13)  facilities owned or operated by the Texas School
  for the Deaf.
         SECTION 7.  Section 2165.055, Government Code, is amended to
  read as follows:
         Sec. 2165.055.  REPORT ABOUT IMPROVEMENTS AND REPAIRS. The
  commission [biennially] on July 1 of each even-numbered year 
  [December 1st] shall electronically submit a report to the
  governor, lieutenant governor, speaker of the house of
  representatives, comptroller, and Legislative Budget Board on:
               (1)  all improvements and repairs that have been made,
  with an itemized account of receipts and expenditures; and
               (2)  the condition of all property under its control,
  with an estimate of needed improvements and repairs.
         SECTION 8.  Subsection (e), Section 2165.2035, Government
  Code, is amended to read as follows:
         (e)  On or before December 1 of each even-numbered year, the
  commission shall electronically submit a report to the legislature
  and the Legislative Budget Board describing the effectiveness of
  the program under this section.
         SECTION 9.  Section 2165.2046, Government Code, is amended
  to read as follows:
         Sec. 2165.2046.  REPORTS ON PARKING PROGRAMS.  On or before
  December [October] 1 of each even-numbered year, the commission
  shall electronically submit a report to the legislature and 
  Legislative Budget Board describing the effectiveness of parking
  programs developed by the commission under this subchapter.  The
  report must, at a minimum, include:
               (1)  the yearly revenue generated by the programs;
               (2)  the yearly administrative and enforcement costs of
  each program;
               (3)  yearly usage statistics for each program; and
               (4)  initiatives and suggestions by the commission to:
                     (A)  modify administration of the programs; and
                     (B)  increase revenue generated by the programs.
         SECTION 10.  Subchapter F, Chapter 2165, Government Code, is
  amended by adding Section 2165.259 to read as follows:
         Sec. 2165.259.  CAPITOL COMPLEX. (a)  In this section,
  "Capitol Complex" has the meaning assigned by Section 443.0071.
         (b)  Notwithstanding Subchapter D, the commission may not
  lease, sell, or otherwise dispose of real property or an interest in
  real property located in the Capitol Complex.
         (c)  This section does not affect the commission's authority
  under Subchapter E to lease space in state office buildings and
  parking garages.
         SECTION 11.  Chapter 2165, Government Code, is amended by
  adding Subchapter H to read as follows:
  SUBCHAPTER H.  PUBLIC AND PRIVATE FACILITIES AND INFRASTRUCTURE:  
  QUALIFYING PROJECTS
         Sec. 2165.351.  DEFINITIONS. In this subchapter:
               (1)  "Partnership Advisory Commission" means the
  Partnership Advisory Commission created by Chapter 2268.
               (2)  "Qualifying project" has the meaning assigned by
  Section 2267.001, as added by Chapter 1334 (S.B. 1048), Acts of the
  82nd Legislature, Regular Session, 2011.
         Sec. 2165.352.  COMMISSION REVIEW GUIDELINES AND POLICIES.
  (a)  In adopting the qualifying project review guidelines required
  by Section 2267.052, as added by Chapter 1334 (S.B. 1048), Acts of
  the 82nd Legislature, Regular Session, 2011, the commission must
  include review criteria and documentation to guide the initial
  review of each substantially complete qualifying project proposal
  received by the commission.
         (b)  The review criteria required under Subsection (a) at a
  minimum must include:
               (1)  the extent to which the qualifying project meets a
  public need;
               (2)  the extent to which the project meets the
  objectives and priorities of the commission and aligns with any
  applicable commission plans, including the Capitol Complex master
  plan developed under Section 2166.105;
               (3)  the technical and legal feasibility of the
  project;
               (4)  the adequacy of the qualifications, experience,
  and financial capacity of a private entity or other person
  submitting the proposal;
               (5)  any potentially unacceptable risks to this state;
  and
               (6)  whether an alternative delivery method is feasible
  and more effectively meets this state's goals.
         (c)  The commission's qualifying project review guidelines
  must:
               (1)  specify the types of professional expertise,
  including financial, real estate, legal, and other related
  expertise, needed to effectively protect this state's interest when
  considering and implementing a qualifying project;
               (2)  specify the range of professional expertise needed
  at each stage of the project, including proposal evaluation,
  financial analysis, risk allocation analysis, contract
  negotiation, and contract and performance monitoring, to evaluate
  the qualifying project proposal; and
               (3)  require the oversight committee established by the
  commission for each qualifying project to report to the commission
  the results of the committee's evaluation of the project, including
  the schedules, procedures, proposal evaluation criteria, and
  documentation required in the guidelines for the evaluation.
         (d)  The commission shall:
               (1)  for each qualifying project proposal, post on the
  commission's Internet website the oversight committee's review
  report and other evaluation documents; and
               (2)  before posting the report and documents required
  under Subdivision (1), redact all information included in the
  report and documents that is considered confidential under Section
  2267.066(c).
         (e)  The expertise described by Subsection (c) may be
  provided by commission staff or outside experts.
         Sec. 2165.353.  QUALIFYING PROJECT FEES. (a)  The
  commission may charge a reasonable fee to cover the costs of
  reviewing a qualifying project.  The commission shall develop and
  adopt a qualifying project proposal fee schedule sufficient to
  cover its costs, including at a minimum the costs of processing,
  reviewing, and evaluating the proposals.
         (b)  The commission shall use the professional expertise
  information required under Section 2165.352(c) to determine the
  amount of the fee charged by the commission to review a qualifying
  project proposal. The amount must be reasonable in comparison to
  the level of professional expertise required for the project and
  may include the cost of staff time required to process the proposal
  and other direct costs.
         (c)  The commission may use the money from the fees collected
  under this section to hire or contract with persons who have the
  professional expertise necessary to effectively evaluate a
  qualifying project proposal.
