Amend CSSB 1511 (house committee report) as follows:
(1)  On page 8, lines 8 and 9, strike "aquifer storage and recovery projects to meet those needs" and substitute "meeting those needs through the use of aquifer storage and recovery projects, including a project described by rules adopted under Section 11.153 or 11.156".
(2)  Add the following numbered SECTIONS to the bill and renumber the subsequent SECTIONS of the bill accordingly:
SECTION ____.  Section 11.153, Water Code, is amended by amending Subsection (c) and adding Subsections (d), (e), and (f) to read as follows:
(c)  The [This section does not preclude the] commission may consider [from considering] an aquifer storage and recovery project to be a component of a project permitted under this chapter that is not required to be based on the continuous availability of historic, normal stream flow.
(d)  An aquifer storage and recovery project may involve the use of water derived from multiple sources, including a new appropriation of water. Except as provided by Subsection (e), a water right or an amendment to a water right authorizing a new appropriation of water for use in an aquifer storage and recovery project:
(1)  must include any special conditions the commission considers necessary to implement this section;
(2)  may be for water that is not continuously available;
(3)  may authorize the diversion and use of excess flows in a watercourse or stream that would otherwise flow into the Gulf of Mexico; and
(4)  may not interfere with or negatively affect:
(A)  existing water rights in the same river basin as the diversion point for the new appropriation; or
(B)  applicable environmental flow standards adopted under Section 11.1471.
(e)  Before approving an application for a water right or an amendment to a water right for a new appropriation of water in the Rio Grande basin for an aquifer storage and recovery project, the commission shall consider the water accounting requirements for any international water sharing treaty, minutes, and agreement applicable to the Rio Grande basin and the effect of the project on the allocation of water by the Rio Grande watermaster in the middle and lower Rio Grande. The commission may not authorize a new appropriation of water that would result in a violation of a treaty or court decision.
(f)  The commission may adopt rules providing an expedited procedure for acting on an application for a water right or an amendment to a water right under this section.
SECTION ____.  Subchapter D, Chapter 11, Water Code, is amended by adding Section 11.156 to read as follows:
Sec. 11.156.  AMENDMENT TO CONVERT USE FROM RESERVOIR STORAGE TO AQUIFER STORAGE AND RECOVERY. (a) In this section, "aquifer storage and recovery project" has the meaning assigned by Section 27.151.
(b)  A holder of a water right authorizing an appropriation of water for storage in a storage reservoir that has not been constructed may file an application for an amendment to the water right to change the use or purpose for which the appropriation is to be made to storage in an aquifer as part of an aquifer storage and recovery project.
(c)  An application for an amendment to a water right described by Subsection (b) may request an increase in the amount of water that may be diverted or the rate of diversion on the basis of an evaporation credit that takes into account the amount of water that would have evaporated if the storage reservoir had been constructed.
(d)  An application for an amendment to a water right described by Subsection (b):
(1)  is exempt from any notice and hearing requirements of a statute, commission rule, or permit condition and may not be referred to the State Office of Administrative Hearings for a contested case hearing if the application does not request:
(A)  an increase in the amount of water that may be diverted or the rate of diversion; or
(B)  a change in the diversion point; and
(2)  is subject to the notice and hearing requirements of this chapter if the application requests:
(A)  an increase in the amount of water that may be diverted or the rate of diversion, including an increase on the basis of an evaporation credit; or
(B)  a change in the diversion point.
(e)  If the commission grants an application for an amendment to a water right described by Subsection (d)(2), the commission shall include in the amendment any special conditions the commission considers necessary to:
(1)  protect existing water rights; and
(2)  comply with any applicable environmental flow standards established under Section 11.1471.
(f)  The commission may adopt rules providing an expedited procedure for acting on an application for an amendment to a water right described by Subsection (b).