  84R9488 GRM-F
 
  By: Fraser S.B. No. 933
 
 
 
A BILL TO BE ENTITLED
 
AN ACT
  relating to the authority of the Public Utility Commission of Texas
  to review transmission interconnections that enable imports or
  exports from the ERCOT power grid.
         BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
         SECTION 1.  Section 37.051, Utilities Code, is amended by
  adding Subsection (c-1) to read as follows:
         (c-1)  Notwithstanding any other provision of this title, an
  electric utility or municipally owned utility may not interconnect
  a facility to the ERCOT transmission grid that enables additional
  power to be imported into or exported out of the ERCOT power grid
  unless the electric utility or municipally owned utility obtains a
  certificate from the commission stating that public convenience and
  necessity requires or will require the interconnection. The
  commission shall apply Section 37.056 in considering an application
  under this subsection. In addition, the commission must determine
  that the application is consistent with the public interest before
  granting the certificate. The commission may adopt rules necessary
  to implement this subsection.  This subsection does not apply to a
  facility that is in service on December 31, 2014.
         SECTION 2.  This Act takes effect September 1, 2015.