         Sec. 2165.354.  INITIAL REVIEW OF QUALIFYING PROJECT
  PROPOSAL. (a)  The commission staff shall conduct an initial
  review of each qualifying project proposal submitted to the
  commission and provide to commission members a summary of the
  review, including an analysis and recommendations.
         (b)  Subject to Subsection (c), the commission shall use a
  value for money analysis in evaluating each qualifying project
  proposal to:
               (1)  conduct a thorough risk analysis of the proposal
  that identifies specific risks shared between this state and the
  private partner and subjects the risks to negotiation in the
  contract;
               (2)  determine if the proposal is in the best long-term
  financial interest of this state; and
               (3)  determine if the project will provide a tangible
  public benefit to this state.
         (c)  If commission staff determine that a value for money
  analysis is not appropriate for evaluating a specific qualifying
  project proposal, the staff shall submit to the commission a
  written report stating the reasons for using an alternative
  analysis methodology.
         (d)  The commission shall coordinate with the commission's
  office of internal audit for review and receipt of comments on the
  reasonableness of the assumptions used in the value for money
  analysis or alternative analysis methodology used to evaluate a
  qualifying project proposal under this section.
         Sec. 2165.355.  INITIAL PUBLIC HEARING ON QUALIFYING PROJECT
  PROPOSAL. (a)  Before submitting a detailed qualifying project
  proposal to the Partnership Advisory Commission as required under
  Section 2268.058, the commission must hold an initial public
  hearing on the proposal.
         (b)  The commission must post a copy of the detailed
  qualifying project proposal on the commission's Internet website
  before the required public hearing and, before posting the
  proposal, redact all information included in the proposal that is
  considered confidential under Section 2267.066(c).
         (c)  After the hearing, the commission shall:
               (1)  modify the proposal as the commission determines
  appropriate based on the public comments; and
               (2)  include the public comments in the documents
  submitted to the Partnership Advisory Commission and provide any
  additional information necessary for the evaluation required under
  Chapter 2268.
         Sec. 2165.356.  SUBMISSION OF QUALIFYING PROJECT CONTRACT TO
  CONTRACT ADVISORY TEAM. (a)  Not later than the 60th day before the
  date the commission is scheduled to vote on approval of a qualifying
  project contract, the commission must submit to the Contract
  Advisory Team established under Subchapter C, Chapter 2262,
  documentation of the modifications to a proposed qualifying project
  made during the commission's evaluation and negotiation process for
  the project, including a copy of:
               (1)  the final draft of the contract;
               (2)  the detailed qualifying project proposal; and
               (3)  any executed interim or other agreement.
         (b)  The Contract Advisory Team shall review the
  documentation submitted under Subsection (a) and provide written
  comments and recommendations to the commission. The review must
  focus on, but not be limited to, best practices for contract
  management and administration.
         (c)  Commission staff shall provide to the commission
  members:
               (1)  a copy of the Contract Advisory Team's written
  comments and recommendations; and
               (2)  the staff's response to the comments and
  recommendations.
         Sec. 2165.357.  PROHIBITED EMPLOYMENT OF COMMISSION
  EMPLOYEE. (a)  A commission employee may not be employed or hired
  by another person to perform duties that relate to the employee's
  specific duties in developing and implementing a qualifying
  project, including review, evaluation, development, and
  negotiation of a qualifying project proposal.
         (b)  The commission shall obtain from each commission
  employee sufficient information for the commission to determine
  whether:
               (1)  the employee is employed by another person; and
               (2)  a potential conflict of interest exists between
  the employee's commission duties and the employee's duties with the
  other employer.
         (c)  Each commission employee whose commission duties relate
  to a qualifying project, including long-range planning, real estate
  management, space management, and leasing services, shall attest
  that the employee is aware of and agrees to the commission's ethics
  and conflict-of-interest policies.
         (d)  To the extent the employment is authorized by commission
  policy, this section does not prohibit additional employment for a
  commission employee whose commission duties are not related to a
  qualifying project.
         SECTION 12.  Section 2166.001, Government Code, is amended
  by amending Subdivisions (1) and (1-a) and adding Subdivision (1-b)
  to read as follows:
               (1)  "Capitol Complex" has the meaning prescribed by
  Section 411.061(a)(1).
               (1-a)  "Commission" means the Texas Facilities
  Commission.
               (1-b) [(1-a)]  "Construction" includes acquisition and
  reconstruction.
         SECTION 13.  Subsection (d), Section 2166.101, Government
  Code, is amended to read as follows:
         (d)  The commission shall summarize its findings on the
  status of state-owned buildings and current information on
  construction costs in an electronically submitted [a] report [it
  shall make available] to the governor, lieutenant governor, speaker
  of the house of representatives, comptroller, and Legislative
  Budget Board not later than July 1 of each even-numbered year [the
  legislature, and the state's budget offices].
         SECTION 14.  Subsection (b), Section 2166.102, Government
  Code, is amended to read as follows:
         (b)  The commission shall maintain a six-year capital
  planning cycle and shall electronically submit [file] a master
  facilities plan with the governor, lieutenant governor, speaker of
  the house of representatives, [Governor's Office of Budget and
  Planning, the] Legislative Budget Board, and [the] comptroller
  before July 1 of each even-numbered year.
         SECTION 15.  Subsection (b), Section 2166.103, Government
  Code, is amended to read as follows:
         (b)  Not later than July 1 of each even-numbered year [Before
  each legislative session], the commission shall electronically
  submit [send] to the governor, the lieutenant governor, the speaker
  of the house of representatives, the comptroller, and the
  Legislative Budget Board a report identifying counties in which
  more than 50,000 square feet of usable office space is needed and
  the commission's recommendations for meeting that need. The
  commission may recommend leasing or purchasing and renovating one
  or more existing buildings or constructing one or more buildings.
