Amend CSHB 2407 (house committee report) on page 4 by striking lines 16 through 19, and substituting the following:
(1)  "Maximum production capacity" means the rated capacity of a well that is measured in gallons per minute of production as certified by the driller of the well or a professional geologist or engineer.