A BILL TO BE ENTITLED
|
|
AN ACT
|
|
relating to the regulation of cross-border electric generating |
|
facilities. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Subchapter D, Chapter 39, Utilities Code, is |
|
amended by adding Section 39.159 to read as follows: |
|
Sec. 39.159. SWITCHABLE ELECTRIC GENERATING FACILITIES FOR |
|
CROSS-BORDER DISPATCH. (a) In this section: |
|
(1) "Load shedding condition" means a temporary |
|
condition on a power grid that requires or may require the |
|
interruption of firm load. |
|
(2) "Mexican power grid" means the electric power grid |
|
in the northeast region of the United Mexican States. |
|
(b) The commission shall adopt rules to encourage the |
|
development of switchable electric generating facilities that: |
|
(1) are located in this state; and |
|
(2) consist of multiple electric generating units each |
|
of which: |
|
(A) can dispatch into only a single grid at any |
|
given time but is capable of synchronizing with and dispatching |
|
into the ERCOT power grid and the Mexican power grid at different |
|
times; and |
|
(B) may be called on by ERCOT to address a load |
|
shedding condition. |
|
(c) The rules must allow and encourage the adoption of a |
|
binding coordination agreement by the operators of ERCOT and the |
|
Mexican power grid to govern the dispatching of energy into the |
|
ERCOT power grid and the Mexican power grid from a switchable |
|
electric generating facility described by Subsection (b). |
|
(d) For an agreement described by Subsection (c) that |
|
requires that a new switchable electric generating facility have a |
|
nameplate output at least 35 percent of which is from electric |
|
generating units that, under the agreement, are committed to serve |
|
the ERCOT power grid to the exclusion of the Mexican power grid |
|
during an ERCOT load shedding condition, regardless of whether a |
|
load shedding condition exists on the Mexican power grid, the rules |
|
must: |
|
(1) provide reasonable assurance that access to an |
|
electric generating unit cannot be denied to the operator of the |
|
Mexican power grid when the unit is called on by the operator, |
|
regardless of whether a load shedding condition exists on the ERCOT |
|
power grid, if the unit is not committed under the agreement to |
|
serve the ERCOT power grid during a load shedding condition on the |
|
ERCOT power grid; and |
|
(2) establish a process for the commission to evaluate |
|
an agreement described by Subsection (c) to determine whether the |
|
agreement qualifies for the protections described by this |
|
subsection. |
|
SECTION 2. The Public Utility Commission of Texas shall |
|
adopt rules as are necessary to implement Section 39.159, Utilities |
|
Code, as added by this Act, not later than March 1, 2018. |
|
SECTION 3. This Act takes effect September 1, 2017. |