         SECTION 16.  Subchapter C, Chapter 2166, Government Code, is
  amended by adding Sections 2166.105, 2166.106, 2166.1065,
  2166.107, and 2166.108 to read as follows:
         Sec. 2166.105.  CAPITOL COMPLEX MASTER PLAN. (a)  The
  commission shall prepare a Capitol Complex master plan that at a
  minimum includes:
               (1)  an overview and summary of the previous plans for
  the Capitol Complex;
               (2)  a stated strategic vision and long-term goals for
  the Capitol Complex;
               (3)  an analysis of state property, including
  buildings, in the Capitol Complex and of the extent to which this
  state satisfies its space needs through use of the property;
               (4)  detailed, site-specific proposals for state
  property in the Capitol Complex, including proposals on the use of
  property and space for public sector purposes;
               (5)  an analysis of and recommendations for building
  design guidelines to ensure appropriate quality in new or remodeled
  buildings in the Capitol Complex;
               (6)  an analysis of and recommendations for Capitol
  Complex infrastructure needs, including transportation, utilities,
  and parking;
               (7)  for projects identified in the plan, an analysis
  of and recommendations for financing options;
               (8)  time frames for implementing the plan components
  and any projects identified in the plan;
               (9)  consideration of alternative options for meeting
  state space needs outside the Capitol Complex; and
               (10)  other information relevant to the Capitol Complex
  as the commission determines appropriate.
         (b)  The commission shall ensure that the General Land
  Office, the State Preservation Board, the Texas Historical
  Commission, and other relevant interested parties are included in
  each stage of the development of the Capitol Complex master plan.
         (c)  The commission shall submit to the governor, lieutenant
  governor, speaker of the house of representatives, comptroller, and
  Legislative Budget Board:
               (1)  not later than July 1, 2014, the initial Capitol
  Complex master plan; and
               (2)  not later than July 1 of each even-numbered year
  thereafter, updates to the plan.
         (d)  The commission shall ensure that the Capitol Complex
  master plan and the master facilities plan developed under Section
  2166.102 do not conflict and together comprehensively address the
  space needs of state agencies.
         Sec. 2166.106.  REVIEW OF PROPOSED CAPITOL COMPLEX MASTER
  PLAN BY STATE PRESERVATION BOARD AND GENERAL LAND OFFICE. (a)  Not
  later than the 90th day before the date the commission holds a
  public meeting to discuss a proposed Capitol Complex master plan,
  the commission must submit the proposed plan to the State
  Preservation Board and the General Land Office for review and
  comment.
         (b)  Not later than the 60th day before the date the
  commission holds a public meeting to discuss a proposed update to
  the Capitol Complex master plan, the commission must submit the
  proposed update to the State Preservation Board and the General
  Land Office for review and comment.
         (c)  Not later than the 90th day after the date the State
  Preservation Board receives from the commission a proposed Capitol
  Complex master plan and not later than the 60th day after the date
  the board receives from the commission a proposed update to the
  plan, the board may:
               (1)  by a public vote disapprove the plan or update if
  the board determines that the goals or recommendations in the plan
  or update are not in the best interest of the state or of the Capitol
  Complex; and
               (2)  submit to the commission written comments and
  recommended modifications to the plan or update.
         (d)  The proposed Capitol Complex master plan or the proposed
  update to the plan is considered to be approved by the State
  Preservation Board if the board does not hold the public vote
  authorized by Subsection (c) on or before the date required under
  that subsection.
         (e)  The review of the Capitol Complex master plan under this
  section is in addition to the review required for a proposed project
  under Section 443.0071.
         Sec. 2166.1065.  REVIEW OF CAPITOL COMPLEX MASTER PLAN BY
  PARTNERSHIP ADVISORY COMMISSION.  (a)  After a proposed Capitol
  Complex master plan or proposed update to the plan is submitted and
  considered approved under Section 2166.106 and before the
  commission adopts the plan or update, the commission must submit
  the plan or update to the Partnership Advisory Commission
  established under Chapter 2268 for review and comment.
         (b)  Not later than the 60th day after the date the
  Partnership Advisory Commission receives the plan or update, the
  advisory commission shall in a public hearing by majority vote of
  the members present:
               (1)  vote to approve the plan or update; or
               (2)  submit to the commission written comments and
  recommended modifications to the plan or update.
         Sec. 2166.107.  COMPREHENSIVE PLANNING AND DEVELOPMENT
  PROCESS. (a)  The commission by rule shall adopt a comprehensive
  process for planning and developing state property in the
  commission's inventory and for assisting state agencies in space
  development planning for state property under Sections 2165.105 and
  2165.1061.
         (b)  The process under this section at a minimum must
  include:
               (1)  a clear approach and specific time frames for
  obtaining input throughout the planning and development process
  from the public, interested parties, and state agencies, including
  the General Land Office;
               (2)  specific schedules for providing to the commission
  regular updates on planning and development efforts;
               (3)  a public involvement policy to ensure that before
  the commission makes a decision on the use or development of state
  property the public and interested parties have the opportunity to
  review and comment on the commission's plans; and
               (4)  confidentiality policies consistent with Chapter
  552.
         Sec. 2166.108.  COMPREHENSIVE CAPITAL IMPROVEMENT AND
  DEFERRED MAINTENANCE PLAN. (a)  The commission shall develop a
  comprehensive capital improvement and deferred maintenance plan
  that clearly defines the capital improvement needs and critical and
  noncritical maintenance needs of state buildings.
