Amend Amendment No. 255 by Leach to CSSB 1 (page 341, prefiled amendment packet) on page 1, by striking line 9 and substituting the following:
2017, except that the department may use money appropriated by this Act from that fund for the planning or construction of a tolled highway if the tolled highway is located in a county with a population of more than 200,000 that is adjacent to a county with a population of more than 3.3 million and the tolled highway:
(1) is an extension or enlargement of a tolled highway for which a design or construction contract was entered into before September 1, 2017; or
(2) consists of one or more segments of the Grand Parkway.