A BILL TO BE ENTITLED
|
|
AN ACT
|
|
relating to the purchase of iron and steel products made in the |
|
United States for certain governmental entity projects. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Chapter 2252, Government Code, is amended by |
|
adding Subchapter F to read as follows: |
|
SUBCHAPTER F. CERTAIN CONSTRUCTION AND INSTALLATION PROJECTS |
|
Sec. 2252.201. DEFINITIONS. In this subchapter: |
|
(1) "Governmental entity" means: |
|
(A) this state; or |
|
(B) a board, commission, department, office, or |
|
other agency in the executive branch of state government. |
|
(2) "Manufacturing process" means the application of a |
|
process to alter the form or function of materials or elements of a |
|
product in a manner that adds value and transforms the materials or |
|
elements into a new finished product that is functionally different |
|
from a finished product produced merely from assembling the |
|
materials or elements into a product. |
|
(3) "Produced in the United States" means, with |
|
respect to iron and steel products, a product for which all |
|
manufacturing processes, from initial melting through application |
|
of coatings, occur in the United States, other than metallurgical |
|
processes to refine steel additives. |
|
(4) "Project" means a contract between a governmental |
|
entity and another person to: |
|
(A) construct, remodel, or alter a building, a |
|
structure, or infrastructure, including a road or highway; or |
|
(B) supply a material for a project described by |
|
Paragraph (A). |
|
Sec. 2252.202. UNIFORM PURCHASING CONDITION. Except as |
|
provided by Section 2252.203, the uniform general conditions for a |
|
project in which iron or steel products will be used must require |
|
that the bid documents provided to all bidders and the contract |
|
include a requirement that any iron or steel product used in the |
|
project be produced in the United States. |
|
Sec. 2252.203. EXEMPTIONS. (a) Section 2252.202 does not |
|
apply to a project for which the governing body of the governmental |
|
entity responsible for the project determines that: |
|
(1) iron or steel products produced in the United |
|
States are not: |
|
(A) produced in sufficient quantities; |
|
(B) reasonably available; or |
|
(C) of a satisfactory quality; or |
|
(2) use of iron or steel products produced in the |
|
United States will increase the total cost of the project by more |
|
than 20 percent. |
|
(b) Electrical components, equipment, systems, and |
|
appurtenances necessary for operation are not considered to be iron |
|
or steel products and are exempt from the requirements of Section |
|
2252.202. |
|
Sec. 2252.204. INTERNATIONAL AGREEMENTS. This subchapter |
|
shall be applied in a manner consistent with this state's |
|
obligations under any international agreement. |
|
SECTION 2. Subchapter F, Chapter 2252, Government Code, as |
|
added by this Act, applies only to bid documents submitted or |
|
contracts entered into on or after the effective date of this Act. |
|
SECTION 3. This Act takes effect September 1, 2017. |