         (b)  The comprehensive capital improvement and deferred
  maintenance plan must:
               (1)  with respect to deferred maintenance projects:
                     (A)  list, with regular updates, deferred
  maintenance projects that contain critical high-priority projects
  and lower-priority, non-health and safety projects;
                     (B)  state the commission's plan for addressing
  the projects;
                     (C)  account for the completion of high-priority
  projects;
                     (D)  estimate when the lower-priority projects
  may become higher-priority projects; and
                     (E)  be modified as necessary to include
  additional maintenance projects;
               (2)  contain a list of all predictable capital
  improvement projects, including a time frame and a cost estimate
  for each project; and
               (3)  contain a plan, updated biennially, for responding
  to emergency repairs and replacements that, in consultation with
  the Legislative Budget Board, identifies potential sources of
  funds, which may include bonds and bond interest, that may be used
  to pay the costs of emergency repair and replacement projects.
         (c)  The comprehensive capital improvement and deferred
  maintenance plan must include for each segment of the plan
  described by Subsection (b) a prioritized list by state agency
  facility of each project that includes an estimate of the project's
  cost and the aggregate costs for all facility projects.
         (d)  The commission shall include the comprehensive capital
  improvement and deferred maintenance plan and regular updates to
  the plan in its long-range plan under Section 2166.102.  The
  information included in the long-range plan must include the
  aggregate project costs for each state agency but may exclude the
  cost of each specific facility project.
         SECTION 17.  Section 2267.001, Government Code, as added by
  Chapter 1334 (S.B. 1048), Acts of the 82nd Legislature, Regular
  Session, 2011, is amended by adding Subdivision (1-a) to read as
  follows:
               (1-a)  "Commission" means the Partnership Advisory
  Commission established under Chapter 2268.
         SECTION 18.  Section 2267.003, Government Code, as added by
  Chapter 1334 (S.B. 1048), Acts of the 82nd Legislature, Regular
  Session, 2011, is amended to read as follows:
         Sec. 2267.003.  APPLICABILITY.  This chapter does not apply
  to:
               (1)  the financing, design, construction, maintenance,
  or operation of a highway in the state highway system;
               (2)  a transportation authority created under Chapter
  451, 452, 453, or 460, Transportation Code; [or]
               (3)  any telecommunications, cable television, video
  service, or broadband infrastructure other than technology
  installed as part of a qualifying project that is essential to the
  project; or
               (4)  a qualifying project located in the Capitol
  Complex, as defined by Section 443.0071.
         SECTION 19.  Subchapter A, Chapter 2267, Government Code, as
  added by Chapter 1334 (S.B. 1048), Acts of the 82nd Legislature,
  Regular Session, 2011, is amended by adding Sections 2267.005,
  2267.006, 2267.007, and 2267.008 to read as follows:
         Sec. 2267.005.  APPLICABILITY OF MUNICIPAL ZONING
  REGULATIONS. (a)  Except as provided by Subsection (b) and Section
  2267.006, a qualifying project that is to be performed or located in
  a municipality must comply with the zoning and land use regulations
  of the municipality.
         (b)  This section does not apply to a qualifying project
  that:
               (1)  uses a building, other structure, or land under
  the control, administration, or jurisdiction of a state agency for
  the same public purposes for which the state agency is authorized
  under the governing law that established the agency to use the
  building, structure, or land; or
               (2)  is located within the Capitol Complex, as defined
  by Section 411.061(a)(1).
         Sec. 2267.006.  SPECIAL BOARD OF REVIEW. (a)  If a
  qualifying project does not comply with the zoning and land use
  regulations of a municipality as required by Section 2267.005 and
  the municipality denies a rezoning request for the qualifying
  project, the matter may be appealed to a special board of review
  consisting of the following members:
               (1)  the land commissioner;
               (2)  the administrative head of the governing body of
  the responsible governmental entity;
               (3)  the mayor of the municipality;
               (4)  the county judge of the county in which the
  municipality is located;
               (5)  one state senator selected by the lieutenant
  governor;
               (6)  one member of the house of representatives
  selected by the speaker of the house; and
               (7)  the commission member appointed by the governor.
         (b)  The land commissioner shall serve as presiding officer
  of the special board of review.
         (c)  The special board of review shall conduct one or more
  public hearings to consider the proposed qualifying project. The
  hearings must be conducted in accordance with rules adopted by the
  General Land Office for conduct of special review.  The hearings are
  not considered a contested case proceeding under Chapter 2001.
         (d)  If after the hearings, the special board of review
  determines that the zoning and land use regulations are detrimental
  to the best interest of this state, the special board of review
  shall issue an order establishing a development plan to govern the
  use of the real property related to the qualifying project.
  Development of the real property must be in accordance with the plan
  and comply with all applicable municipal regulations, orders, or
  ordinances except as specifically identified by the order of the
  special board of review. If substantial progress is not made in
  implementing the qualifying project before the fifth anniversary of
  the date the development plan is adopted by the special board of
  review, the municipal zoning and land use regulations become
  applicable to development of the property, unless the special board
  of review adopts a new development plan.
         (e)  A development plan adopted by the special board of
  review and any plan accepted by a responsible governmental entity
  is final and binding on the state, the responsible governmental
  entity, lessees, successors in interest and assigns, and the
  affected municipality unless revised by the special board of
  review.
         (f)  A responsible governmental entity, builder, developer,
  or any other person may not modify the development plan without
  specific approval by the special board of review.
         Sec. 2267.007.  CONFLICT OF INTEREST. An employee of a
  responsible governmental entity or a person related to the employee
  within the second degree by consanguinity or affinity, as
  determined under Chapter 573, may not accept money, a financial
  benefit, or other consideration from a contracting person that has
  entered into a comprehensive agreement with the responsible
  governmental entity.
         Sec. 2267.008.  PROHIBITED EMPLOYMENT WITH FORMER OR RETIRED
  GOVERNMENTAL ENTITY EMPLOYEES. (a)  A contracting person may not
  employ or enter into a professional services contract or a
  consulting services contract under Chapter 2254 with a former or
  retired employee of the responsible governmental entity with which
  the person has entered into a comprehensive agreement before the
  first anniversary of the date on which the former or retired
  employee terminates employment with the entity.
