A BILL TO BE ENTITLED
|
|
AN ACT
|
|
relating to permits for certain injection wells that transect a |
|
portion of the Edwards Aquifer. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Sections 27.0516(a)(1) and (3), Water Code, are |
|
amended to read as follows: |
|
(1) "Edwards Aquifer" means that portion of an arcuate |
|
belt of porous, waterbearing limestones composed of the Edwards |
|
Formation, Georgetown Formation, Comanche Peak Formation, Salmon |
|
Peak Limestone, McKnight Formation, West Nueces Formation, Devil's |
|
River Limestone, Person Formation, Kainer Formation, and Edwards |
|
Group, together with the Upper Glen Rose Formation where there is a |
|
significant hydrological connection to the overlying Edwards Group |
|
[trending from west to east to northeast through Kinney, Uvalde,
|
|
Medina, Bexar, Kendall, Comal, Hays, Travis, and Williamson
|
|
Counties]. The permeable aquifer units generally overlie the |
|
less-permeable Glen Rose Formation to the south[, overlie the
|
|
less-permeable Comanche Peak and Walnut Formations north of the
|
|
Colorado River,] and underlie the less-permeable Del Rio Clay |
|
regionally. |
|
(3) "Fresh water" means surface water or groundwater, |
|
without regard to whether the water has been physically, |
|
chemically, or biologically altered, that: |
|
(A) contains a total dissolved solids |
|
concentration of not more than 1,000 milligrams per liter; [and] |
|
(B) meets the water quality standards for public |
|
drinking water established by commission rule; and |
|
(C) is otherwise suitable as a source of drinking |
|
water supply. |
|
SECTION 2. Sections 27.0516(b), (f), (h), (k), and (n), |
|
Water Code, are amended to read as follows: |
|
(b) This section applies only to the portion of the Edwards |
|
Aquifer that is within the geographic area circumscribed by the |
|
external boundaries of the Barton Springs-Edwards Aquifer |
|
Conservation District but is not in the jurisdiction [that
|
|
district's territory or the territory] of the Edwards Aquifer |
|
Authority. |
|
(f) The commission by general permit may authorize: |
|
(1) an activity described by Subsection (e); |
|
(2) an injection well that transects and isolates the |
|
saline portion of the Edwards Aquifer and terminates in a lower |
|
aquifer for the purpose of injecting: |
|
(A) concentrate from a desalination facility; or |
|
(B) fresh water as part of an engineered aquifer |
|
storage and recovery facility; |
|
(3) an injection well that terminates in that part of |
|
the saline portion of the Edwards Aquifer that has a total dissolved |
|
solids concentration of more than 10,000 milligrams per liter for |
|
the purpose of injecting into the saline portion of the Edwards |
|
Aquifer: |
|
(A) concentrate from a desalination facility, |
|
provided that the injection well must be at least three miles from |
|
the closest outlet of Barton Springs; or |
|
(B) fresh water as part of an engineered aquifer |
|
and storage recovery facility, provided that each well used for |
|
injection or withdrawal from the facility must be at least three |
|
miles from the closest outlet of Barton Springs; [or] |
|
(4) an injection well that transects or terminates in |
|
the Edwards Aquifer for: |
|
(A) aquifer remediation; |
|
(B) the injection of a nontoxic tracer dye as |
|
part of a hydrologic study; or |
|
(C) another beneficial activity that is designed |
|
and undertaken for the purpose of increasing protection of an |
|
underground source of drinking water from pollution or other |
|
deleterious effects; or |
|
(5) the injection of fresh water into a well that |
|
transects the Edwards Aquifer provided that: |
|
(A) the well isolates the Edwards Aquifer and |
|
meets the construction and completion standards adopted by the |
|
commission under Section 27.154; |
|
(B) the well is part of an engineered aquifer |
|
storage and recovery facility; |
|
(C) the injected water is sourced from a public |
|
water system, as defined by commission rule, that is permitted by |
|
the commission; and |
|
(D) the injection complies with the provisions of |
|
Subchapter G that are not in conflict with this section. |
|
(h) Rules adopted or a general permit issued under this |
|
section: |
|
(1) must require that an injection well authorized by |
|
the rules or permit be monitored by means of: |
