|
|
A BILL TO BE ENTITLED
|
|
AN ACT
|
|
|
relating to a study by the Texas Water Development Board of water |
|
needs and availability in this state. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. (a) In this section, "board" means the Texas |
|
Water Development Board. |
|
(b) The board shall: |
|
(1) conduct a study of water needs and availability in |
|
this state; and |
|
(2) use the results of the study to produce a |
|
comprehensive water resources map. |
|
(c) The study must consider: |
|
(1) opportunities for, obstacles to, and costs |
|
associated with the development of new sources of water, including |
|
but not limited to the diversion of water from contiguous states, |
|
the use of flood control diversion channels, and the reuse of water |
|
associated with oil and gas operations; |
|
(2) potential locations of facilities for the |
|
desalination of marine seawater and brackish groundwater; |
|
(3) the allocation of costs associated with the |
|
transportation of desalinated marine seawater and brackish |
|
groundwater from the place of production to end users; |
|
(4) the potential for the use of public-private |
|
partnerships for water development projects in this state; and |
|
(5) methods to ensure that stakeholders from all water |
|
user groups are included in the development of plans for the use of |
|
water in this state. |
|
(d) In conducting the study, the board may consult with the |
|
Texas Commission on Environmental Quality. |
|
(e) Not later than December 1, 2018, the board shall submit |
|
to each standing committee of the legislature having primary |
|
jurisdiction over water development: |
|
(1) a report of the findings of the study conducted |
|
under this section; and |
|
(2) the map developed by the board under Subsection |
|
(b) of this section. |
|
SECTION 2. This Act takes effect September 1, 2017. |
|
|
|
* * * * * |