         (b)  This section does not prohibit the contracting person
  from entering into a professional services contract with a
  corporation, firm, or other business organization that employs a
  former or retired employee of the responsible governmental entity
  before the first anniversary of the date the former or retired
  employee terminates employment with the entity if the former or
  retired employee does not perform services for the corporation,
  firm, or other business organization under the comprehensive
  agreement with the responsible governmental entity that the former
  or retired employee worked on before terminating employment with
  the entity.
         SECTION 20.  (a)  Section 2267.051, Government Code, as
  added by Chapter 1334 (S.B. 1048), Acts of the 82nd Legislature,
  Regular Session, 2011, is amended by amending Subsection (a) and
  adding Subsection (a-1) to read as follows:
         (a)  Except as provided by Subsection (a-1), a [A] person may
  not develop or operate a qualifying project unless the person
  obtains the approval of and contracts with the responsible
  governmental entity under this chapter.  The person may initiate
  the approval process by submitting a proposal requesting approval
  under Section 2267.053(a), or the responsible governmental entity
  may request proposals or invite bids under Section 2267.053(b).
         (a-1)  A person may not develop or operate a qualifying
  project on property located within the Capitol Complex, as defined
  by Section 411.061(a)(1), unless the person obtains the approval of
  and contracts with the responsible governmental entity under this
  chapter.  The person may not initiate the approval process by
  submitting a proposal requesting approval under Section
  2267.053(a). The responsible governmental entity may request
  proposals or invite bids under Section 2267.053(b).
         (b)  If S.B. No. 894, Acts of the 83rd Legislature, Regular
  Session, 2013, or similar legislation relating to real property
  within the Capitol Complex is enacted and becomes law, this section
  has no effect.
         SECTION 21.  Section 2267.052, Government Code, as added by
  Chapter 1334 (S.B. 1048), Acts of the 82nd Legislature, Regular
  Session, 2011, is amended by amending Subsections (b) and (c) and
  adding Subsection (d) to read as follows:
         (b)  The guidelines for a responsible governmental entity
  described by Section 2267.001(5)(A) must:
               (1)  require the responsible governmental entity to:
                     (A)  make a representative of the entity available
  to meet with persons who are considering submitting a proposal; and
                     (B)  provide notice of the representative's
  availability;
               (2)  provide reasonable criteria for choosing among
  competing proposals;
               (3)  contain suggested timelines for selecting
  proposals and negotiating an interim or comprehensive agreement;
               (4)  allow the responsible governmental entity to
  accelerate the selection, review, and documentation timelines for
  proposals involving a qualifying project considered a priority by
  the entity;
               (5)  include financial review and analysis procedures
  that at a minimum consist of:
                     (A)  a cost-benefit analysis;
                     (B)  an assessment of opportunity cost;
                     (C)  consideration of the degree to which
  functionality and services similar to the functionality and
  services to be provided by the proposed project are already
  available in the private market; and
                     (D)  consideration of the results of all studies
  and analyses related to the proposed qualifying project;
               (6)  allow the responsible governmental entity to
  consider the nonfinancial benefits of a proposed qualifying
  project;
               (7)  include criteria for:
                     (A)  the qualifying project, including the scope,
  costs, and duration of the project and the involvement or impact of
  the project on multiple public entities;
                     (B)  the creation of and the responsibilities of
  an oversight committee, with members representing the responsible
  governmental entity, that acts as an advisory committee to review
  the terms of any proposed interim or comprehensive agreement; and
                     (C)  compliance with the requirements of Chapter
  2268;
               (8)  require the responsible governmental entity to
  analyze the adequacy of the information to be released by the entity
  when seeking competing proposals and require that the entity
  provide more detailed information, if the entity determines
  necessary, to encourage competition, subject to Section
  2267.053(g);
               (9)  establish criteria, key decision points, and
  approvals required to ensure that the responsible governmental
  entity considers the extent of competition before selecting
  proposals and negotiating an interim or comprehensive agreement;
  and
               (10)  require the posting and publishing of public
  notice of a proposal requesting approval of a qualifying project,
  including:
                     (A)  specific information and documentation
  regarding the nature, timing, and scope of the qualifying project,
  as required under Section 2267.053(a);
                     (B)  a reasonable period, as determined by the
  responsible governmental entity, of not less than 45 days or more
  than 180 days, or a longer period specified by the governing body of
  the responsible governmental entity to accommodate a large-scale
  project, [as determined by the responsible governmental entity,] to
  encourage competition and partnerships with private entities and
  other persons in accordance with the goals of this chapter, during
  which the responsible governmental entity must accept submission of
  competing proposals for the qualifying project; and
                     (C)  a requirement for advertising the notice on
  the governmental entity's Internet website and on TexasOnline or
  the state's official Internet website.
         (c)  The guidelines of a responsible governmental entity
  described by Section 2267.001(5)(B) must include:
               (1)  [may include] the provisions required under
  Subsection (b); and
               (2)  [must include] a requirement that the governmental
  entity engage the services of qualified professionals, including an
  architect, professional engineer, or certified public accountant,
  not otherwise employed by the governmental entity, to provide
  independent analyses regarding the specifics, advantages,
  disadvantages, and long-term and short-term costs of any proposal
  requesting approval of a qualifying project unless the governing
  body of the governmental entity determines that the analysis of the
  proposal is to be performed by employees of the governmental
  entity.
         (d)  A responsible governmental entity described by Section
  2267.001(5)(A) shall submit a copy of the guidelines adopted by the
  entity under this section to the commission for approval by the
  commission.  The commission shall prescribe the procedure for
  submitting the guidelines for review under this section. The
  governmental entity may not request or consider a proposal for a
  qualifying project until the guidelines are approved by the
  commission.
