This website will be unavailable from Friday, April 26, 2024 at 6:00 p.m. through Monday, April 29, 2024 at 7:00 a.m. due to data center maintenance.

BILL ANALYSIS

 

 

Senate Research Center

H.B. 853

86R4569 GRM-F

By: Moody et al. (Rodr�guez)

 

Business & Commerce

 

4/24/2019

 

Engrossed

 

 

 

AUTHOR'S / SPONSOR'S STATEMENT OF INTENT

 

It has been noted that advanced metering and meter information networks have been deployed in approximately seven million homes in the ERCOT power region in Texas, providing customers with cost savings and operational benefits including enhanced energy management tools and faster outage response times. It has been further noted that, although ERCOT utilities are explicitly permitted to recover costs associated with the deployment of these meters and networks, there is ambiguity as to whether non-ERCOT utilities such as El Paso Electric would similarly be able to recover the costs associated with deploying advanced meters and meter information networks. H.B. 853 seeks to explicitly authorize certain non-ERCOT electric utilities to recover those costs.

 

H.B. 853 amends current law relating to the deployment of advanced metering and meter information networks in certain areas outside of ERCOT.

 

RULEMAKING AUTHORITY

 

This bill does not expressly grant any additional rulemaking authority to a state officer, institution, or agency.

 

SECTION BY SECTION ANALYSIS

 

SECTION 1. Amends Subchapter L, Chapter 39, Utilities Code, by adding Section 39.5521, as follows:

 

Sec. 39.5521. METERING. (a) Authorizes an electric utility subject to this subchapter (Transition to Competition and Other Provisions For Certain Areas Outside of ERCOT) that elects to deploy advanced metering and meter information networks to, notwithstanding Section 39.552 (Cost-of-Service Regulation), recover reasonable and necessary costs incurred in deploying advanced metering and meter information networks. Provides that an electric utility that elects to deploy advanced metering or meter information networks is subject to Public Utility Commission of Texas (PUC) rules adopted under Sections 39.107(h) (relating to requiring the PUC to establish a nonbypassable surcharge for an electric utility or transmission and distribution utility to use to recover reasonable and necessary costs incurred in deploying advanced metering and meter information networks to residential customers and nonresidential customers other than those required by the independent system operator to have an interval data recorder meter) and (k) (relating to requiring the PUC by rule to prohibit an electric utility or transmission and distribution utility from selling, sharing, or disclosing information generated, provided, or otherwise collected from an advanced metering system or meter information network, including certain information). Requires the PUC to ensure that any deployment plan approved under this section and any related customer surcharge:

 

(1) are not applicable to customer accounts that receive service at transmission voltage; and

 

(2) are consistent with PUC rules related to advanced metering systems regarding:

 

(A) customer protections;

 

(B) data security, privacy, and ownership; and

 

(C) options given consumers to continue to receive service through a non‑advanced meter.

 

(b) Requires an electric utility subject to this subchapter that elects to deploy an advanced meter information network to deploy the network as rapidly as practicable to allow customers to better manage energy use and control costs.

 

SECTION 2. Effective date: upon passage or September 1, 2019.