|
(A) one or more [a] monitoring wells [well] |
|
operated by the injection well owner if the commission determines |
|
that there is an underground source of drinking water in the area of |
|
review that is potentially affected by the injection well; or |
|
(B) if Paragraph (A) does not apply, one or more |
|
[a] monitoring wells [well] operated by a party other than the |
|
injection well owner, provided that all results of monitoring are |
|
promptly made available to the injection well owner; |
|
(2) must ensure that an authorized activity will not |
|
result in the waste or pollution of native groundwater [fresh
|
|
water]; |
|
(3) may not authorize an injection well under |
|
Subsection (f)(2), [or] (3), or (5) unless the well is initially |
|
associated with a small-scale research project designed to evaluate |
|
the long-term feasibility and safety of: |
|
(A) the injection of concentrate from a |
|
desalination facility; or |
|
(B) an aquifer storage and recovery project; |
|
(4) must require any authorization granted to be |
|
renewed at least as frequently as every 10 years; |
|
(5) must require that an injection well authorized |
|
under Subsection (f)(2)(A) or (3)(A) be monitored on an ongoing |
|
basis by or in coordination with the well owner and that the well |
|
owner file monitoring reports with the commission at least as |
|
frequently as every three months; [and] |
|
(6) must ensure that any injection well authorized for |
|
the purpose of injecting concentrate from a desalination facility |
|
does not transect the fresh water portion of the Edwards Aquifer; |
|
and |
|
(7) must be consistent with the provisions of |
|
Subchapter G that are not in conflict with this section. |
|
(k) Notwithstanding Subsection (h)(3), a general permit may |
|
authorize the owner of an injection well authorized under |
|
Subsection (f)(2), [or] (3), or (5) to continue operating the well |
|
for the purpose of implementing the desalination or engineered |
|
aquifer storage and recovery project following completion of the |
|
small-scale research project, provided that: |
|
(1) the injection well owner timely submits the |
|
information collected as part of the research project, including |
|
monitoring reports and information regarding the environmental |
|
impact of the well, to the commission; |
|
(2) the injection well owner, following the completion |
|
of studies and monitoring adequate to characterize risks to the |
|
fresh water portion of the Edwards Aquifer, the Trinity Aquifer, or |
|
[and] other native groundwater [fresh water] associated with the |
|
continued operation of the well, and at least 90 days before the |
|
date the owner initiates commercial well operations, files with the |
|
commission a notice of intent to continue operation of the well |
|
after completion of the research project; and |
|
(3) the commission, based on the studies and |
|
monitoring, the report provided by Texas State University--San |
|
Marcos under Subsection (l)(2), and any other reasonably available |
|
information, determines that continued operation of the injection |
|
well as described in the notice of intent does not pose an |
|
unreasonable risk to the fresh water portion of the Edwards |
|
Aquifer, the Trinity Aquifer, or other native groundwater [fresh
|
|
water] associated with the continued operation of the well. |
|
(n) If the commission preliminarily determines that |
|
continued operation of the injection well would pose an |
|
unreasonable risk to the fresh water portion of the Edwards |
|
Aquifer, the Trinity Aquifer, or other native groundwater [fresh
|
|
water] associated with the continued operation of the well, the |
|
commission shall notify the operator and specify, if possible, what |
|
well modifications or operational controls would be adequate to |
|
prevent that unreasonable risk. If the operator fails to modify the |
|
injection well as specified by the commission, the commission shall |
|
require the operator to cease operating the well. |
|
SECTION 3. This Act takes effect immediately if it receives |
|
a vote of two-thirds of all the members elected to each house, as |
|
provided by Section 39, Article III, Texas Constitution. If this |
|
Act does not receive the vote necessary for immediate effect, this |
|
Act takes effect September 1, 2019. |