         SECTION 22.  Section 2267.053, Government Code, as added by
  Chapter 1334 (S.B. 1048), Acts of the 82nd Legislature, Regular
  Session, 2011, is amended by amending Subsections (a) and (b) and
  adding Subsections (a-1), (b-1), and (b-2) to read as follows:
         (a)  A private entity or other person may submit a proposal
  requesting approval of a qualifying project by the responsible
  governmental entity.  The proposal must be accompanied by the
  following, unless waived by the responsible governmental entity:
               (1)  a topographic map, with a 1:2,000 or other
  appropriate scale, indicating the location of the qualifying
  project;
               (2)  a description of the qualifying project,
  including:
                     (A)  the conceptual design of any facility or a
  conceptual plan for the provision of services or technology
  infrastructure; and
                     (B)  a schedule for the initiation of and
  completion of the qualifying project that includes the proposed
  major responsibilities and timeline for activities to be performed
  by the governmental entity and the person;
               (3)  a statement of the method the person proposes for
  securing necessary property interests required for the qualifying
  project;
               (4)  information relating to any current plans for the
  development of facilities or technology infrastructure to be used
  by a governmental entity that are similar to the qualifying project
  being proposed by the person for each affected jurisdiction;
               (5)  a list of all permits and approvals required for
  the development and completion of the qualifying project from
  local, state, or federal agencies and a projected schedule for
  obtaining the permits and approvals;
               (6)  a list of any facilities that will be affected by
  the qualifying project and a statement of the person's plans to
  accommodate the affected facilities;
               (7)  a statement on the person's general plans for
  financing the qualifying project, including the sources of the
  person's funds and identification of any dedicated revenue source
  or proposed debt or equity investment for the person;
               (8)  the name and address of each individual who may be
  contacted for further information concerning the request;
               (9)  user fees, lease payments, and other service
  payments over the term of any applicable interim or comprehensive
  agreement and the methodology and circumstances for changes to the
  user fees, lease payments, and other service payments over time;
               (10)  a statement of the specific public purpose served
  by the qualifying project;
               (11)  a statement describing the qualifying project's
  compliance with the responsible governmental entity's best value
  determination under Subsection (b-1); and
               (12) [(10)]  any additional material and information
  the responsible governmental entity reasonably requests.
         (a-1)  A responsible governmental entity that approves a
  proposal for a qualifying project under Subsection (a) shall select
  the contracting person for the project by soliciting additional
  proposals through a request for qualifications, request for
  proposals, or invitation to bid.
         (b)  A responsible governmental entity may request proposals
  or invite bids from persons for the development or operation of a
  qualifying project.
         (b-1)  A responsible governmental entity shall make a best
  value determination in evaluating the proposals received and
  consider the total project cost as one factor in evaluating the
  proposals.  The responsible governmental entity [received, but] is
  not required to select the proposal that offers the lowest total
  project cost and[.  The responsible governmental entity] may
  consider the following factors:
               (1)  the proposed cost of the qualifying project;
               (2)  the general reputation, industry experience, and
  financial capacity of the person submitting a proposal;
               (3)  the proposed design and overall quality of the
  qualifying project;
               (4)  the eligibility of the project for accelerated
  selection, review, and documentation timelines under the
  responsible governmental entity's guidelines;
               (5)  comments from local citizens and affected
  jurisdictions;
               (6)  benefits to the public;
               (7)  the person's good faith effort to comply with the
  goals of a historically underutilized business plan;
               (8)  the person's plans to employ local contractors and
  residents;
               (9)  for a qualifying project that involves a
  continuing role beyond design and construction, the person's
  proposed rate of return and opportunities for revenue sharing;
               (10)  the relationship and conformity of the qualifying
  project to a state or local community plan impacted by the
  qualifying project or to the uses of property surrounding the
  qualifying project;
               (11)  the historic significance of the property on
  which the qualifying project is proposed to be located;
               (12)  the environmental impact of the qualifying
  project; and
               (13) [(10)]  other criteria that the responsible
  governmental entity considers appropriate.
         (b-2)  A responsible governmental entity may approve a
  qualifying project that the governmental entity determines serves a
  public purpose. The responsible governmental entity must include
  in the comprehensive agreement for the qualifying project a written
  declaration of the specific public purpose served by the project.
         SECTION 23.  Subsection (a), Section 2267.058, Government
  Code, as added by Chapter 1334 (S.B. 1048), Acts of the 82nd
  Legislature, Regular Session, 2011, is amended to read as follows:
         (a)  Before developing or operating the qualifying project,
  the contracting person must enter into a comprehensive agreement
  with a responsible governmental entity. The comprehensive
  agreement shall provide for:
               (1)  delivery of letters of credit or other security in
  connection with the development or operation of the qualifying
  project, in the forms and amounts satisfactory to the responsible
  governmental entity, and delivery of performance and payment bonds
  in compliance with Chapter 2253 for all construction activities;
               (2)  review of plans and specifications for the
  qualifying project by the responsible governmental entity and
  approval by the responsible governmental entity indicating that
  [if] the plans and specifications conform to standards acceptable
  to the responsible governmental entity, except that the contracting
  person may not be required to provide final design documents for
  [complete the design of] a qualifying project before the execution
  of a comprehensive agreement;
               (3)  inspection of the qualifying project by the
  responsible governmental entity to ensure that the contracting
  person's activities are acceptable to the responsible governmental
  entity in accordance with the comprehensive agreement;
               (4)  maintenance of a public liability insurance
  policy, copies of which must be filed with the responsible
  governmental entity accompanied by proofs of coverage, or
  self-insurance, each in the form and amount satisfactory to the
  responsible governmental entity and reasonably sufficient to
  ensure coverage of tort liability to the public and project
  employees and to enable the continued operation of the qualifying
  project;
               (5)  monitoring of the practices of the contracting
  person by the responsible governmental entity to ensure that the
  qualifying project is properly maintained;
               (6)  reimbursement to be paid to the responsible
  governmental entity for services provided by the responsible
  governmental entity;
               (7)  filing of appropriate financial statements on a
  periodic basis; and
               (8)  policies and procedures governing the rights and
  responsibilities of the responsible governmental entity and the
  contracting person if the comprehensive agreement is terminated or
  there is a material default by the contracting person, including
  conditions governing:
                     (A)  assumption of the duties and
  responsibilities of the contracting person by the responsible
  governmental entity; and
                     (B)  the transfer or purchase of property or other
  interests of the contracting person to the responsible governmental
  entity.
         SECTION 24.  The heading to Section 2267.066, Government
  Code, is amended to read as follows:
         Sec. 2267.066.  POSTING OF PROPOSALS; PUBLIC COMMENT; PUBLIC
  ACCESS TO PROCUREMENT RECORDS; FINAL VOTE.
         SECTION 25.  Section 2267.066, Government Code, is amended
  by amending Subsections (c) and (d) and adding Subsection (e-1) to
  read as follows:
         (c)  Chapter 552 applies to qualifying project proposals
  [Trade secrets, financial records, or other records of the
  contracting person excluded from disclosure under Section 552.101
  may not be posted or made available for public inspection except as
  otherwise agreed to by the responsible governmental entity and the
  contracting person].
         (d)  The responsible governmental entity shall hold a public
  hearing on the proposal during the proposal review process not
  later than the 30th day before the date the entity enters into an
  interim or comprehensive agreement. The public hearing shall be
  held in the area in which the proposed qualifying project is to be
  performed.
         (e-1)  After making the proposed comprehensive agreement
  available as required by Subsection (e), the responsible
  governmental entity shall hold a public hearing on the final
  version of the proposed comprehensive agreement and vote on the
  proposed comprehensive agreement after the hearing. The hearing
  must be held not later than the 10th day before the date the entity
  enters into a comprehensive agreement with a contracting person.
         SECTION 26.  (a)  Subchapter B, Chapter 2267, Government
  Code, as added by Chapter 1334 (S.B. 1048), Acts of the 82nd
  Legislature, Regular Session, 2011, is amended by adding Section
  2267.067 to read as follows:
         Sec. 2267.067.  QUALIFYING PROJECT IN CAPITOL COMPLEX.
  (a)  A qualifying project for property located in the Capitol
  Complex, as defined by Section 411.061(a)(1), must be consistent
  with Capitol Complex design guidelines or standards adopted as part
  of the Capitol Complex master plan developed under Section
  2166.105.
         (b)  A responsible governmental entity shall include design
  guidelines and standards defined in Subsection (a) in the request
  for proposals or invitation for bids for the development or
  operation of a qualifying project and inform the persons who submit
  proposals of the requirement to comply with the design guidelines
  and standards.  The final proposal or invitation must be submitted
  to the State Preservation Board for verification that the proposal
  complies with the design guidelines and standards.
         (c)  A responsible governmental entity shall submit a final
  qualifying project proposal for property in the area described by
  Subsection (a) to the State Preservation Board. The board by
  majority vote may disapprove the proposal not later than the 60th
  day after the date the proposal is received by the board.
         (d)  A responsible governmental entity may not approve a
  qualifying project proposal for property in the area described by
  Subsection (a) before September 1, 2015. This subsection expires
  September 1, 2015.
         (b)  If S.B. No. 894, Acts of the 83rd Legislature, Regular
  Session, 2013, or similar legislation relating to real property
  within the Capitol Complex is enacted and becomes law, this section
  has no effect.
         SECTION 27.  Subsection (a), Section 2268.052, Government
  Code, is amended to read as follows:
         (a)  The commission consists of the following five [11]
  members:
               (1)  the chair of the House Appropriations Committee
  [or the chair's designee];
               (2)  one representative [three representatives]
  appointed by the speaker of the house of representatives;
               (3)  the chair of the Senate Finance Committee [or the
  chair's designee];
               (4)  one senator [three senators] appointed by the
  lieutenant governor; and
               (5)  one public member [three representatives of the
  executive branch,] appointed by the governor.
         SECTION 28.  Section 2268.055, Government Code, is amended
  to read as follows:
         Sec. 2268.055.  MEETINGS. (a)  The commission shall hold
  meetings quarterly or on the call of the presiding officer.
         (b)  Commission meetings are subject to Chapter 551.
         SECTION 29.  Subsection (a), Section 2268.056, Government
  Code, is amended to read as follows:
         (a)  The State Preservation Board [legislative body that the
  presiding officer serves] shall provide administrative staff
  support for the commission.
         SECTION 30.  Subsections (e), (g), and (i), Section
  2268.058, Government Code, are amended to read as follows:
         (e)  The [If the] commission in a public hearing by majority
  vote of the members present shall approve or disapprove each
  detailed [accepts a] proposal submitted to the commission for
  review and may [, the commission shall] provide its findings and
  recommendations to the responsible governmental entity not later
  than the 45th day after the date the commission receives complete
  copies of the detailed proposal.  If the commission does not
  provide its findings or recommendations to the responsible
  governmental entity by that date, the commission is considered to
  [have declined review of the proposal and to] not have made any
  findings or recommendations on the proposal.
         (g)  The commission shall include in any [review accepted
  detailed proposals and provide] findings and recommendations
  provided to the responsible governmental entity [that include]:
               (1)  a determination on whether the terms of the
  proposal and proposed qualifying project create state
  tax-supported debt, taking into consideration the specific
  findings of the comptroller with respect to the recommendation;
               (2)  an analysis of the potential financial impact of
  the qualifying project;
               (3)  a review of the policy aspects of the detailed
  proposal and the qualifying project; and
               (4)  proposed general business terms.
         (i)  The [Except as provided by Subsection (e), the]
  responsible governmental entity may not negotiate [begin
  negotiation of] an interim or comprehensive agreement for a
  detailed proposal that has been disapproved by [until] the
  commission [has submitted its recommendations or declined to accept
  the detailed proposals for review].
         SECTION 31.  Subsection (c), Section 211.013, Local
  Government Code, is amended to read as follows:
         (c)  Except as provided by Section 2267.005, Government
  Code, this [This] subchapter does not apply to a building, other
  structure, or land under the control, administration, or
  jurisdiction of a state or federal agency.
         SECTION 32.  Subsection (d), Section 31.155, Natural
  Resources Code, is amended to read as follows:
         (d)  The duty under this subchapter of the division to review
  and verify real property records and to make recommendations
  regarding real property and of the commissioner to prepare a report
  involving real property does not apply to:
               (1)  the real property of an institution of higher
  education;
               (2)  the real property that is part of a fund created or
  specifically authorized by the constitution of this state and that
  is administered by or with the assistance of the land office;
               (3)  the real property of the Employees Retirement
  System of Texas; [and]
               (4)  the real property of the Teacher Retirement System
  of Texas; and
               (5)  the real property included in the Capitol Complex
  as defined by Section 411.061(a)(1), Government Code.
         SECTION 33.  Section 552.153, Government Code, as added by
  Chapter 1334 (Senate Bill No. 1048), Acts of the 82nd Legislature,
  Regular Session, 2011, is repealed.
         SECTION 34.  Subsection (d), Section 2268.058, Government
  Code, is repealed.
         SECTION 35.  (a)  Not later than January 1, 2014, the
  following are transferred from the Texas School for the Blind and
  Visually Impaired to the Texas Facilities Commission:
               (1)  the powers, duties, functions, programs, and
  activities of the Texas School for the Blind and Visually Impaired
  relating to the maintenance of the school's physical facilities;
               (2)  any obligations and contracts of the Texas School
  for the Blind and Visually Impaired that are directly related to
  implementing a power, duty, function, program, or activity
  transferred under this subsection; and
               (3)  all property and records in the custody of the
  Texas School for the Blind and Visually Impaired that are related to
  a power, duty, function, program, or activity transferred under
  this subsection and all funds appropriated by the legislature for
  that power, duty, function, program, or activity.
         (b)  The Texas Facilities Commission and the Texas School for
  the Blind and Visually Impaired shall enter into a memorandum of
  understanding as provided by Subsection (h-1), Section 30.022,
  Education Code, as added by this Act, that:
               (1)  identifies in detail the applicable powers and
  duties that are transferred between the two agencies by this Act;
  and
               (2)  establishes a plan for the identification and
  transfer of the records, personnel, property, and unspent
  appropriations of the Texas School for the Blind and Visually
  Impaired that are used for purposes of the commission's powers and
  duties directly related to the maintenance of the school's physical
  facilities under Section 30.022, Education Code.
         SECTION 36.  (a)  Not later than January 1, 2014, the
  following are transferred from the Texas School for the Deaf to the
  Texas Facilities Commission:
               (1)  the powers, duties, functions, programs, and
  activities of the Texas School for the Deaf relating to the
  maintenance of the school's physical facilities;
               (2)  any obligations and contracts of the Texas School
  for the Deaf that are directly related to implementing a power,
  duty, function, program, or activity transferred under this
  subsection; and
               (3)  all property and records in the custody of the
  Texas School for the Deaf that are related to a power, duty,
  function, program, or activity transferred under this subsection
  and all funds appropriated by the legislature for that power, duty,
  function, program, or activity.
         (b)  The Texas Facilities Commission and the Texas School for
  the Deaf shall enter into a memorandum of understanding as provided
  by Subsection (h-1), Section 30.052, Education Code, as added by
  this Act, that:
               (1)  identifies in detail the applicable powers and
  duties that are transferred between the two agencies by this Act;
  and
               (2)  establishes a plan for the identification and
  transfer of the records, personnel, property, and unspent
  appropriations of the Texas School for the Deaf that are used for
  purposes of the commission's powers and duties directly related to
  the maintenance of the school's physical facilities under Section
  30.052, Education Code.
         SECTION 37.  The Texas Facilities Commission shall:
               (1)  not later than January 1, 2014:
                     (A)  develop the qualifying project review
  guidelines required by Section 2165.352, Government Code, as added
  by this Act;
                     (B)  develop the qualifying project proposal fee
  schedule required by Section 2165.353, Government Code, as added by
  this Act; and
                     (C)  adopt the comprehensive planning and
  development process required by Section 2166.107, Government Code,
  as added by this Act; and
               (2)  not later than July 1, 2014:
                     (A)  prepare the Capitol Complex master plan
  required by Section 2166.105, Government Code, as added by this
  Act, and submit the plan as required by that section; and
                     (B)  prepare the comprehensive capital
  improvement and deferred maintenance plan required by Section
  2166.108, Government Code, as added by this Act.
         SECTION 38.  Not later than December 1, 2016, the
  Partnership Advisory Commission established under Chapter 2268,
  Government Code, shall submit to the lieutenant governor, the
  speaker of the house of representatives, and the appropriate
  legislative standing committees recommendations on proposed
  amendments to Chapters 2267 and 2268, Government Code.
         SECTION 39.  This Act takes effect immediately if it
  receives a vote of two-thirds of all the members elected to each
  house, as provided by Section 39, Article III, Texas Constitution.  
  If this Act does not receive the vote necessary for immediate